Pioneer Campground Stage Removal and Reconstruction (GAOA)
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 1240LT23Q0142
- Agency
- Forest Service Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Fairfield, Idaho 83327, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Forest Service is soliciting proposals to remove an existing concrete stage and construct a new stage and ramp at the Pioneer Campground in Camas County, Idaho. The solicitation seeks a contractor to demolish the current stage, excavate the site, pour a new colored concrete stage and ramp, install stone veneer and contraction joints. Proposals are due by October 31, 2023 and will be evaluated based on price, experience, past performance, and technical approach. Questions regarding the solicitation are due by October 19, 2023.
The contract is set aside for total small businesses and has an estimated value between $25,000 to $100,000. The work must be completed between May 1, 2024 and June 30, 2024 at the Pioneer Campground located in the Fairfield Ranger District of the Sawtooth National Forest in Camas County, Idaho. Evaluation will consider price reasonableness and the offeror's ability to successfully complete the project based on their experience, past performance references, and technical approach to performing the scope of work.
Notice text
5 versions
Update #5 · Latest ·
Purpose of this Amendment is to:
1.Cchange the due date of quotes from October 31, 2023 @ noon MT to November 15, 2023 @ 1630 MT. Please now email quotes to tanya.spanfellner@usda.gov
2. Add as attachments, Q&A and and a new schedule of items.
This is a Request for Proposal (RFP). The government intends to award one purchase order to the winning bidder using the trade off process. The contractor shall quote all line items. The government reserves the right to award each line item individually, or at all, if that represents the best value to the government. The contractor shall provide all materials, labor, equipment, tools, transportation, supervision, expertise, and other incidentals necessary, except as otherwise provided, to successfully complete the below referenced project.
Project Title: Pioneer Campground Stage Removal and Reconstruction (GAOA)
This project entails the replacement of the existing concrete stage at Pioneer Campground with a brand-new stage and accompanying ramp. The scope of work encompasses the demolition of the current stage, the construction of the new stage and ramp, and the responsible removal of the old stage to an approved disposal facility. Additionally, the project includes measures for erosion control, excavation, the pouring of colored cast-in-place concrete, placement of select backfill, installation of a masonry veneer, incorporation of contraction joints, and all associated tasks.
Project Location: The project site is situated within the Fairfield Ranger District of the Sawtooth National Forest, Camas County, Idaho, specifically in Section 19, T2N, R14E. Its approximate distance is 11 miles north of Fairfield, ID, and can be accessed via State Highway 20 and Soldier Creek Road.
Set Aside: Total Small Business Set-Aside (FAR 19.5).
Magnitude: (b) Between $25,000 and $100,000.
Period of Performance: May 1st, 2024 to June 30th, 2024.
Contract Time: 60 Calendar Days
Site Visit: Self-Paced/No planned Government Escorted Visit
Questions Due No Later Than: October 19, 2023 at 12:00 PM MDT. E-mail your questions tanya.spanfellner@usda.gov using the “Contractor Questions and Answers Template” attached to this e-mail.
RFP Close Date/Proposal Deadline: October 31, 2023 at 12:00 PM MDT. E-mail your bid documents to tanya.spanfellner@usda.gov.
E-mail Subject Line: 1240LT23Q0142 Proposal Submission by "Your Business Name Here".
Additional Information:
In accordance with the Procurement Integrity Act (41 USC § 423); (41 U.S.C. § 21) and the Federal Acquisition Regulation (FAR) 3.104, potential contractors are strictly prohibited from making direct contact with Federal Government program managers, engineers, or any other personnel seeking products or services other than the contracting officer or contracting specialist responsible for that contract opportunity.
Individuals who violate the procurement integrity provisions may be subject to criminal and civil penalties, and administrative remedies. The penalties are discussed under 41 U.S.C. Chapter 21 (4) and FAR 3.104-8. It is essential for all potential contractors to be fully aware of and compliant with these regulations.
Contracting officers and contracting specialists, who announce contract opportunities on SAM.gov, act as the liaisons between the Federal Government and potential contractors. As such, all inquiries, questions, or concerns from interested contractors should be sent exclusively to the contracting officer or contracting specialist who posted the contract opportunity announcement.
Upon receipt, the contracting officer or contracting specialist will relay these to the relevant program managers or engineers for feedback. After accumulating all necessary information to address these inquiries, the contracting officer or contracting specialist will then update the related contract opportunity announcement and ensure its public accessibility on SAM.gov to uphold transparency and the integrity of the procurement process.
Private firms must be able to compete for the government’s business on a scrupulously fair basis. Fairness is a pre-requisite of government acquisition due to the government’s unique position as representatives of the citizens of the United States. Government personnel who are associated with the acquisition process have a responsibility to protect its integrity by maintaining fairness in the government’s treatment of all firms. Thank you for your cooperation, and adherence to these laws, and regulations.
Update #4 ·
This is a Request for Proposal (RFP). The government intends to award one purchase order to the winning bidder using the trade off process. The contractor shall quote all line items. The government reserves the right to award each line item individually, or at all, if that represents the best value to the government. The contractor shall provide all materials, labor, equipment, tools, transportation, supervision, expertise, and other incidentals necessary, except as otherwise provided, to successfully complete the below referenced project.
Project Title: Pioneer Campground Stage Removal and Reconstruction (GAOA)
This project entails the replacement of the existing concrete stage at Pioneer Campground with a brand-new stage and accompanying ramp. The scope of work encompasses the demolition of the current stage, the construction of the new stage and ramp, and the responsible removal of the old stage to an approved disposal facility. Additionally, the project includes measures for erosion control, excavation, the pouring of colored cast-in-place concrete, placement of select backfill, installation of a masonry veneer, incorporation of contraction joints, and all associated tasks.
Project Location: The project site is situated within the Fairfield Ranger District of the Sawtooth National Forest, Camas County, Idaho, specifically in Section 19, T2N, R14E. Its approximate distance is 11 miles north of Fairfield, ID, and can be accessed via State Highway 20 and Soldier Creek Road.
Set Aside: Total Small Business Set-Aside (FAR 19.5).
Magnitude: (b) Between $25,000 and $100,000.
Period of Performance: May 1st, 2024 to June 30th, 2024.
Contract Time: 60 Calendar Days
Site Visit: Self-Paced/No planned Government Escorted Visit
Questions Due No Later Than: October 19, 2023 at 12:00 PM MDT. E-mail your questions tanya.spanfellner@usda.gov using the “Contractor Questions and Answers Template” attached to this e-mail.
RFP Close Date/Proposal Deadline: October 31, 2023 at 12:00 PM MDT. E-mail your bid documents to tanya.spanfellner@usda.gov.
E-mail Subject Line: 1240LT23Q0142 Proposal Submission by "Your Business Name Here".
Additional Information:
In accordance with the Procurement Integrity Act (41 USC § 423); (41 U.S.C. § 21) and the Federal Acquisition Regulation (FAR) 3.104, potential contractors are strictly prohibited from making direct contact with Federal Government program managers, engineers, or any other personnel seeking products or services other than the contracting officer or contracting specialist responsible for that contract opportunity.
Individuals who violate the procurement integrity provisions may be subject to criminal and civil penalties, and administrative remedies. The penalties are discussed under 41 U.S.C. Chapter 21 (4) and FAR 3.104-8. It is essential for all potential contractors to be fully aware of and compliant with these regulations.
Contracting officers and contracting specialists, who announce contract opportunities on SAM.gov, act as the liaisons between the Federal Government and potential contractors. As such, all inquiries, questions, or concerns from interested contractors should be sent exclusively to the contracting officer or contracting specialist who posted the contract opportunity announcement.
Upon receipt, the contracting officer or contracting specialist will relay these to the relevant program managers or engineers for feedback. After accumulating all necessary information to address these inquiries, the contracting officer or contracting specialist will then update the related contract opportunity announcement and ensure its public accessibility on SAM.gov to uphold transparency and the integrity of the procurement process.
Private firms must be able to compete for the government’s business on a scrupulously fair basis. Fairness is a pre-requisite of government acquisition due to the government’s unique position as representatives of the citizens of the United States. Government personnel who are associated with the acquisition process have a responsibility to protect its integrity by maintaining fairness in the government’s treatment of all firms. Thank you for your cooperation, and adherence to these laws, and regulations.
Update #3 ·
This is a Request for Proposal (RFP). The government intends to award one purchase order to the winning bidder using the trade off process. The contractor shall quote all line items. The government reserves the right to award each line item individually, or at all, if that represents the best value to the government. The contractor shall provide all materials, labor, equipment, tools, transportation, supervision, expertise, and other incidentals necessary, except as otherwise provided, to successfully complete the below referenced project.
Project Title: Pioneer Campground Stage Removal and Reconstruction (GAOA)
This project entails the replacement of the existing concrete stage at Pioneer Campground with a brand-new stage and accompanying ramp. The scope of work encompasses the demolition of the current stage, the construction of the new stage and ramp, and the responsible removal of the old stage to an approved disposal facility. Additionally, the project includes measures for erosion control, excavation, the pouring of colored cast-in-place concrete, placement of select backfill, installation of a masonry veneer, incorporation of contraction joints, and all associated tasks.
Project Location: The project site is situated within the Fairfield Ranger District of the Sawtooth National Forest, Camas County, Idaho, specifically in Section 19, T2N, R14E. Its approximate distance is 11 miles north of Fairfield, ID, and can be accessed via State Highway 20 and Soldier Creek Road.
Set Aside: Total Small Business Set-Aside (FAR 19.5).
Magnitude: (b) Between $25,000 and $100,000.
Period of Performance: May 1st, 2024 to June 30th, 2024.
Contract Time: 60 Calendar Days
Site Visit: Self-Paced/No planned Government Escorted Visit
Questions Due No Later Than: October 19, 2023 at 12:00 PM MDT. E-mail your questions elizabeth.ratcliff@usda.gov using the “Contractor Questions and Answers Template” attached to this e-mail.
RFP Close Date/Proposal Deadline: October 31, 2023 at 12:00 PM MDT. E-mail your bid documents to elizabeth.ratcliff@usda.gov.
E-mail Subject Line: 1240LT23Q0142 Proposal Submission by "Your Business Name Here".
Additional Information:
In accordance with the Procurement Integrity Act (41 USC § 423); (41 U.S.C. § 21) and the Federal Acquisition Regulation (FAR) 3.104, potential contractors are strictly prohibited from making direct contact with Federal Government program managers, engineers, or any other personnel seeking products or services other than the contracting officer or contracting specialist responsible for that contract opportunity.
Individuals who violate the procurement integrity provisions may be subject to criminal and civil penalties, and administrative remedies. The penalties are discussed under 41 U.S.C. Chapter 21 (4) and FAR 3.104-8. It is essential for all potential contractors to be fully aware of and compliant with these regulations.
Contracting officers and contracting specialists, who announce contract opportunities on SAM.gov, act as the liaisons between the Federal Government and potential contractors. As such, all inquiries, questions, or concerns from interested contractors should be sent exclusively to the contracting officer or contracting specialist who posted the contract opportunity announcement.
Upon receipt, the contracting officer or contracting specialist will relay these to the relevant program managers or engineers for feedback. After accumulating all necessary information to address these inquiries, the contracting officer or contracting specialist will then update the related contract opportunity announcement and ensure its public accessibility on SAM.gov to uphold transparency and the integrity of the procurement process.
Private firms must be able to compete for the government’s business on a scrupulously fair basis. Fairness is a pre-requisite of government acquisition due to the government’s unique position as representatives of the citizens of the United States. Government personnel who are associated with the acquisition process have a responsibility to protect its integrity by maintaining fairness in the government’s treatment of all firms. Thank you for your cooperation, and adherence to these laws, and regulations.
Update #2 ·
This is a Request for Quote (RFQ). The government intends to award one purchase order to the winning bidder using the trade off process. The contractor shall quote all line items. The government reserves the right to award each line item individually, or at all, if that represents the best value to the government. The contractor shall provide all materials, labor, equipment, tools, transportation, supervision, expertise, and other incidentals necessary, except as otherwise provided, to successfully complete the below referenced project.
Project Title: Pioneer Campground Stage Removal and Reconstruction (GAOA)
This project entails the replacement of the existing concrete stage at Pioneer Campground with a brand-new stage and accompanying ramp. The scope of work encompasses the demolition of the current stage, the construction of the new stage and ramp, and the responsible removal of the old stage to an approved disposal facility. Additionally, the project includes measures for erosion control, excavation, the pouring of colored cast-in-place concrete, placement of select backfill, installation of a masonry veneer, incorporation of contraction joints, and all associated tasks.
Project Location: The project site is situated within the Fairfield Ranger District of the Sawtooth National Forest, Camas County, Idaho, specifically in Section 19, T2N, R14E. Its approximate distance is 11 miles north of Fairfield, ID, and can be accessed via State Highway 20 and Soldier Creek Road.
Set Aside: Total Small Business Set-Aside (FAR 19.5).
Magnitude: (b) Between $25,000 and $100,000.
Period of Performance: May 1st, 2024 to June 30th, 2024.
Contract Time: 60 Calendar Days
Site Visit: Self-Paced/No planned Government Escorted Visit
Questions Due No Later Than: October 19, 2023 at 12:00 PM MDT. E-mail your questions elizabeth.ratcliff@usda.gov using the “Contractor Questions and Answers Template” attached to this e-mail.
RFP Close Date/Proposal Deadline: October 31, 2023 at 12:00 PM MDT. E-mail your bid documents to elizabeth.ratcliff@usda.gov.
E-mail Subject Line: 1240LT23Q0142 Quote Submission by "Your Business Name Here".
Additional Information:
In accordance with the Procurement Integrity Act (41 USC § 423); (41 U.S.C. § 21) and the Federal Acquisition Regulation (FAR) 3.104, potential contractors are strictly prohibited from making direct contact with Federal Government program managers, engineers, or any other personnel seeking products or services other than the contracting officer or contracting specialist responsible for that contract opportunity.
Individuals who violate the procurement integrity provisions may be subject to criminal and civil penalties, and administrative remedies. The penalties are discussed under 41 U.S.C. Chapter 21 (4) and FAR 3.104-8. It is essential for all potential contractors to be fully aware of and compliant with these regulations.
Contracting officers and contracting specialists, who announce contract opportunities on SAM.gov, act as the liaisons between the Federal Government and potential contractors. As such, all inquiries, questions, or concerns from interested contractors should be sent exclusively to the contracting officer or contracting specialist who posted the contract opportunity announcement.
Upon receipt, the contracting officer or contracting specialist will relay these to the relevant program managers or engineers for feedback. After accumulating all necessary information to address these inquiries, the contracting officer or contracting specialist will then update the related contract opportunity announcement and ensure its public accessibility on SAM.gov to uphold transparency and the integrity of the procurement process.
Private firms must be able to compete for the government’s business on a scrupulously fair basis. Fairness is a pre-requisite of government acquisition due to the government’s unique position as representatives of the citizens of the United States. Government personnel who are associated with the acquisition process have a responsibility to protect its integrity by maintaining fairness in the government’s treatment of all firms. Thank you for your cooperation, and adherence to these laws, and regulations.
Update #1 ·
This is a Request for Quote (RFQ). The government intends to award one purchase order to the winning bidder using the trade off process. The contractor shall quote all line items. The government reserves the right to award each line item individually, or at all, if that represents the best value to the government. The contractor shall provide all materials, labor, equipment, tools, transportation, supervision, expertise, and other incidentals necessary, except as otherwise provided, to successfully complete the below referenced project.
Project Title: Pioneer Campground Stage Removal and Reconstruction (GAOA)
This project entails the replacement of the existing concrete stage at Pioneer Campground with a brand-new stage and accompanying ramp. The scope of work encompasses the demolition of the current stage, the construction of the new stage and ramp, and the responsible removal of the old stage to an approved disposal facility. Additionally, the project includes measures for erosion control, excavation, the pouring of colored cast-in-place concrete, placement of select backfill, installation of a masonry veneer, incorporation of contraction joints, and all associated tasks.
Project Location: The project site is situated within the Fairfield Ranger District of the Sawtooth National Forest, Camas County, Idaho, specifically in Section 19, T2N, R14E. Its approximate distance is 11 miles north of Fairfield, ID, and can be accessed via State Highway 20 and Soldier Creek Road.
Set Aside: Total Small Business Set-Aside (FAR 19.5).
Magnitude: (b) Between $25,000 and $100,000.
Period of Performance: May 1st, 2024 to June 30th, 2024.
Contract Time: 60 Calendar Days
Site Visit: Self-Paced/No planned Government Escorted Visit
Questions Due No Later Than: October 19, 2023 at 12:00 PM MDT. E-mail your questions elizabeth.ratcliff@usda.gov using the “Contractor Questions and Answers Template” attached to this e-mail.
RFP Close Date/Proposal Deadline: October 31, 2023 at 12:00 PM MDT. E-mail your bid documents to elizabeth.ratcliff@usda.gov.
E-mail Subject Line: 1240LT23Q0142 Quote Submission by "Your Business Name Here".
Addititonal Information:
In accordance with the Procurement Integrity Act (41 USC § 423); (41 U.S.C. § 21) and the Federal Acquisition Regulation (FAR) 3.104, potential contractors are strictly prohibited from making direct contact with Federal Government program managers, engineers, or any other personnel seeking products or services other than the contracting officer or contracting specialist responsible for that contract opportunity.
Individuals who violate the procurement integrity provisions may be subject to criminal and civil penalties, and administrative remedies. The penalties are discussed under 41 U.S.C. Chapter 21 (4) and FAR 3.104-8. It is essential for all potential contractors to be fully aware of and compliant with these regulations.
Contracting officers and contracting specialists, who announce contract opportunities on SAM.gov, act as the liaisons between the Federal Government and potential contractors. As such, all inquiries, questions, or concerns from interested contractors should be sent exclusively to the contracting officer or contracting specialist who posted the contract opportunity announcement.
Upon receipt, the contracting officer or contracting specialist will relay these to the relevant program managers or engineers for feedback. After accumulating all necessary information to address these inquiries, the contracting officer or contracting specialist will then update the related contract opportunity announcement and ensure its public accessibility on SAM.gov to uphold transparency and the integrity of the procurement process.
Private firms must be able to compete for the government’s business on a scrupulously fair basis. Fairness is a pre-requisite of government acquisition due to the government’s unique position as representatives of the citizens of the United States. Government personnel who are associated with the acquisition process have a responsibility to protect its integrity by maintaining fairness in the government’s treatment of all firms. Thank you for your cooperation, and adherence to these laws, and regulations.
Attachments
| File | Type | Posted |
|---|---|---|
| Contractor Questions and Answers - Pioneer Campground (002).doc | DOC document | |
| SOI Pioneer Stage 10_25_2023.xlsx | XLSX spreadsheet | |
| 1240LT23Q0142.pdf | ||
| RFQ 1240LT23Q0142.pdf | ||
| J.1 SOW - Pioneer Campground Stage Removal and Reconstruction (GAOA).pdf | ||
| J.pdf | ||
| RFQ 1442 1240LT23Q0142.pdf | ||
| J-3 - Wage Determination No. ID20220043 - Camas County Idaho.pdf | ||
| J-2 - Drawings - Pioneer Campground Stage Removal and Reconstruction (GAOA).pdf | ||
| J.4 Contractor Experience Questionaire.docx | DOCX document | |
| Contractor Questions and Answers Template.doc | DOC document |
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| Pioneer Campground Stage Removal and Reconstruction (GAOA) | Award Notice | |
| Pioneer Campground Stage Removal and Reconstruction (GAOA) | Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity