Stegall Substation Stage 07 Phase 01
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 89503226BWA000075
- Agency
- Western Area Power Administration Department of Energy
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237130 Power and Communication Line and Related Structures Construction
- Points of contact
-
- John W. Pratt jpratt@wapa.gov (720) 962-7166
- More information
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Energy Western Area Power Administration seeks equipment replacements and upgrades at the Stegall Substation as part of Stage 07 Phase 01, with proposals due August 28. The procurement is a Total Small Business set-aside, restricting competition to firms meeting SBA size standards for NAICS 237130.
The project scope includes replacement of a 1960s-era control building, 30+ disconnect switches, brown glass insulators, main bus reconductor with rating increase, two 115kV oil circuit breakers, and a 1990s vintage GE D20 RTU (replaced by three SEL RTACs), plus installation of a transfer bus dead end structure between 230kV east and west interconnect points. The NAICS code is 237130, Power and Communication Line and Related Structures Construction, with PSC Y1PZ (Construction Of Other Non-Building Facilities). Place of performance is the Stegall Substation. Amendment 0001 posted industry Q&A and extended the bid closing date. Amendment 0002 updated drawings with redline markings, extended the bid closing date again, and changed the bid opening date.
Notice text
3 versions
Update #3 · Latest ·
Amendment (0002) is to update Drawings with redline markings, extend bid closing date, and change the bid opening date as part of the Stegall Substation Stage 07 Phase 01 Project.
Update #2 ·
Amendment (0001) is to post Q/A from industry and extend bid closing date as part of the Stegall Substation Stage 07 Phase 01 Project.
Update #1 ·
The Stegall Substation Stage 07 Phase 01 Project (Equipment Replacements and Upgrades) replaces end of life equipment and installs a new control building. Replaced equipment shall include the 1960’s era control building, 30+ disconnect switches, problematic brown glass insulators, main bus reconductor and rating increase, 2-115kV oil circuit breakers, replace 1990’s vintage GE D20 RTU with three SEL RTACs, and add transfer bus dead end structure between 230kV east and west interconnect.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Stegall Substation Stage 07 Phase 01 | Award Notice | |
| Stegall Substation Stage 07 Phase 01 | Solicitation | |
| Stegall Substation Stage 07 | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity