About this opportunity
The Department of the Army Corps of Engineers Engineering District Tulsa is seeking a contractor for the Temporary Wall Replacement at Denison Powerhouse in Denison, TX. The project involves comprehensive demolition and reconstruction work, including removing the existing temporary wall, support structure, wood plank flooring, and miscellaneous elements, followed by designing and constructing a new floor grating system and a structurally independent permanent wall. This is a full and open competitive solicitation for a Firm-Fixed Price (FFP) contract that will be awarded using the Lowest Price Technically Acceptable (LPTA) process in accordance with FAR 15.101-2. The solicitation requires contractors to commence work within 10 days after receiving the Notice to Proceed (NTP) and complete all work within 730 calendar days. Performance and Payment Bonds will be required, and the government point of contact is Cheyenne Redemann, who can be reached at Cheyenne.A.Redemann@usace.army.mil.
The solicitation has no specific set-aside designation and is classified under NAICS Category 236220 for Commercial and Institutional Building Construction. The project site is located at the Denison Powerhouse in Denison, TX, with the primary objective of replacing the existing temporary wall without making structural modifications to the current powerhouse structure. Contractors will be subject to liquidated damages provisions if they fail to complete the work within the specified timeframe. The project scope requires a comprehensive approach to demolition and reconstruction, with specific emphasis on designing a new wall system that maintains the structural integrity of the existing powerhouse. The contract will be awarded on a best value continuum, with a focus on the lowest price that meets the technically acceptable criteria. While specific budget ranges are not disclosed, the complexity of the project suggests a significant investment in infrastructure restoration and improvement.
Notice text
13 versions
Update #13 · Latest ·
Project Title: Temporary Wall Replacement at Denison Powerhouse, Denison, TX. The work in this contract includes the demolition and disposal of the existing temporary wall and support structure, demolition and disposal of the existing wood plank flooring and support structure at the Generator Room Level adjacent to the temporary wall structure, the demolition and disposal of miscellaneous elements such as railing and rebar, and the design and construction of a floor grating system on the Generator Room Level as well as a new structurally independent permanent wall and support structure on the north side of the powerhouse. Design and construct the permanent wall system in a manner that will require no structural modifications to the existing powerhouse structure. This is a full and open competitive solicitation for a Firm-Fixed Price (FFP) contract to be awarded under the best value continuum using the Lowest Price Technically Acceptable (LPTA) process in accordance with FAR 15.101-2. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within the proposed number of calendar days (Not to Exceed 730 days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the allowed time. Performance and Payment Bonds will be required. The Government POC for this solicitation is Cheyenne Redemann, Cheyenne.A.Redemann@usace.army.mil. AM 0001 updates the site visit information and adds FAR 52.219-4. AM 0002 extends the proposal due date. AM 0003 updates the second site visit information. AM 0004 extends the proposal due date and adds as-built drawings to Appendix B. AM 0005 updates the third site visit information. AM 0006 extends the proposal due date. AM 0007 extends the proposal due date and updates the fourth site visit information. AM 0008 is hereby issued to incorporate an optional bid item of insulated metal panels. AM 0009 extends the proposal due date and updates the SOW. AM 0010 extends the proposal due date. AM 0011 is hereby issued to incorporate an optional bid item of hybrid wall panel system and update wage determination. AM 0012 extends the proposal due date. AM 0013 extends the proposal due date, updates Section 01 11 00, and provides drawings for Appendix B.
Update #12 ·
Project Title: Temporary Wall Replacement at Denison Powerhouse, Denison, TX. The work in this contract includes the demolition and disposal of the existing temporary wall and support structure, demolition and disposal of the existing wood plank flooring and support structure at the Generator Room Level adjacent to the temporary wall structure, the demolition and disposal of miscellaneous elements such as railing and rebar, and the design and construction of a floor grating system on the Generator Room Level as well as a new structurally independent permanent wall and support structure on the north side of the powerhouse. Design and construct the permanent wall system in a manner that will require no structural modifications to the existing powerhouse structure. This is a full and open competitive solicitation for a Firm-Fixed Price (FFP) contract to be awarded under the best value continuum using the Lowest Price Technically Acceptable (LPTA) process in accordance with FAR 15.101-2. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within the proposed number of calendar days (Not to Exceed 730 days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the allowed time. Performance and Payment Bonds will be required. The Government POC for this solicitation is Cheyenne Redemann, Cheyenne.A.Redemann@usace.army.mil. AM 0001 updates the site visit information and adds FAR 52.219-4. AM 0002 extends the proposal due date. AM 0003 updates the second site visit information. AM 0004 extends the proposal due date and adds as-built drawings to Appendix B. AM 0005 updates the third site visit information. AM 0006 extends the proposal due date. AM 0007 extends the proposal due date and updates the fourth site visit information. AM 0008 is hereby issued to incorporate an optional bid item of insulated metal panels. AM 0009 extends the proposal due date and updates the SOW. AM 0010 extends the proposal due date. AM 0011 is hereby issued to incorporate an optional bid item of hybrid wall panel system and update wage determination. AM 0012 extends the proposal due date. An excel of RFIs and Responses are attached.
Update #11 ·
Project Title: Temporary Wall Replacement at Denison Powerhouse, Denison, TX. The work in this contract includes the demolition and disposal of the existing temporary wall and support structure, demolition and disposal of the existing wood plank flooring and support structure at the Generator Room Level adjacent to the temporary wall structure, the demolition and disposal of miscellaneous elements such as railing and rebar, and the design and construction of a floor grating system on the Generator Room Level as well as a new structurally independent permanent wall and support structure on the north side of the powerhouse. Design and construct the permanent wall system in a manner that will require no structural modifications to the existing powerhouse structure. This is a full and open competitive solicitation for a Firm-Fixed Price (FFP) contract to be awarded under the best value continuum using the Lowest Price Technically Acceptable (LPTA) process in accordance with FAR 15.101-2. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within the proposed number of calendar days (Not to Exceed 730 days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the allowed time. Performance and Payment Bonds will be required. The Government POC for this solicitation is Cheyenne Redemann, Cheyenne.A.Redemann@usace.army.mil. AM 0001 updates the site visit information and adds FAR 52.219-4. AM 0002 extends the proposal due date. AM 0003 updates the second site visit information. AM 0004 extends the proposal due date and adds as-built drawings to Appendix B. AM 0005 updates the third site visit information. AM 0006 extends the proposal due date. AM 0007 extends the proposal due date and updates the fourth site visit information. AM 0008 is hereby issued to incorporate an optional bid item of insulated metal panels. AM 0009 extends the proposal due date and updates the SOW. AM 0010 extends the proposal due date. AM 0011 is hereby issued to incorporate an optional bid item of hybrid wall panel system and update wage determination. AM 0012 extends the proposal due date.
Update #10 ·
Project Title: Temporary Wall Replacement at Denison Powerhouse, Denison, TX. The work in this contract includes the demolition and disposal of the existing temporary wall and support structure, demolition and disposal of the existing wood plank flooring and support structure at the Generator Room Level adjacent to the temporary wall structure, the demolition and disposal of miscellaneous elements such as railing and rebar, and the design and construction of a floor grating system on the Generator Room Level as well as a new structurally independent permanent wall and support structure on the north side of the powerhouse. Design and construct the permanent wall system in a manner that will require no structural modifications to the existing powerhouse structure. This is a full and open competitive solicitation for a Firm-Fixed Price (FFP) contract to be awarded under the best value continuum using the Lowest Price Technically Acceptable (LPTA) process in accordance with FAR 15.101-2. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within the proposed number of calendar days (Not to Exceed 730 days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the allowed time. Performance and Payment Bonds will be required. The Government POC for this solicitation is Cheyenne Redemann, Cheyenne.A.Redemann@usace.army.mil. AM 0001 updates the site visit information and adds FAR 52.219-4. AM 0002 extends the proposal due date. AM 0003 updates the second site visit information. AM 0004 extends the proposal due date and adds as-built drawings to Appendix B. AM 0005 updates the third site visit information. AM 0006 extends the proposal due date. AM 0007 extends the proposal due date and updates the fourth site visit information. AM 0008 is hereby issued to incorporate an optional bid item of insulated metal panels. AM 0009 extends the proposal due date and updates the SOW.
Update #9 ·
Project Title: Temporary Wall Replacement at Denison Powerhouse, Denison, TX. The work in this contract includes the demolition and disposal of the existing temporary wall and support structure, demolition and disposal of the existing wood plank flooring and support structure at the Generator Room Level adjacent to the temporary wall structure, the demolition and disposal of miscellaneous elements such as railing and rebar, and the design and construction of a floor grating system on the Generator Room Level as well as a new structurally independent permanent wall and support structure on the north side of the powerhouse. Design and construct the permanent wall system in a manner that will require no structural modifications to the existing powerhouse structure. This is a full and open competitive solicitation for a Firm-Fixed Price (FFP) contract to be awarded under the best value continuum using the Lowest Price Technically Acceptable (LPTA) process in accordance with FAR 15.101-2. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within the proposed number of calendar days (Not to Exceed 730 days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the allowed time. Performance and Payment Bonds will be required. The Government POC for this solicitation is Cheyenne Redemann, Cheyenne.A.Redemann@usace.army.mil. AM 0001 updates the site visit information and adds FAR 52.219-4. AM 0002 extends the proposal due date. AM 0003 updates the second site visit information. AM 0004 extends the proposal due date and adds as-built drawings to Appendix B. AM 0005 updates the third site visit information. AM 0006 extends the proposal due date. AM 0007 extends the proposal due date and updates the fourth site visit information. AM 0008 is hereby issued to incorporate an optional bid item of insulated metal panels.
Update #8 ·
Project Title: Temporary Wall Replacement at Denison Powerhouse, Denison, TX. The work in this contract includes the demolition and disposal of the existing temporary wall and support structure, demolition and disposal of the existing wood plank flooring and support structure at the Generator Room Level adjacent to the temporary wall structure, the demolition and disposal of miscellaneous elements such as railing and rebar, and the design and construction of a floor grating system on the Generator Room Level as well as a new structurally independent permanent wall and support structure on the north side of the powerhouse. Design and construct the permanent wall system in a manner that will require no structural modifications to the existing powerhouse structure. This is a full and open competitive solicitation for a Firm-Fixed Price (FFP) contract to be awarded under the best value continuum using the Lowest Price Technically Acceptable (LPTA) process in accordance with FAR 15.101-2. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within the proposed number of calendar days (Not to Exceed 730 days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the allowed time. Performance and Payment Bonds will be required. The Government POC for this solicitation is Cheyenne Redemann, Cheyenne.A.Redemann@usace.army.mil. AM 0001 updates the site visit information and adds FAR 52.219-4. AM 0002 extends the proposal due date. AM 0003 updates the second site visit information. AM 0004 extends the proposal due date and adds as-built drawings to Appendix B. AM 0005 updates the third site visit information. AM 0006 extends the proposal due date. AM 0007 extends the proposal due date and updates the fourth site visit information.
Update #7 ·
Project Title: Temporary Wall Replacement at Denison Powerhouse, Denison, TX. The work in this contract includes the demolition and disposal of the existing temporary wall and support structure, demolition and disposal of the existing wood plank flooring and support structure at the Generator Room Level adjacent to the temporary wall structure, the demolition and disposal of miscellaneous elements such as railing and rebar, and the design and construction of a floor grating system on the Generator Room Level as well as a new structurally independent permanent wall and support structure on the north side of the powerhouse. Design and construct the permanent wall system in a manner that will require no structural modifications to the existing powerhouse structure. This is a full and open competitive solicitation for a Firm-Fixed Price (FFP) contract to be awarded under the best value continuum using the Lowest Price Technically Acceptable (LPTA) process in accordance with FAR 15.101-2. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within the proposed number of calendar days (Not to Exceed 730 days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the allowed time. Performance and Payment Bonds will be required. The Government POC for this solicitation is Cheyenne Redemann, Cheyenne.A.Redemann@usace.army.mil. AM 0001 updates the site visit information and adds FAR 52.219-4. AM 0002 extends the proposal due date. AM 0003 updates the second site visit information. AM 0004 extends the proposal due date and adds as-built drawings to Appendix B. AM 0005 updates the third site visit information. AM 0006 extends the proposal due date.
Update #6 ·
Project Title: Temporary Wall Replacement at Denison Powerhouse, Denison, TX. The work in this contract includes the demolition and disposal of the existing temporary wall and support structure, demolition and disposal of the existing wood plank flooring and support structure at the Generator Room Level adjacent to the temporary wall structure, the demolition and disposal of miscellaneous elements such as railing and rebar, and the design and construction of a floor grating system on the Generator Room Level as well as a new structurally independent permanent wall and support structure on the north side of the powerhouse. Design and construct the permanent wall system in a manner that will require no structural modifications to the existing powerhouse structure. This is a full and open competitive solicitation for a Firm-Fixed Price (FFP) contract to be awarded under the best value continuum using the Lowest Price Technically Acceptable (LPTA) process in accordance with FAR 15.101-2. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within the proposed number of calendar days (Not to Exceed 730 days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the allowed time. Performance and Payment Bonds will be required. The Government POC for this solicitation is Cheyenne Redemann, Cheyenne.A.Redemann@usace.army.mil. AM 0001 updates the site visit information and adds FAR 52.219-4. AM 0002 extends the proposal due date. AM 0003 updates the second site visit information. AM 0004 extends the proposal due date and adds as-built drawings to Appendix B. AM 0005 updates the third site visit information.
Update #5 ·
Project Title: Temporary Wall Replacement at Denison Powerhouse, Denison, TX. The work in this contract includes the demolition and disposal of the existing temporary wall and support structure, demolition and disposal of the existing wood plank flooring and support structure at the Generator Room Level adjacent to the temporary wall structure, the demolition and disposal of miscellaneous elements such as railing and rebar, and the design and construction of a floor grating system on the Generator Room Level as well as a new structurally independent permanent wall and support structure on the north side of the powerhouse. Design and construct the permanent wall system in a manner that will require no structural modifications to the existing powerhouse structure. This is a full and open competitive solicitation for a Firm-Fixed Price (FFP) contract to be awarded under the best value continuum using the Lowest Price Technically Acceptable (LPTA) process in accordance with FAR 15.101-2. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within the proposed number of calendar days (Not to Exceed 730 days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the allowed time. Performance and Payment Bonds will be required. The Government POC for this solicitation is Cheyenne Redemann, Cheyenne.A.Redemann@usace.army.mil. AM 0001 updates the site visit information and adds FAR 52.219-4. AM 0002 extends the proposal due date. AM 0003 updates the second site visit information. AM 0004 extends the proposal due date and adds as-built drawings to Appendix B.
Update #4 ·
Project Title: Temporary Wall Replacement at Denison Powerhouse, Denison, TX. The work in this contract includes the demolition and disposal of the existing temporary wall and support structure, demolition and disposal of the existing wood plank flooring and support structure at the Generator Room Level adjacent to the temporary wall structure, the demolition and disposal of miscellaneous elements such as railing and rebar, and the design and construction of a floor grating system on the Generator Room Level as well as a new structurally independent permanent wall and support structure on the north side of the powerhouse. Design and construct the permanent wall system in a manner that will require no structural modifications to the existing powerhouse structure. This is a full and open competitive solicitation for a Firm-Fixed Price (FFP) contract to be awarded under the best value continuum using the Lowest Price Technically Acceptable (LPTA) process in accordance with FAR 15.101-2. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within the proposed number of calendar days (Not to Exceed 730 days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the allowed time. Performance and Payment Bonds will be required. The Government POC for this solicitation is Cheyenne Redemann, Cheyenne.A.Redemann@usace.army.mil. AM 0001 updates the site visit information and adds FAR 52.219-4. AM 0002 extends the proposal due date. AM 0003 updates the second site visit information.
Update #3 ·
Project Title: Temporary Wall Replacement at Denison Powerhouse, Denison, TX. The work in this contract includes the demolition and disposal of the existing temporary wall and support structure, demolition and disposal of the existing wood plank flooring and support structure at the Generator Room Level adjacent to the temporary wall structure, the demolition and disposal of miscellaneous elements such as railing and rebar, and the design and construction of a floor grating system on the Generator Room Level as well as a new structurally independent permanent wall and support structure on the north side of the powerhouse. Design and construct the permanent wall system in a manner that will require no structural modifications to the existing powerhouse structure. This is a full and open competitive solicitation for a Firm-Fixed Price (FFP) contract to be awarded under the best value continuum using the Lowest Price Technically Acceptable (LPTA) process in accordance with FAR 15.101-2. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within the proposed number of calendar days (Not to Exceed 730 days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the allowed time. Performance and Payment Bonds will be required. The Government POC for this solicitation is Cheyenne Redemann, Cheyenne.A.Redemann@usace.army.mil. AM 0001 updates the site visit information and adds FAR 52.219-4. AM 0002 extends the proposal due date.
Update #2 ·
Project Title: Temporary Wall Replacement at Denison Powerhouse, Denison, TX. The work in this contract includes the demolition and disposal of the existing temporary wall and support structure, demolition and disposal of the existing wood plank flooring and support structure at the Generator Room Level adjacent to the temporary wall structure, the demolition and disposal of miscellaneous elements such as railing and rebar, and the design and construction of a floor grating system on the Generator Room Level as well as a new structurally independent permanent wall and support structure on the north side of the powerhouse. Design and construct the permanent wall system in a manner that will require no structural modifications to the existing powerhouse structure. This is a full and open competitive solicitation for a Firm-Fixed Price (FFP) contract to be awarded under the best value continuum using the Lowest Price Technically Acceptable (LPTA) process in accordance with FAR 15.101-2. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within the proposed number of calendar days (Not to Exceed 730 days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the allowed time. Performance and Payment Bonds will be required. The Government POC for this solicitation is Cheyenne Redemann, Cheyenne.A.Redemann@usace.army.mil. AM 0001 updates the site visit information and adds FAR 52.219-4.
Update #1 ·
Project Title: Temporary Wall Replacement at Denison Powerhouse, Denison, TX. The work in this contract includes the demolition and disposal of the existing temporary wall and support structure, demolition and disposal of the existing wood plank flooring and support structure at the Generator Room Level adjacent to the temporary wall structure, the demolition and disposal of miscellaneous elements such as railing and rebar, and the design and construction of a floor grating system on the Generator Room Level as well as a new structurally independent permanent wall and support structure on the north side of the powerhouse. Design and construct the permanent wall system in a manner that will require no structural modifications to the existing powerhouse structure. This is a full and open competitive solicitation for a Firm-Fixed Price (FFP) contract to be awarded under the best value continuum using the Lowest Price Technically Acceptable (LPTA) process in accordance with FAR 15.101-2. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within the proposed number of calendar days (Not to Exceed 730 days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the allowed time. Performance and Payment Bonds will be required. The Government POC for this solicitation is Cheyenne Redemann, Cheyenne.A.Redemann@usace.army.mil.
Files
| File | Type | Posted |
|---|---|---|
| RFIs and Responses dtd 07 Nov 2024 W912BV24R0103.xlsx | XLSX spreadsheet | |
| Site Visit 28 Aug 2024 W912BV24R0103.pdf | ||
| Site Visit Sign in Sheet 29 July 2024 Denison Temp Wall Repair.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Temporary Wall Replacement at Denison Powerhouse, Denison, TX | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Tenkiller Hydropower Excitation System Replacement | ENDIST Tulsa | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity