Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY).
Cancelled Solicitation Posted
- Solicitation number
- W912EQ26RA001
- Agency
-
ENDIST Memphis
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- 2915 Riverport Rd, Memphis TN 38109 38109
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Memphis is seeking construction services for the Stringout Replacement at Ensley Engineer Yard (EEY), a comprehensive rehabilitation project involving the removal and replacement of marine infrastructure including ramps, piles, docks, and utilities. The contract requires the contractor to furnish all labor, materials, tools, and equipment necessary to complete work encompassing demolition of existing structures, dredging and excavation, installation of new steel floats and landing barges, construction of a connector bridge and electrical substation, and installation of new utilities systems. The project is structured as a base contract with six optional components, with Phase 1 of the base work requiring completion before Phase 2 can commence to allow continued yard operations. The government will conduct an unrestricted procurement using a Best Value Tradeoff source selection process with a HUBZone Price Evaluation Preference, and a Project Labor Agreement (PLA) is mandatory. The proposal submission deadline was April 21, 2026.
This solicitation carries no set-aside designations and represents an unrestricted competitive opportunity. The estimated contract value ranges between $25,000,000 and $100,000,000, indicating a substantial heavy civil engineering construction project. The work will be performed at 2915 Riverport Road, Memphis, Tennessee 38109, and is classified under NAICS code 237990 (Other Heavy and Civil Engineering Construction) and PSC code Y1PZ (Construction of Other Non-Building Facilities). The solicitation was posted on January 30, 2026, with the proposal due date of April 21, 2026 having already passed, indicating this opportunity is no longer accepting new submissions. No incumbent contractor or specific timeline for completion was identified in the solicitation notice.
Notice text
2 versions
Update #2 · Latest ·
Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY) The work consists of furnishing all labor, materials, tools, and equipment to complete the work as shown and as specified for the Stringout Replacement at EEY, and incidental related work. The project is divided into a base project and six (6) options. The work involves: Removal of the existing steel ramp that extends from the yard to the floating docks; Demolition and removal of existing ramp abutment; Removal of existing timber piles, steel pipe piles, and concrete piles; Demolition and removal of concrete piles and pile caps from existing railroad trestle; Excavation, dredging and disposal of materials; Installation of steel floats (GFE); Installation of a new landing barge; Providing new steel pipe piles and steel-framed pile clusters; Providing donut fenders; Providing new utilities (electrical power, lighting, lightning protection, potable water, fire water, telecom, compressed air); Construction of a new steel connector bridge; Construction of an electrical substation, including equipment foundation; Construction of abutment and landside approach to the connector bridge; All earthwork activities for connector bridge; and all incidental related work. The base project work shall be completed sequentially from Phase 1 to Phase 2, to allow continued operation of the Ensley Engineer Yard. Phase 1 shall be completed before the start of Phase 2.For options when awarded, they they shall be completed in the sequence directed by the Government. Acquisition Strategy: The acquisition will be conducted as an unrestricted procurement with a HUBZone Price Evaluation Preference, using a Best Value Tradeoff source selection process. Magnitude of Construction: Between $25,000,000 and $100,000,000.
Update #1 ·
Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY) The work consists of furnishing all labor, materials, tools, and equipment to complete the work as shown and as specified for the Stringout Replacement at EEY, and incidental related work. The project is divided into a base project and six (6) options. The work involves: Removal of the existing steel ramp that extends from the yard to the floating docks; Demolition and removal of existing ramp abutment; Removal of existing timber piles, steel pipe piles, and concrete piles; Demolition and removal of concrete piles and pile caps from existing railroad trestle; Excavation, dredging and disposal of materials; Installation of steel floats (GFE); Installation of a new landing barge; Providing new steel pipe piles and steel-framed pile clusters; Providing donut fenders; Providing new utilities (electrical power, lighting, lightning protection, potable water, fire water, telecom, compressed air); Construction of a new steel connector bridge; Construction of an electrical substation, including equipment foundation; Construction of abutment and landside approach to the connector bridge; All earthwork activities for connector bridge; and all incidental related work. The base project work shall be completed sequentially from Phase 1 to Phase 2, to allow continued operation of the Ensley Engineer Yard. Phase 1 shall be completed before the start of Phase 2.For options when awarded, they they shall be completed in the sequence directed by the Government. Acquisition Strategy: The acquisition will be conducted as an unrestricted procurement with a HUBZone Price Evaluation Preference, using a Best Value Tradeoff source selection process. A Project Labor Agreement (PLA) will be required.Magnitude of Construction: Between $25,000,000 and $100,000,000.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY). | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Bayou Meto Canal 1000 Phase 4. 2 | ENDIST Memphis | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity