Tall Chief Lift Station Repair Skiatook Lake OK
Cancelled Solicitation Posted
- Solicitation number
- W912BV24Q0089
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 562991 Septic Tank and Related Services
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Tulsa is seeking a contractor to remove and install a new lift station at the Tall Chief Lift Station in Skiatook Lake, Oklahoma. The scope of work includes the removal of the old tank and installation of a new tank, electrical components, and pumps. The contractor will be responsible for the mobilization of all necessary personnel, materials, services, equipment, and supplies to complete the project, which serves a 2-unit waterborne restroom with an estimated peak daily flow of 600 gallons per day. The contract will be awarded to a qualified small business, and the solicitation is due on September 6, 2024.
The project site is located approximately 1 mile from the sewage lagoon with a vertical lift of 60 feet. The contract will be awarded based on the contractor's ability to meet the technical specifications and complete the project to the desired standards. Interested small businesses are encouraged to submit their proposals by the due date.
Notice text
The Contractor shall be responsible for the mobilization of all personnel, materials, services, equipment and supplies necessary to complete the removal and installation of the Tall Chief lift station. Work includes removal of old tank and installation of a new tank, electrical components, and pumps. Contractor shall place new tank, electrical components and pumps to the specification provided. The general area shall be cleaned up by removing all materials from work site. After installation is completed, the area shall be finish graded to the desired contour to present a smooth appearance around the lift station. This lift station serves a 2-unit waterborne restroom each with a sink, toilet, and shower. Estimated peak daily flows are 600 gallons/day. The length of line from lift station to the sewage lagoon is approximately 1 mile and a vertical lift of 60 feet.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| LAKE25-101-CC lift station pump repair | Pacific West Region | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity