Core #1

Core #2

Core #3

US Army Corps of Engineers Pomme de Terre Lake Project, Hermitage, MO

Material removed from core was 4.5 Inch

Metal Deck below roof material

Core #1 Project Office

Material removed from core was 4.5 Inch

– No photo of core material placed back in hole from drill attachment

Core #2 Project Office

Metal Deck below roof material

Core #3 Project Office

Metal Deck below roof material

Material removed from core was 4.5 Inch – No photo of core material placed back in hole from drill attachment

Control Tower

Material removed from core was 1.5 Inch

– No photo of core material placed back in hole from drill attachment as it fell apart

Control Tower Roof Location