Tower Roof Replacement at Pomme de Terre Lake

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912DQ21Q1027
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
23816 Roofing Contractors
Place of performance
Hermitage, Missouri 65668, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Updated 24 Jun 2021-  Amendment 0002  Extended the due date of the solicitaion to 30- Jun 2021 at 1200.  Also included is the attached document containing pictures of core samples taken of various locations on the roof.

Updated 17 Jun 2021: Amendment 0001  Federal Acquisition Regulation (FAR) Clauses 52.217-5, 52.217- 7 to solicitation and Drawings Package added to the announcment. 

`

The work covered in this section is outlined as a summary of work requirements common to all the work, locations and items of work involved. Specific requirements for materials, processes, performance, quality, and installation are provided under the technical sections of these specifications.

Tower Roof

Roof replacement is located on the Pomme de Terre Control Tower. The current EPDM (ethylene propylene diene terpolymer) flat roof system was replaced in 2013 but has suffered deterioration due to a tear and missing section in the system.  Upon completion of original construction it was also noticed that newly installed system did not allow for positive drainage to the roof drain, but instead ponded water. The only access to the tower is via concrete tower bridge that connects the tower to the embankment.

Access to the roof is restricted to a series of ladders that are internal to the structure and leads to a roof access hatch.

Project Office Roof

Roof replacement is located on the Pomme de Terre Project Office. The current EPDM flat roof system was replaced in the early 1990’s but has begun to deteriorate as it progresses toward the end of its service life. The project consists of both an upper and lower roof as depicted in the contract drawings. There are several perimeter seams that have begun to wrinkle and allowing water to penetrate the sheathing. It has also been observed that both roofs pond water in areas prior to draining into the gutter system.

Update #2 ·

Updated 17 Jun 2021:  Federal Acquisition Regulation (FAR) Clauses 52.217-5, 52.217- 7 to solicitation and Drawings Package added to the announcment. 

`

The work covered in this section is outlined as a summary of work requirements common to all the work, locations and items of work involved. Specific requirements for materials, processes, performance, quality, and installation are provided under the technical sections of these specifications.

Tower Roof

Roof replacement is located on the Pomme de Terre Control Tower. The current EPDM (ethylene propylene diene terpolymer) flat roof system was replaced in 2013 but has suffered deterioration due to a tear and missing section in the system.  Upon completion of original construction it was also noticed that newly installed system did not allow for positive drainage to the roof drain, but instead ponded water. The only access to the tower is via concrete tower bridge that connects the tower to the embankment.

Access to the roof is restricted to a series of ladders that are internal to the structure and leads to a roof access hatch.

Project Office Roof

Roof replacement is located on the Pomme de Terre Project Office. The current EPDM flat roof system was replaced in the early 1990’s but has begun to deteriorate as it progresses toward the end of its service life. The project consists of both an upper and lower roof as depicted in the contract drawings. There are several perimeter seams that have begun to wrinkle and allowing water to penetrate the sheathing. It has also been observed that both roofs pond water in areas prior to draining into the gutter system.

Update #1 ·

The work covered in this section is outlined as a summary of work requirements common to all the work, locations and items of work involved. Specific requirements for materials, processes, performance, quality, and installation are provided under the technical sections of these specifications.

Tower Roof

Roof replacement is located on the Pomme de Terre Control Tower. The current EPDM (ethylene propylene diene terpolymer) flat roof system was replaced in 2013 but has suffered deterioration due to a tear and missing section in the system.  Upon completion of original construction it was also noticed that newly installed system did not allow for positive drainage to the roof drain, but instead ponded water. The only access to the tower is via concrete tower bridge that connects the tower to the embankment.

Access to the roof is restricted to a series of ladders that are internal to the structure and leads to a roof access hatch.

Project Office Roof

Roof replacement is located on the Pomme de Terre Project Office. The current EPDM flat roof system was replaced in the early 1990’s but has begun to deteriorate as it progresses toward the end of its service life. The project consists of both an upper and lower roof as depicted in the contract drawings. There are several perimeter seams that have begun to wrinkle and allowing water to penetrate the sheathing. It has also been observed that both roofs pond water in areas prior to draining into the gutter system.

Files

Notice history

Notice Type Posted
Tower Roof Replacement at Pomme de Terre Lake Award Award Notice
This notice Latest solicitation Solicitation
Tower Roof Replacement at Pomme de Terre Lake Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors