Testing, Adjusting, Calibration, Sound/Noise measurement, Existing Building Commissioning
Awarded Award Notice Posted
- Solicitation number
- TestingandbalanceHVAC
- Agency
- AFLCMC Hanscom AFB Lifecycle Management Center, Department of Defense
- Awarded
- to Airadigm Solutions
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- FA2835-12-P-0039 Federal contract award
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- PSC
- Not on record
- Place of performance
- Hanscom AFB Bedford, Massachusetts 01731, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: Aug 28, 2012 4:31 pm
Modified: Sep 04, 2012 9:31 amTrack Changes
This effort consists of multiple facilities though out Hanscom AFB approximately 4 buildings. This effort includes services of independent testing and balancing and commissioning agents with multidiscipline trade technicians, engineer, and equipment specialists to investigate, evaluate, inspect, test, adjust, calibrate, balance, and commission HVAC systems, mechanical piping system, related electrical system, Johnson Controls system. Any repair work to correct incidental existing deficiencies related to each building will be done with modification. This effort will require work plan, Commission plan, reports, recommendations, sizing, mechanical, electrical, and controls work. Any resultant solicitation may include the following functions to be performed, subject to change depending on varying mission requirements:
a. Testing, adjusting, calibrating and balancing
b. Existing Building Commissioning.
c. Mechanical and associated system maintenance, repairs and services
Update #1 ·
Added: Aug 28, 2012 4:31 pm
This effort consists of multiple facilities though out Hanscom AFB approximately 26 buildings. This effort includes services of independent testing and balancing and commissioning agents with multidiscipline trade technicians, engineer, and equipment specialists to investigate, evaluate, inspect, test, adjust, calibrate, balance, and commission HVAC systems, mechanical piping system, related electrical system, Johnson Controls system. Any repair work to correct incidental existing deficiencies related to each building will be done with modification. This effort will require work plan, Commission plan, reports, recommendations, sizing, mechanical, electrical, and controls work. Any resultant solicitation may include the following functions to be performed, subject to change depending on varying mission requirements:
a. Testing, adjusting, calibrating and balancing
b. Existing Building Commissioning.
c. Mechanical and associated system maintenance, repairs and services
Attachments
| File | Type | Posted |
|---|---|---|
| Questions.doc | DOC document | |
| Bid Schedule TACB and Existing Building Commissioning Service contract Modified By TAN 24 AUG 2012.xlsx | XLSX spreadsheet | |
| Final Performance Work Statement TAB and existing building commissioning 2012 Final TAN 24 Aug 2012.doc | DOC document | |
| Wage Determination 6-19-2012.txt | TXT text file | |
| Buildings.pdf | ||
| HVAC Syn- Sol.doc | DOC document | |
| Sections.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity