Spillway Gate Painting and Repair
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9127823R0109
- Agency
-
ENDIST Mobile
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation from the U.S. Army Corps of Engineers, Mobile District, seeks a construction contractor to repair and re-paint six spillway gates at West Point Lake. The contractor must provide all labor, materials and equipment to perform weld repairs, power wash, and prime and paint the gates, hoists and associated equipment with a three-coat vinyl paint system. The contractor must also set stoplogs to dewater each gate one at a time for the work. Experience with similar projects is required. Proposals are due by February 7, 2024.
There is no set-aside designation. The work includes removing and disposing of lead-based paint and performing minor structural repairs while the gates are dewatered. Weld repairs must follow AWS D1.1 standards. The gates will remain in place for the work. The spillway gates and place of performance are located at West Point Lake.
Notice text
6 versions
Update #6 · Latest ·
The U.S. Army Corps of Engineers, Mobile District, has a need for a construction contract to repair and re-paint six (6) spillway gates at West Point Lake. The objective of this project is for the contractor to provide all labor, materials, and equipment necessary to perform weld repairs, power wash, and prime and paint all metal components of the spillway gates, hoists, and associated equipment, and existing stoplogs (bid option) with a 3-A-Z vinyl paint system. In order to perform the work, the contractor shall set nine (9) stoplogs to dewater each gate. Only one (1) gate can be dewatered at a time. The existing paint system includes lead primer. Removal and disposal of any failing paint or primer will be accomplished in compliance with applicable laws and regulations. Minor repairs to gate seal keeper bars, skin plate, embedded sills, gate anchorage, lift cables/components, lifting machinery shall be performed as necessary while each gate is dewatered. Weld repairs shall be performed in accordance with AWS D 1.1 - non-tubular statically loaded structures. Repairs shall be done with the gates in place. The spillway gates shall be painted and repaired in the gate slots. The gates will not be allowed to be removed. Contractors shall show experience with similar projects that consist of painting Hydraulic Steel Structures in their gate slots, placing stop logs, replacing spillway gate wire ropes, and performing weld repairs on spillway gates. Amendment 0001 posted 4 January 2024 updates the response date and the site visit date. Amendment 0002 posted 4 January 2024 to move the site visit back to original date. Amendment 0003 posted 11 January 2024 adds back the missing 00 11 00s of the specifications. Amendment 0004 posted 17 January 2024 updates language in the 00 11 00. Amendment 0005 posted 23 January 2024 updates the response date, bid schedule, and the 01 00 00 specs.
Update #5 ·
The U.S. Army Corps of Engineers, Mobile District, has a need for a construction contract to repair and re-paint six (6) spillway gates at West Point Lake. The objective of this project is for the contractor to provide all labor, materials, and equipment necessary to perform weld repairs, power wash, and prime and paint all metal components of the spillway gates, hoists, and associated equipment, and existing stoplogs (bid option) with a 3-A-Z vinyl paint system. In order to perform the work, the contractor shall set nine (9) stoplogs to dewater each gate. Only one (1) gate can be dewatered at a time. The existing paint system includes lead primer. Removal and disposal of any failing paint or primer will be accomplished in compliance with applicable laws and regulations. Minor repairs to gate seal keeper bars, skin plate, embedded sills, gate anchorage, lift cables/components, lifting machinery shall be performed as necessary while each gate is dewatered. Weld repairs shall be performed in accordance with AWS D 1.1 - non-tubular statically loaded structures. Repairs shall be done with the gates in place. The spillway gates shall be painted and repaired in the gate slots. The gates will not be allowed to be removed. Contractors shall show experience with similar projects that consist of painting Hydraulic Steel Structures in their gate slots, placing stop logs, replacing spillway gate wire ropes, and performing weld repairs on spillway gates. Amendment 0001 posted 4 January 2024 updates the response date and the site visit date. Amendment 0002 posted 4 January 2024 to move the site visit back to original date. Amendment 0003 posted 11 January 2024 adds back the missing 00 11 00s of the specifications. Amendment 0004 posted 17 January 2024 updates language in the 00 11 00.
Update #4 ·
The U.S. Army Corps of Engineers, Mobile District, has a need for a construction contract to repair and re-paint six (6) spillway gates at West Point Lake. The objective of this project is for the contractor to provide all labor, materials, and equipment necessary to perform weld repairs, power wash, and prime and paint all metal components of the spillway gates, hoists, and associated equipment, and existing stoplogs (bid option) with a 3-A-Z vinyl paint system. In order to perform the work, the contractor shall set nine (9) stoplogs to dewater each gate. Only one (1) gate can be dewatered at a time. The existing paint system includes lead primer. Removal and disposal of any failing paint or primer will be accomplished in compliance with applicable laws and regulations. Minor repairs to gate seal keeper bars, skin plate, embedded sills, gate anchorage, lift cables/components, lifting machinery shall be performed as necessary while each gate is dewatered. Weld repairs shall be performed in accordance with AWS D 1.1 - non-tubular statically loaded structures. Repairs shall be done with the gates in place. The spillway gates shall be painted and repaired in the gate slots. The gates will not be allowed to be removed. Contractors shall show experience with similar projects that consist of painting Hydraulic Steel Structures in their gate slots, placing stop logs, replacing spillway gate wire ropes, and performing weld repairs on spillway gates. Amendment 0001 posted 4 January 2023 updates the response date and the site visit date. Amendment 0002 posted 4 January 2023 to move the site visit back to original date. Amendment 0003 posted 11 January 2023 adds back the missing 00 11 00s of the specifications.
Update #3 ·
The U.S. Army Corps of Engineers, Mobile District, has a need for a construction contract to repair and re-paint six (6) spillway gates at West Point Lake. The objective of this project is for the contractor to provide all labor, materials, and equipment necessary to perform weld repairs, power wash, and prime and paint all metal components of the spillway gates, hoists, and associated equipment, and existing stoplogs (bid option) with a 3-A-Z vinyl paint system. In order to perform the work, the contractor shall set nine (9) stoplogs to dewater each gate. Only one (1) gate can be dewatered at a time. The existing paint system includes lead primer. Removal and disposal of any failing paint or primer will be accomplished in compliance with applicable laws and regulations. Minor repairs to gate seal keeper bars, skin plate, embedded sills, gate anchorage, lift cables/components, lifting machinery shall be performed as necessary while each gate is dewatered. Weld repairs shall be performed in accordance with AWS D 1.1 - non-tubular statically loaded structures. Repairs shall be done with the gates in place. The spillway gates shall be painted and repaired in the gate slots. The gates will not be allowed to be removed. Contractors shall show experience with similar projects that consist of painting Hydraulic Steel Structures in their gate slots, placing stop logs, replacing spillway gate wire ropes, and performing weld repairs on spillway gates. Amendment 0001 posted 4 January 2023 updates the response date and the site visit date. Amendment 0002 posted 4 January 2023 to move the site visit back to original date.
Update #2 ·
The U.S. Army Corps of Engineers, Mobile District, has a need for a construction contract to repair and re-paint six (6) spillway gates at West Point Lake. The objective of this project is for the contractor to provide all labor, materials, and equipment necessary to perform weld repairs, power wash, and prime and paint all metal components of the spillway gates, hoists, and associated equipment, and existing stoplogs (bid option) with a 3-A-Z vinyl paint system. In order to perform the work, the contractor shall set nine (9) stoplogs to dewater each gate. Only one (1) gate can be dewatered at a time. The existing paint system includes lead primer. Removal and disposal of any failing paint or primer will be accomplished in compliance with applicable laws and regulations. Minor repairs to gate seal keeper bars, skin plate, embedded sills, gate anchorage, lift cables/components, lifting machinery shall be performed as necessary while each gate is dewatered. Weld repairs shall be performed in accordance with AWS D 1.1 - non-tubular statically loaded structures. Repairs shall be done with the gates in place. The spillway gates shall be painted and repaired in the gate slots. The gates will not be allowed to be removed. Contractors shall show experience with similar projects that consist of painting Hydraulic Steel Structures in their gate slots, placing stop logs, replacing spillway gate wire ropes, and performing weld repairs on spillway gates. Amendment 0001 posted 4 January 2023 updates the response date and the site visit date.
Update #1 ·
The U.S. Army Corps of Engineers, Mobile District, has a need for a construction contract to repair and re-paint six (6) spillway gates at West Point Lake. The objective of this project is for the contractor to provide all labor, materials, and equipment necessary to perform weld repairs, power wash, and prime and paint all metal components of the spillway gates, hoists, and associated equipment, and existing stoplogs (bid option) with a 3-A-Z vinyl paint system. In order to perform the work, the contractor shall set nine (9) stoplogs to dewater each gate. Only one (1) gate can be dewatered at a time. The existing paint system includes lead primer. Removal and disposal of any failing paint or primer will be accomplished in compliance with applicable laws and regulations. Minor repairs to gate seal keeper bars, skin plate, embedded sills, gate anchorage, lift cables/components, lifting machinery shall be performed as necessary while each gate is dewatered. Weld repairs shall be performed in accordance with AWS D 1.1 - non-tubular statically loaded structures. Repairs shall be done with the gates in place. The spillway gates shall be painted and repaired in the gate slots. The gates will not be allowed to be removed. Contractors shall show experience with similar projects that consist of painting Hydraulic Steel Structures in their gate slots, placing stop logs, replacing spillway gate wire ropes, and performing weld repairs on spillway gates.
Notice history
| Notice | Type | Posted |
|---|---|---|
| BIL West Point Spillway Gate Painting and Repair Industry Day | Award Notice | |
| This notice | Solicitation | |
| BIL West Point Spillway Gate Painting and Repair Industry Day | Pre-Solicitation | |
| BIL West Point Spillway Gate Painting and Repair Industry Day | Special Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity