Tipsaw - Goldenrod Group Shelter and Electrification Hoosier National Forest
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 12445521Q0151
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- 5411 Rigid Wall Shelters
- Place of performance
- Tell City, Indiana 47586, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
The purpose of Amendment 0001 is to 1) update Schedule of Items B.1 Hoosier National Forest
Tipsaw Goldenrod Group Shelter, and 2) answer questions from the site visit held on
9/1/2021.
TIPSAW PRIMROSE & GOLDENROD SITE ELECTRIFICATION Schedule of Items remains the same as well
as all other terms and conditions.
Please return a signed copy of the Amendment 0001 with your quote by 0700 CT on 09/13/2021
acknowledging the changes as written above.
Tipsaw - Goldenrod Group Shelter and Electrification
Hoosier National Forest
Part 1 - GENERAL REQUIREMENTS - Goldenrod Group Shelter
This 16 x 22’ shelter shall be constructed on a reinforced concrete slab with piers supporting the structures 8”x8” pressure treated columns. The roof shall be constructed of trusses using steel gusset plates on both sides of the trusses. The decking shall be 2x8 T&G planking set on 4”x6” purlins and covered by a standing seam roof. 4 led lights to be provided along with one duplex GFCI waterproof receptacle. See contract specifications for details.
Part 2 – GENERAL REQUIREMENTS - Primrose & Goldenrod Campsite Electrification
The Contractor shall construct the following:
a. Coordinate and Install new transformer and primary underground conductors from the existing Gatbrier transformer to the site located on the drawings with Southern Indiana Power (SIP) Pg E-01.
b. Install 6 50-amp RV pedestals on the Primrose loop and 5 50-amp RV Pedestals on the Goldenrod Loop.
c. Remove the existing HOST site RV Pedestal.
d. Install new underground service conductors and feeders to the 11 RV pedestals and to the future shelters located on the plans.
e. At the shelter sites install ground boxes one each at the shelter location to coil the wire until the structures are constructed.
f. Place an electrical panel near the transformer as shown on the drawings.
g. The locations and descriptions of all work items are displayed on the drawings and included in the specifications.
Full combined synopsis/solicitation attached includes statement of work, maps, drawings, and wage determination.
Federal Acquisition Circular 2021-06 July 12, 2021
100% set-aside for Small Business
NAICS Code 237990
Part 1 HOF-CON Tipsaw Goldenrod Group Shelter FY 2021
Product/Service Code: 5411
Product/Service Description: RIGID WALL SHELTERS
Part 2 Tipsaw Primrose & Goldenrod Group Site Elec FY
2021.
Product/Service Code: N061
Product/Service Description: INSTALLATION OF
EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION
EQUIPMENT
Site Visit Scheduled 09/01/2021 1100 CT
Quotes due September 13, 2021 0700 CT
Update #1 ·
Tipsaw - Goldenrod Group Shelter and Electrification
Hoosier National Forest
Part 1 - GENERAL REQUIREMENTS - Goldenrod Group Shelter
This 16 x 22’ shelter shall be constructed on a reinforced concrete slab with piers supporting the structures 8”x8” pressure treated columns. The roof shall be constructed of trusses using steel gusset plates on both sides of the trusses. The decking shall be 2x8 T&G planking set on 4”x6” purlins and covered by a standing seam roof. 4 led lights to be provided along with one duplex GFCI waterproof receptacle. See contract specifications for details.
Part 2 – GENERAL REQUIREMENTS - Primrose & Goldenrod Campsite Electrification
The Contractor shall construct the following:
a. Coordinate and Install new transformer and primary underground conductors from the existing Gatbrier transformer to the site located on the drawings with Southern Indiana Power (SIP) Pg E-01.
b. Install 6 50-amp RV pedestals on the Primrose loop and 5 50-amp RV Pedestals on the Goldenrod Loop.
c. Remove the existing HOST site RV Pedestal.
d. Install new underground service conductors and feeders to the 11 RV pedestals and to the future shelters located on the plans.
e. At the shelter sites install ground boxes one each at the shelter location to coil the wire until the structures are constructed.
f. Place an electrical panel near the transformer as shown on the drawings.
g. The locations and descriptions of all work items are displayed on the drawings and included in the specifications.
Full combined synopsis/solicitation attached includes statement of work, maps, drawings, and wage determination.
Federal Acquisition Circular 2021-06 July 12, 2021
100% set-aside for Small Business
NAICS Code 237990
Part 1 HOF-CON Tipsaw Goldenrod Group Shelter FY 2021
Product/Service Code: 5411
Product/Service Description: RIGID WALL SHELTERS
Part 2 Tipsaw Primrose & Goldenrod Group Site Elec FY
2021.
Product/Service Code: N061
Product/Service Description: INSTALLATION OF
EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION
EQUIPMENT
Site Visit Scheduled 09/01/2021 1100 CT
Quotes due September 13, 2021 0700 CT
Files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 Tip-Saw Goldenrod solicitation signed.pdf | ||
| 12445521Q0151 Combined RFQ Tipsaw.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Tipsaw - Goldenrod Group Shelter and Electrification Hoosier National Forest | Award Notice | |
| This notice | Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity