Tar Lake Superfund
Closed Solicitation Posted
- Solicitation number
- W911XK26BA030
- Agency
-
ENDIST Detroit
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 562910 Remediation Services
- Place of performance
- Mancelona Township, Michigan 49659
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Detroit District is awarding a Firm-Fixed Price environmental services contract for the Tar Lake Superfund remediation project in Mancelona Township, Michigan, with proposals received and opened on September 21. The procurement is total small business set-aside.
Place of performance is Mancelona Township, Michigan. The scope involves excavation of approximately 172,500 tons of contaminated soil, backfilling with clean imported soils, installing new biosparge wells, and construction of an approximately 160 square foot pre-engineered structure to house biosparge system compressors. Ancillary work includes abandoning and installing groundwater monitoring wells, installing erosion control measures, conducting utility surveys, confirmation soil sampling, and site restoration. NAICS code is 562910, Remediation Services; PSC code is F108, Environmental Systems Protection—Environmental Remediation.
Five offerors submitted bids: North Wind Remediation, LLC; Arrowhead Contracting, LLC; Taplin Enterprises, LLC; Engineering Remediation Resources Group, Inc.; and Cape Environmental Management, Inc. All submitted bid bonds at 20 percent or not-to-exceed three million dollars and are registered in SAM. Base bid totals ranged from nineteen million six hundred eighteen thousand five hundred eight dollars and eighty-two cents to twenty-seven million three hundred thirty-seven thousand seventy-four dollars. Option 1 for Area G work carried option bid totals ranging from thirty-seven thousand ninety-five dollars and eighty cents to two hundred thirty-five thousand two hundred nine dollars, bringing total prices with option to a range of nineteen million seven hundred sixteen thousand three hundred ninety-nine dollars and ninety-nine cents to twenty-seven million five hundred seventy-two thousand two hundred eighty-three dollars. Three amendments were issued prior to opening; the most recent (Amendment 0003) updated specifications and provided existing biosparge system design details in response to bidder inquiries.
Notice text
5 versions
Update #5 · Latest ·
*******Update Bid Abstract Posted 9/29/2026**************Amendment 0003******* Amendment 0003 is being issued to respond to bidder inquiries, provide existing Biosparge System Design Details, and update the Specifications in response to bidder inquiries received. All other terms and conditions remain UNCHANGED.********************Amendment 0002 ***** Amendment 0002 is being issued to respond to additional bidder inquiries, remove Davis-Bacon Construction Wage Determinations MI20260157 and MI20260158 and replace them with Davis-Bacon Construction Wage Determination MI20260043. All other terms and conditions remain UNCHANGED. ***********************Amendment 0001 ******Amendment 0001 is being issued to update the Specifications, Bid Schedule, and Scoping Statement in response to bidder inquiries received. CLIN 0007 is changed from Environmental Remediation Services to Construction. Amendment 0001 also updates the Wage Determinations found in Section L Instructions, Conditions, and Notices to Offerors or Quoters. All other terms and conditions remain UNCHANGED. ********************************************The U.S. Army Corps of Engineers (USACE) Detroit District is seeking a contractor for a Firm-Fixed Price (FFP) environmental services contract for the Tar Lake Superfund project located in Mancelona Township, Michigan. The project includes the excavation of contaminated soil and expansion of a bio-sparge system at the Tar Lake Superfund Site in Mancelona Township, Ml. The project will involve excavation of approximately 172,500 tons of contaminated soil, backfilling with clean imported soils, installing new biosparge wells, and an approximately 160 square foot pre-engineered structure to house the biosparge system compressors. Ancillary activities include abandoning existing groundwater monitoring wells, installing new groundwater monitoring wells, installing erosion control measures, conducting a utility survey to locate existing bio-sparge system piping, confirmation soil sampling,and site restoration.
Update #4 ·
******Amendment 0003******* Amendment 0003 is being issued to respond to bidder inquiries, provide existing Biosparge System Design Details, and update the Specifications in response to bidder inquiries received. All other terms and conditions remain UNCHANGED.********************Amendment 0002 ***** Amendment 0002 is being issued to respond to additional bidder inquiries, remove Davis-Bacon Construction Wage Determinations MI20260157 and MI20260158 and replace them with Davis-Bacon Construction Wage Determination MI20260043. All other terms and conditions remain UNCHANGED. ***********************Amendment 0001 ******Amendment 0001 is being issued to update the Specifications, Bid Schedule, and Scoping Statement in response to bidder inquiries received. CLIN 0007 is changed from Environmental Remediation Services to Construction. Amendment 0001 also updates the Wage Determinations found in Section L Instructions, Conditions, and Notices to Offerors or Quoters. All other terms and conditions remain UNCHANGED. ********************************************The U.S. Army Corps of Engineers (USACE) Detroit District is seeking a contractor for a Firm-Fixed Price (FFP) environmental services contract for the Tar Lake Superfund project located in Mancelona Township, Michigan. The project includes the excavation of contaminated soil and expansion of a bio-sparge system at the Tar Lake Superfund Site in Mancelona Township, Ml. The project will involve excavation of approximately 172,500 tons of contaminated soil, backfilling with clean imported soils, installing new biosparge wells, and an approximately 160 square foot pre-engineered structure to house the biosparge system compressors. Ancillary activities include abandoning existing groundwater monitoring wells, installing new groundwater monitoring wells, installing erosion control measures, conducting a utility survey to locate existing bio-sparge system piping, confirmation soil sampling,and site restoration.
Update #3 ·
*****Amendment 0002 ***** Amendment 0002 is being issued to respond to additional bidder inquiries, remove Davis-Bacon Construction Wage Determinations MI20260157 and MI20260158 and replace them with Davis-Bacon Construction Wage Determination MI20260043. All other terms and conditions remain UNCHANGED. ***********************Amendment 0001 ******Amendment 0001 is being issued to update the Specifications, Bid Schedule, and Scoping Statement in response to bidder inquiries received. CLIN 0007 is changed from Environmental Remediation Services to Construction. Amendment 0001 also updates the Wage Determinations found in Section L Instructions, Conditions, and Notices to Offerors or Quoters. All other terms and conditions remain UNCHANGED. ********************************************The U.S. Army Corps of Engineers (USACE) Detroit District is seeking a contractor for a Firm-Fixed Price (FFP) environmental services contract for the Tar Lake Superfund project located in Mancelona Township, Michigan. The project includes the excavation of contaminated soil and expansion of a bio-sparge system at the Tar Lake Superfund Site in Mancelona Township, Ml. The project will involve excavation of approximately 172,500 tons of contaminated soil, backfilling with clean imported soils, installing new biosparge wells, and an approximately 160 square foot pre-engineered structure to house the biosparge system compressors. Ancillary activities include abandoning existing groundwater monitoring wells, installing new groundwater monitoring wells, installing erosion control measures, conducting a utility survey to locate existing bio-sparge system piping, confirmation soil sampling,and site restoration.
Update #2 ·
*****Amendment 0001 ******Amendment 0001 is being issued to update the Specifications, Bid Schedule, and Scoping Statement in response to bidder inquiries received. CLIN 0007 is changed from Environmental Remediation Services to Construction. Amendment 0001 also updates the Wage Determinations found in Section L Instructions, Conditions, and Notices to Offerors or Quoters. All other terms and conditions remain UNCHANGED. ********************************************The U.S. Army Corps of Engineers (USACE) Detroit District is seeking a contractor for a Firm-Fixed Price (FFP) environmental services contract for the Tar Lake Superfund project located in Mancelona Township, Michigan. The project includes the excavation of contaminated soil and expansion of a bio-sparge system at the Tar Lake Superfund Site in Mancelona Township, Ml. The project will involve excavation of approximately 172,500 tons of contaminated soil, backfilling with clean imported soils, installing new biosparge wells, and an approximately 160 square foot pre-engineered structure to house the biosparge system compressors. Ancillary activities include abandoning existing groundwater monitoring wells, installing new groundwater monitoring wells, installing erosion control measures, conducting a utility survey to locate existing bio-sparge system piping, confirmation soil sampling,and site restoration.
Update #1 ·
The U.S. Army Corps of Engineers (USACE) Detroit District is seeking a contractor for a Firm-Fixed Price (FFP) environmental services contract for the Tar Lake Superfund project located in Mancelona Township, Michigan. The project includes the excavation of contaminated soil and expansion of a bio-sparge system at the Tar Lake Superfund Site in Mancelona Township, Ml. The project will involve excavation of approximately 172,500 tons of contaminated soil, backfilling with clean imported soils, installing new biosparge wells, and an approximately 160 square foot pre-engineered structure to house the biosparge system compressors. Ancillary activities include abandoning existing groundwater monitoring wells, installing new groundwater monitoring wells, installing erosion control measures, conducting a utility survey to locate existing bio-sparge system piping, confirmation soil sampling,and site restoration.
Files
| File | Type | Posted |
|---|---|---|
| Abstract (Final) Tar Lake Superfund.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Notice of Intent (NOI) to Sole Source and Request for Information (RFI) | Special Notice | |
| Tar Lake Superfund | Pre-Solicitation |