Telemetry Integrated Processing System (ITIPS)

Award Notice Posted

Solicitation number
FA8224-14-R-0091
Agency
Awarded
to Smartronix Tds, LLC
Set-aside
No set-aside

Opportunity facts

Contract number
GS03F7012G-FA822414F0011 Federal contract award
PSC
Not on record
Place of performance
Delivery: Hill AFB, Utah 84056, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Added: Dec 30, 2013 3:33 pm The following Questions were asked and answered:

1. Par 5.1 (2) - Is the Telemetry content different for each of the 6 streams that have to be demodulated post-flight? Are the streams supplied as RF or IF signals? Do they have to be decommutated and displayed as in real-time?

A: The content could potentially be different on the 6 streams. The streams will be PCM. Yes, there will be a real-time display.


2. Par 5.2 (2c) - What is the aggregate bit rate of the 29 streams? Do they have different bit rates, and if so - what are the bit rates?


A: Aggregate shouldn't exceed 20 Mbps for all of the 29 streams combined. If in the future a mission flies the Vibration Measurement System (VMS), that would increase to 46 Mbps. The individual bit rates are 819.2 Kbps, 1.6 Mbps, and 500 Kbps. VMS runs at 3.2 Mbps.


3. Par 5.2 (5d) - What is meant by multiplexing 6 streams into a single file or more? Is the single file mandatory or an option, i.e. can the streams be recorded into 6 files?


A: The recorder has to ability to multiplex at least 6 incoming PCM data streams into a single file.



4. Par 5.2 (5e) - Do the 8 channels have the same IRIG time tag?


A: Yes.


5. Par 5.5 (3) - What is the relationship between 5 Mbps and 3.2 Mbps in Par
5.2 (2e)?


A: 3.2 Mbps is the requirement for the input to the best data engine.
5.0 Mbps is the requirement for the input to the processing server.


6. Par 5.5 (18) - What is the reason for 96GB of RAM? It is not clear why this extremely large RAM is needed for the bit-rates, number of telemetry parameters, data processing and display requirements defined in the specification.


A: Customer requirement.


7. Par 5.5 (22) - What is the reason for 1 TFLOP? It is not clear why this tremendous processing power is needed for the bit-rates, number of telemetry parameters, data processing and display requirements defined in the specification.


A: Customer requirement.

Update #3 ·

Added: Dec 17, 2013 12:03 pm This solicitaiton will be extended.

Update #2 ·

Added: Dec 11, 2013 12:54 pm A change has been made to the solicitaion by the addition of a new Purchase Specification. This new specification superceeds the old sepc. and will be the basese for technical evaluation.

Update #1 ·

Added: Nov 27, 2013 11:47 am The OO-ALC/PZIMC, Hill AFB Utah, intends to solicit, negotiate, and award a Fixed Firm Price contract for a Telemetry Integrated Processing System to the responsible quoter whose proposal conforms to the solicitation, which will be most advantageous to the government. The Government reserves the right to not make an award at all.

All payments are to be paid via the Internet through the Wide Area Work Flow (WAWF) system. WAWF may be accessed at https://wawf.eb.mil. WAWF training may be accessed online at http://www.wawftraining.com. Payment information may be accessed using DFAS website at https://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire the status of your payment.

Files

File Type Posted
RFP_FA8224-14-R-0091-0002_Modification_ITIPS.doc DOC document
RFP_FA8224-14-R-0091-0001_Modification_ITIPS.doc DOC document
ITIPS_System_Requirement__rev2.docx DOCX document
RFP_FA8224-14-R-0091_ITIPS.doc DOC document
ITIPS_System_Requirement__rev1.docx DOCX document

Notice history

Notice Type Posted
Telemetry Integrated Processing System (ITIPS) Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity