TF33 P102 1st Stage Compressor Blade Sets NSN 2840014583129 P/N 578041
Award Notice Posted
- Solicitation number
- FA812119R0030
- Agency
-
AFLCMC Tinker AFB
Lifecycle Management Center, Department of Defense
- Awarded
- to Electron Beam Development Corp
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- FA8121-19-C-0026 Federal contract award
- NAICS code
- 336412 Aircraft Engine and Engine Parts Manufacturing
- PSC
- Not on record
- Place of performance
- 5d853dd48919457c4a42
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Awarded Vendors: Electron Beam Development Corp. Contract Award Dollar Amount: 453,000.00. Contract Award Date: 2019-09-19.
Update #2 ·
Solicitation due 9 September 2019
The Contractor shall provide re-manufacturing requirements for the TF33 Compressor Blades P102C Sets.
Contractor shall perform disassembly, cleaning, inspection and re-manufacture, if applicable, rework and re-identification of the TF33 Compressor Blade Sets. The Contractor shall be a rated re-manufacture facility to re-manufacture TF33 engine components; Contractor must have the re-manufacture capabilities to include appropriate technical data, re-manufacture documents, and license agreements, required to accomplish re-manufacture of TF33 Compressor Blades.
The instructions stipulated are brief, concise statements providing general requirements for re-manufacturing of the TF33 Compressor Blades. These requirements are dependent upon the contractor having overhaul capabilities to include appropriate technical data, manufacturing documents, and change in designs and testing equipment. An Initial Product Evaluation (IPE) will be required only if the contractor facility has not re-manufactured this component previously for the U.S. Air Force. The contractor is responsible for the production, re-manufacture and shall meet the delivery schedule of a quality product.
.
Update #1 ·
The Contractor shall provide re-manufacturing requirements for the TF33 Compressor Blades P102C Sets.
Contractor shall perform disassembly, cleaning, inspection and re-manufacture, if applicable, rework and re-identification of the TF33 Compressor Blade Sets. The Contractor shall be a rated re-manufacture facility to re-manufacture TF33 engine components; Contractor must have the re-manufacture capabilities to include appropriate technical data, re-manufacture documents, and license agreements, required to accomplish re-manufacture of TF33 Compressor Blades.
The instructions stipulated are brief, concise statements providing general requirements for re-manufacturing of the TF33 Compressor Blades. These requirements are dependent upon the contractor having overhaul capabilities to include appropriate technical data, manufacturing documents, and change in designs and testing equipment. An Initial Product Evaluation (IPE) will be required only if the contractor facility has not re-manufactured this component previously for the U.S. Air Force. The contractor is responsible for the production, re-manufacture and shall meet the delivery schedule of a quality product.
.
Files
| File | Type | Posted |
|---|---|---|
| 2839902_ATTACH.xlsx | XLSX spreadsheet | |
| 2821909_QUALRQMT.pdf | ||
| 2856313_SOW.pdf | ||
| 2857000_CDRL1_REPORT.pdf | ||
| 2821899_RDL_REPORT.pdf | ||
| FA812119R0030.pdf | ||
| 2836709_TRNSPDATA_REPORT.pdf | ||
| 2836713_PKGRQMT_REPORT.pdf | ||
| 2856143_CAVAF.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity