Tank Inspection - Martin State Airport, Maryland
Closed Solicitation Posted
- Solicitation number
- W9128F21R0058
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541990 All Other Professional, Scientific, and Technical Services
- Place of performance
- Middle River MD 21220 USA
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Perform an external AST inspection to include visual inspection of the containment area for Tank 3030.
The tank Inspection shall be in conformance with applicable industry standards API 653, NFPA 30, NFPA 326, UFGS 33 01 50.60, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local, service or host nation requirements. At a minimum, table 8-1 within UFC 3-460-01 shall be followed. All tank appurtenances that are required shall be documented along with all required appurtenances that aren’t present. Alarms, Automatic Tank Gauge equipment, and all tank appurtenances shall be tested and verified. The attached Inspection Report template should be utilized in submitting both the DRAFT and FINAL inspection reports. Contractor shall leave a clean and orderly site upon the completion of the inspection.
Update 15 March 2021: Question and Answer Addition to Attachmnet/Links tab.
Update #1 ·
Perform an external AST inspection to include visual inspection of the containment area for Tank 3030.
The tank Inspection shall be in conformance with applicable industry standards API 653, NFPA 30, NFPA 326, UFGS 33 01 50.60, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local, service or host nation requirements. At a minimum, table 8-1 within UFC 3-460-01 shall be followed. All tank appurtenances that are required shall be documented along with all required appurtenances that aren’t present. Alarms, Automatic Tank Gauge equipment, and all tank appurtenances shall be tested and verified. The attached Inspection Report template should be utilized in submitting both the DRAFT and FINAL inspection reports. Contractor shall leave a clean and orderly site upon the completion of the inspection.
Files
| File | Type | Posted |
|---|---|---|
| W9128F21F0058 16March2021.pdf | ||
| ATT D-Monthly Contractors Progress Management and Status Reports.xlsx | XLSX spreadsheet | |
| Soliciation W9128F21R0058 - Martin State Airport (MRT).pdf | ||
| ATT F - Previous Inspection Report-Martin State-Fac 3030.pdf | ||
| ATT C-Fuel Storage Excel Document.xlsx | XLSX spreadsheet | |
| ATT E (API In-Service Template).pdf | ||
| ATT B_MRT_Tank Info.xlsx | XLSX spreadsheet | |
| ATT A-General Installation Security Requirements.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity