TF33 work platforms
Award Notice Posted
- Solicitation number
- FA8132-16-R-0002
- Agency
-
AFLCMC Tinker AFB
Lifecycle Management Center, Department of Defense
- Awarded
- to Kern Steel Fabrication, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- FA8132-16-C-0007 Federal contract award
- NAICS code
- 333923 Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
8 versions
Update #8 · Latest ·
Added: Aug 02, 2016 5:04 pm
**** ADDED 2 AUG 16 ****
The purpose of this amendment is to provide the regulatory guidances required for this requirement. Verification of your compliance is required to the primary point of contact no later than Sunday, Aug 7th by 11:59 PM Central Standard Time.
Update #7 ·
Added: Jun 02, 2016 9:11 am
****ADDED 2 JUN 16 ****
1) We are uncertain of how to fill out Section L, Part 6.0, Item (2) Government Offices. What information is required here?
Answer: Please disregard Part 6.0 (Other Information Required), Item 2. This requirement will be administrated through our office.
2) Section L, Part 5.0, Item (1c) requires completion of "Section K - Representations, Certification, and Other Statement of Offerors. Offeror should complete all appropriate blocks of Section K and place "N/A" in the blocks that are not applicable to the offeror's proposal."
Answer: Please disregard Section L, Part 5.0, Item (1c) as it is not included in the RFP.
Update #6 ·
Added: May 26, 2016 12:05 pm
ADDED 26 May 16
********************QUESTIONS/ANSWERS**********************
Question 1. The specifications of the SOW indicate a cantilevered-design platform. Would a non-cantilever-type solution be considered if it met or exceeded the operational requirements?
Answer 1: No, the platforms must be a mechanical cantilever type.
Question 2. The SOW specifies that the motion be controlled by means of a PLC. It appears that the current "newer" units on the floor may simply employ limit switches and relays; is this acceptable for the new systems, or is computer control mandatory?
Answer 2: The platforms must be pushbutton operated and PLC controlled.
Question 3. What will be the operational voltage supplied for powering the lifting mechanism?
Answer 3: 480V, 3-phase is available at the electrical bus.
Question 4. The 6 inches per second travel speed seems to be somewhat excessive when moving a large platform that interfaces closely with very expensive engines. Is that actually what has been determined to be the optimal speed of travel? Would a variable frequency drive be desirable that would allow speeds "as high as" 6"/sec, but could be moved at a much slower rate when practical?
Answer 4: It would be acceptable for the speed to be adjustable if the 30ft/min can be met.
Update #5 ·
Added: May 12, 2016 3:46 pm
Modified: May 16, 2016 10:06 amTrack Changes
ADDED 12-May-16
**** PLEASE SEE ATTACHED REVISED STATEMENT OF WORK****
5352.215-9001 NOTICE OF PRE-BID/PRE-PROPOSAL CONFERENCE (MAY 1996)
(a) A pre-bid/pre-proposal conference will be conducted at Bldg 9001, Tinker AFB on 24-May-16 at 1330 for the purpose of answering questions regarding this solicitation.
(b) Submit the names of all attendees (not to exceed 4) to lakiesha.hawkins@us.af.mil prior to 20-May-16. This information must be provided in advance in order to ensure access to the military base/conference site and adequate seating for the conference attendees.
(c) Bidders/Offerors are requested to submit questions to the point of contact noted above not later than 20-May-16. Information provided at this conference shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
(d) A record of the conference shall be made and furnished to all prospective bidders/offerors. The record should include minutes of the meeting, including questions (on a non-attribution basis) and answers.
********************QUESTIONS/ANSWERS**********************
QUESTION 1: Part I, Item (4), Section (b.). The existing units are anchored to thefloor, but are free standing as not to tie off to the existing steelstructure. Is the current requirement the same?
ANSWER: The requirement is the same and clarified in the updated SOW
QUESTION 2: Part I, Item (10) Please confirm that government is removing the lifts and all connecting utilities, in full.
ANSWER: This is confirmed and clarified in the updated SOW.
QUESTION 3: Will there be a staging area available for material during the installation?
ANSWER: A staging area will be provided in building 9001.
QUESTION 4: Can you please clarify; does this indicate a working load rating of 3000 lbs, or an engineered proof load rating of 3000 lbs? As required by OSHA, a platform such as this is to be engineered to a 4X factor of the working load rating. If that WLR is 3000 pounds, the proof load would be 12,000 pounds. Is this correct, or does your 3000 pound value include the safety factor?
ANSWER: Yes, in those terms the 3000 pounds would be the working load rating.
Update #4 ·
Added: May 12, 2016 3:46 pm
ADDED 12-May-16
**** PLEASE SEE ATTACHED REVISED STATEMENT OF WORK****
5352.215-9001 NOTICE OF PRE-BID/PRE-PROPOSAL CONFERENCE (MAY 1996)
(a) A pre-bid/pre-proposal conference will be conducted at Bldg 9001, Tinker AFB on 24-May-16 at 1330 for the purpose of answering questions regarding this solicitation.
(b) Submit the names of all attendees (not to exceed 4) to lakiesha.hawkins@us.af.mil prior to 20-May-16. This information must be provided in advance in order to ensure access to the military base/conference site and adequate seating for the conference attendees.
(c) Bidders/Offerors are requested to submit questions to the point of contact noted above not later than 20-May-16. Information provided at this conference shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
(d) A record of the conference shall be made and furnished to all prospective bidders/offerors. The record should include minutes of the meeting, including questions (on a non-attribution basis) and answers.
********************QUESTIONS/ANSWERS**********************
QUESTION 1: Part I, Item (4), Section (b.). The existing units are anchored to thefloor, but are free standing as not to tie off to the existing steelstructure. Is the current requirement the same?
ANDWER: The requirement is the same and clarified in the updated SOW
QUESTION 2: Part I, Item (10) Please confirm that government is removing the lifts and all connecting utilities, in full.
ANDWER: This is confirmed and clarified in the updated SOW.
QUESTION 3: Will there be a staging area available for material during the installation?
ANDWER: A staging area will be provided in building 9001.
Update #3 ·
Added: Apr 29, 2016 10:00 am
ADDED 29-APR-16
NOTICE OF PRE-BID/PRE-PROPOSAL CONFERENCE (MAY 1996)
(a) A pre-bid/pre-proposal conference will be conducted at Bldg 3001, Tinker AFB on 9-May-16 at 1000 for the purpose of answering questions regarding this solicitation.
(b) Submit the names of all attendees (not to exceed 4) to lakiesha.hawkins@us.af.mil prior to 6-May-16. This information must be provided in advance in order to ensure access to the military base/conference site and adequate seating for the conference attendees.
(c) Bidders/Offerors are requested to submit questions to the point of contact noted above not later than 6-May-16. Information provided at this conference shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
(d) A record of the conference shall be made and furnished to all prospective bidders/offerors. The record should include minutes of the meeting, including questions (on a non-attribution basis) and answers.
THIS REQUIREMENT CLOSES 27 MAY 16 AT 3:00 P.M. CENTRAL TIME
Update #2 ·
Added: Apr 20, 2016 3:10 pm Modified: Apr 20, 2016 3:57 pmTrack Changes
THIS IS THE SOLICITATION FOR TF33 WORK PLATFORMS. PLEASE SEE ATTACHED DOCUMENTS:
1. SOLICITATION FA8132-16-R-0002
2. INSTRUCTION TO OFFERORS (ITO) - SECTION L
3. EVALUATION FACTORS - SECTION M
4. STATEMENT OF WORK (SOW)
THIS REQUIREMENT CLOSES 20 MAY 16 AT 3:00 P.M. CENTRAL TIME.
A sources sought synopsis was performed under FA8126-16-Q-0045. The sources sought can be found at:
https://www.fbo.gov/index?s=procurement&mode=form&tab=ntype&id=97bda7e0ceb7ae50b3f403659100c2cc
The requirement was originally pre-solicited under FA8126-16-Q-0045. The pre-solicitation can be found at the below link:
https://www.fbo.gov/index?s=procurement&mode=form&tab=ntype&id=97bda7e0ceb7ae50b3f403659100c2cc
Update #1 ·
Added: Apr 20, 2016 3:10 pm
THIS IS THE SOLICITATION FOR TF33 WORK PLATFORMS. PLEASE SEE ATTACHED DOCUMENTS:
1. SOLICITATION FA8132-16-R-0002
2. INSTRUCTION TO OFFERORS (ITO) - SECTION L
3. EVALUATION FACTORS - SECTION L
4. STATEMENT OF WORK (SOW)
THIS REQUIREMENT CLOSES 20 MAY 16 AT 3:00 P.M. CENTRAL TIME.
A sources sought synopsis was performed under FA8126-16-Q-0045. The sources sought can be found at:
https://www.fbo.gov/index?s=procurement&mode=form&tab=ntype&id=97bda7e0ceb7ae50b3f403659100c2cc
The requirement was originally pre-solicited under FA8126-16-Q-0045. The pre-solicitation can be found at the below link:
https://www.fbo.gov/index?s=procurement&mode=form&tab=ntype&id=97bda7e0ceb7ae50b3f403659100c2cc