Swan Lake Trail Boardwalk Replacement
Awarded Award Notice Posted
- Solicitation number
- AG-05G1-S-17-0017
- Agency
- Region 6 - Pacific Northwest Region Forest Service, Department of Agriculture
- Awarded
- to Maris Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG05G1P170023 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Ferry County, Washington State, Republic Ranger District Republic, Washington 99166, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Added: May 02, 2017 9:11 pm
This amendment is to provide notice of site conditions to the Contractors for the Swan Lake Pre-proposal tour.
A Pre-Proposal Site visit will be conducted on May 4, 2017. The tour will start at 9 a.m. at the REPUBLIC RANGER STATION at 650 East Delaware Ave in Republic WA.
Please RSVP to Cathy VanAlyne at cvanalyne@fs.fe.us with your intent to attend and the pre-proposal tour prior to May 3, 207 at 3:00 p.m. If you have any questions, please provide them to Cathy so your question may be answered during the tour.
Conditions:
Forest Service Road 5300 Scatter Cr Road is currently impassable due to spring storms.
Access for the pre-proposal site visit is planned from State Highway 20 West of Republic to County Road 217 to County Road 212 to Forest Service Road 5330 to Forest Service Road 5300 which ends at the Swan Lake Campground. Four-wheel drive is recommended for pre-proposal tour due to the wet road conditions.
The lower portion of Scatter Cr Road is scheduled to be reopened by June 30, 2017. When it reopens it will provide paved access to campground with a few short segments of gravel surfacing.
The pre-proposal tour will involve hiking approximately 2 miles to see both structure locations, crossing a log over water at MP 0.96 site, and walking through shallow water on trail.
Update #2 ·
Added: Mar 20, 2017 7:42 pm
Modified: Apr 24, 2017 9:35 pmTrack Changes
Swan Lake Trail Boardwalk Replacement, Republic Ranger District, Ferry County, Washington State.
The Colville National Forest located in North Eastern Washington State has a requirement for removing and replacing wood trail boardwalks at 2 wet areas located at MP 0.73 and MP0.96 on FS Kettle Crest Trail #14 which begins at Swan Lake Campground.
The Contractor shall mobilize all necessary contractor equipment and materials to the project site to remove the treated timbers and fasteners of one puncheon structure and supply and install two new structures.
Work includes removing 1 existing 70-ft trail puncheon, installing 1 new 70-ft trail puncheon structure, and installing 1 new 70-ft helical pile boardwalk structure. The improvements at the MP0.73 site consist of, but are not limited to, installation of helical piles, yellow cedar pile caps, longitudinal members, decking, curbs, and constructing trail approaches. The improvements at the MP0.96 site consist of but are not limited to demolishing and scattering of disassembled non-treated wood trail puncheon materials on site, removal and disposal of all existing treated timber and fasteners offsite, installation of yellow cedar sills, longitudinal members, decking, curbs, and constructing trail approaches.
The trail sites may be accessed via boat or the Swan Lake Trail #14. Boat access is permitted for transport of materials and supplies but subject to loon timing window of to be determined. Mechanized equipment up to 48-inches wide is permitted on the 18-inch wide trail as long as trail is restored to preexisting conditions upon completion of project
Work in and around MP0.73 Site below ordinary high water mark shall meet the requirements of the Memorandum of Understanding between the Forest Service and the WA State Dept. of Fish and Wildlife included in the contract. The in-stream work window is July 1 to September 30.
The Contractor shall furnish all management, labor equipment, supervision, tools, materials, transportation, operating supplies, supervision, workman's compensation, unemployment insurance and incidentals necessary to perform the work in accordance with the drawing and specifications of the contract.
To get to site, reference the site maps located in the solicitation.
The work is estimated to start approximately around July 5, 2017 and the work must be completed by September 30, 2017. No transport of materials via boat or trail will be permitted over weekends from 12 pm Friday to 6 pm Sunday (6 pm Monday on Labor Day).
The project is estimated between $25,000 and $100,000. The awarded Contractor will have to provide a payment bond.
This procurement requires the use of biobased products to the extent that such products are reasonably available, meet agency or relevant industry performance standards, and are reasonably prices. Where available, these products would first be acquired from among qualified products that fall under the umbrella of items designated through the Federal Biobased Products Preferred Procurement Program (FB4P).
This project will be advertised as a written request for quotes. The Simplified Acquisition Procedures will be used. Award will be a fixed price construction contract.
Estimated issue date of the solicitation is estimated to be April 24th . The actual due date of proposals will be listed in the solicitation. The solicitation will be posted on this site.
An optional Pre-Bid Tour is currently scheduled for May 4, 2017. The tour will start at the Repubic Ranger Station at 650 East Delaware Aveune in Republic, WA.
This acquisition is 100% set-aside for small business concerns. NAICS code is 237990, size standard is $36.5 million.
All responsible sources may submit a quote which will be considered. An electronic copy of the solicitation will be posted at this site on the issue date.
Update #1 ·
Added: Mar 20, 2017 7:42 pm
Swan Lake Trail Boardwalk Replacement, Republic Ranger District, Ferry County, Washington State.
The Colville National Forest located in North Eastern Washington State has a requirement for removing and replacing wood trail boardwalks at 2 wet areas located at MP 0.73 and MP0.96 on FS Kettle Crest Trail #14 which begins at Swan Lake Campground.
The Contractor shall mobilize all necessary contractor equipment and materials to the project site to remove the treated timbers and fasteners of one puncheon structure and supply and install two new structures.
Work includes removing 1 existing 70-ft trail puncheon, installing 1 new 70-ft trail puncheon structure, and installing 1 new 70-ft helical pile boardwalk structure. The improvements at the MP0.73 site consist of, but are not limited to, installation of helical piles, yellow cedar pile caps, longitudinal members, decking, curbs, and constructing trail approaches. The improvements at the MP0.96 site consist of but are not limited to demolishing and scattering of disassembled non-treated wood trail puncheon materials on site, removal and disposal of all existing treated timber and fasteners offsite, installation of yellow cedar sills, longitudinal members, decking, curbs, and constructing trail approaches.
The trail sites may be accessed via boat or the Swan Lake Trail #14. Boat access is permitted for transport of materials and supplies but subject to loon timing window of to be determined. Mechanized equipment up to 48-inches wide is permitted on the 18-inch wide trail as long as trail is restored to preexisting conditions upon completion of project
Work in and around MP0.73 Site below ordinary high water mark shall meet the requirements of the Memorandum of Understanding between the Forest Service and the WA State Dept. of Fish and Wildlife included in the contract. The in-stream work window is July 1 to September 30.
The Contractor shall furnish all management, labor equipment, supervision, tools, materials, transportation, operating supplies, supervision, workman's compensation, unemployment insurance and incidentals necessary to perform the work in accordance with the drawing and specifications of the contract.
To get to site, reference the site maps located in the solicitation.
The work is estimated to start approximately around July 5, 2017 and the work must be completed by September 30, 2017. No transport of materials via boat or trail will be permitted over weekends from 12 pm Friday to 6 pm Sunday (6 pm Monday on Labor Day).
The project is estimated between $25,000 and $100,000. The awarded Contractor will have to provide a payment bond.
This procurement requires the use of biobased products to the extent that such products are reasonably available, meet agency or relevant industry performance standards, and are reasonably prices. Where available, these products would first be acquired from among qualified products that fall under the umbrella of items designated through the Federal Biobased Products Preferred Procurement Program (FB4P).
This project will be advertised as a written request for quotes. The Simplified Acquisition Procedures will be used. Award will be a fixed price construction contract.
Estimated issue date of the solicitation is estimated to be the week of April 10th or 17th . The actual due date of proposals will be listed in the solicitation. The solicitation will be posted on this site.
An optional Pre-Bid Tour is currently scheduled for May 4, 2017 at the Swan Lake Campground to visit the sites and access options. The actual date of the pre-bid tour will be in the solicitation.
This acquisition is 100% set-aside for small business concerns. NAICS code is 237990, size standard is $36.5 million.
All responsible sources may submit a quote which will be considered. An electronic copy of the solicitation will be posted at this site on the issue date.
Attachments
Notice history
| Notice | Type | Posted |
|---|---|---|
| Swan Lake Trail Boardwalk | Award Notice | |
| Swan Lake Trail Boardwalk Replacement | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity