Tradewinds 23 Tent Labor / Generators / HVAC / Electrical

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
W569QE-23-Q-0009
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Camp Stephenson (79QF+VMV, Waterloo, Guyana), Camp Seweyo (7P7X+X8J, Low Wood, Guyana), Airbase London (Fpwx+HGM, Timehri, Guyana) Demerara-Mahaica Guyana

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice seeks labor services to support tent setup and related infrastructure in Guyana to be completed by July 12, 2023. The Department of the Army will procure personnel, equipment, materials and services to unload containers; assemble and disassemble tents with and without flooring; and set up HVAC systems, generators and electrical outlets at multiple locations. Questions must be submitted by April 27, 2023 to the Contracting Officer via email. The attached performance work statement provides additional requirements including providing foremen and laborers at each site to complete tasks such as unloading 92 tents and setting up 1,100 chairs by the required dates.

There is no set-aside designated for this procurement. The contractor must furnish fully operational HVAC units, three 200kw generators and 564 electrical outlets. The period of performance spans July 1 through August 3, 2023 for setup activities at locations in Guyana, with tear down activities occurring between July 27-August 3, 2023. The pre-solicitation notice does not specify an estimated value but provides detailed requirements for supporting infrastructure for over 1,000 personnel.

Notice text

This is a Pre-Solicitation to give industry time to plan and begin quote construction. This Pre-Solicitation will not result in an award. The full solicitaion will be published in approximately 6 days. All questions shall be sent via email NLT 27 April 23, 1700 EST to MAJ Calvin Taylor at: calvin.w.taylor.mil@army.mil or at +1 931-206-1891.

The Contractor shall provide services for all labor, transportation, equipment, materials necessary to perform unloading and loading of containers for all tasks associated with set-up in Part 5 of the attached performance work statement (PWS). The Contractor shall provide personnel to complete tent set-up with services fully functional NLT 12 July 2023. The Contractor shall provide and set-up HVAC systems, generators, and electrical outlets in support of the tents NLT 12 July 2023. HVAC systems provided must be those provided by industry to cool a room to between sixty-eight (68) and seventy-five (75) degrees Fahrenheit at all times. The Generators provided must be those provided by industry that provide an output of 200 Killowatts. The Contractor shall work with the Contracting Officer (KO) and the Contracting Officer Representative (COR) to define placement of equipment at each location. The Contractor will have a window of 27 July to 03 August, 2023 to perform all tasks associated with the breakdown at the locations and dates specified in Attacment 1 of the PWS. 

The Contractor shall begin work as early as 01 July 23, and it may be as late as 06 July 23 depending on vessel arrival with Government provided equipment. The Contracting Officer's Representative will coordinate with the Contractor for exact timeline within thirty-six hours of vessel arrival.

Files

File Type Posted
TW23 GUY PWS Tent Labor_FINAL.pdf PDF

Notice history

Notice Type Posted
W569QE-23-Q-0009 - Tradewinds 23 Tent Labor / Generators / HVAC / Electrical - Presolicitation Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Soldier Crew, Tents and Components, 8340-01-359-0084 NAICS 314910 Clothing and Textiles No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity