Special Operations Forces (SOF) Operations Building, Fort Meade, MD
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912DR22R0010
- Agency
- ENDIST Baltimore US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Y1AA Construction Of Office Buildings
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation is seeking a construction contractor to build a new 114,000 square foot Special Operations Forces Operations Facility at Fort Meade, Maryland for the Joint Special Operations Command. The facility is a two story structure that will house approximately 196 personnel in open office, operations, secure compartmented information facility spaces, server rooms, and support areas. Proposals are due by August 19, 2022 and the construction duration is estimated to be 912 calendar days from notice to proceed. Evaluation criteria will consider technical approach, past performance, and price.
There is no set-aside designated for this opportunity. The primary NAICS code is 236220 and PSC code is S206. The place of performance will be Fort Meade, Maryland. As a new construction project, there are no incumbent or current contractors. The estimated budget was not provided but would align with the scope of building a 114,000 square foot specialized facility with secure and redundant mechanical and electrical systems at a military installation.
Notice text
6 versions
Update #6 · Latest ·
*** Amendment 0005 issued on 15 August 2022*** Amendment 0004 issued on 5 August 2022*** Amendment 0003 issued on 1 August 2022 *** Amendment 0002 issued on July 25, 2022 *** Amendment 01 issued on July 15, 2022***. This is a new requirement for the Joint Special Operations Command (JSOCOM). This project shall construct a new permanent SOF Operations Facility, (114,000 SF). Construct a specially designed SOF operations facility of permanent construction for approximately 196 personnel, including supporting facilities with associated site work and environmental measures. The facility will be built on Fort Meade, Maryland and will be a single construction award. The primary facility will be comprised of a two-story structure. The facility includes open office spaces, operations areas, SCIF spaces, large server areas, building utilities and connections and redundant mechanical and electrical systems, secure telecommunication distribution systems, loading/dock platform, and support space. The mission support areas provide joint staff offices, executive offices, labs, collaborative spaces, and meeting rooms. The project consists of core and shell structure and foundations; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm, and suppression; information technology and infrastructure, communications, and security systems support infrastructure; exterior finishes and weatherproofing. Interiors build out will provide raised access floor systems, acoustically rated interior partitions and ceilings, power, lighting, environmental control, and communications. The majority of the structure will be built to Sensitive Compartmented Information Facility (SCIF) standards. The SCIF areas will be designed per the Intelligence Community Technical Specification ICS 705-1. The project includes redundant primary power, on-site standby generation, and Uninterruptible Power Supply (UPS) systems to ensure continuity of operations. This project requires comprehensive interior design. Support facilities will include primary electrical service to the site, water, sewer, and telecommunications pathways. Includes site preparation and infrastructure improvements, utility services, and perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, courtyards, parking lots, roads, drop-off area with retractable bollards, paved loading dock and access road, fire access road, landscaping, and bio-retention areas.Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with Federal laws and Executive Orders. Low Impact Development features will be included in the design and construction this project as appropriate. Cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Construction duration is estimated to be 912 calendar days from notice to proceed.All proposals shall be submitted electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil/. Proposals submitted by mail or hand-carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912DR22R0010' to obtain more details.*
Update #5 ·
*** Amendment 0004 issued on 5 August 2022*** Amendment 0003 issued on 1 August 2022 *** Amendment 0002 issued on July 25, 2022 *** Amendment 01 issued on July 15, 2022***. This is a new requirement for the Joint Special Operations Command (JSOCOM). This project shall construct a new permanent SOF Operations Facility, (114,000 SF). Construct a specially designed SOF operations facility of permanent construction for approximately 196 personnel, including supporting facilities with associated site work and environmental measures. The facility will be built on Fort Meade, Maryland and will be a single construction award. The primary facility will be comprised of a two-story structure. The facility includes open office spaces, operations areas, SCIF spaces, large server areas, building utilities and connections and redundant mechanical and electrical systems, secure telecommunication distribution systems, loading/dock platform, and support space. The mission support areas provide joint staff offices, executive offices, labs, collaborative spaces, and meeting rooms. The project consists of core and shell structure and foundations; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm, and suppression; information technology and infrastructure, communications, and security systems support infrastructure; exterior finishes and weatherproofing. Interiors build out will provide raised access floor systems, acoustically rated interior partitions and ceilings, power, lighting, environmental control, and communications. The majority of the structure will be built to Sensitive Compartmented Information Facility (SCIF) standards. The SCIF areas will be designed per the Intelligence Community Technical Specification ICS 705-1. The project includes redundant primary power, on-site standby generation, and Uninterruptible Power Supply (UPS) systems to ensure continuity of operations. This project requires comprehensive interior design. Support facilities will include primary electrical service to the site, water, sewer, and telecommunications pathways. Includes site preparation and infrastructure improvements, utility services, and perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, courtyards, parking lots, roads, drop-off area with retractable bollards, paved loading dock and access road, fire access road, landscaping, and bio-retention areas.Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with Federal laws and Executive Orders. Low Impact Development features will be included in the design and construction this project as appropriate. Cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Construction duration is estimated to be 912 calendar days from notice to proceed.All proposals shall be submitted electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil/. Proposals submitted by mail or hand-carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912DR22R0010' to obtain more details.*
Update #4 ·
*** Amendment 0003 issued on 1 August 2022 *** Amendment 0002 issued on July 25, 2022 *** Amendment 01 issued on July 15, 2022***. This is a new requirement for the Joint Special Operations Command (JSOCOM). This project shall construct a new permanent SOF Operations Facility, (114,000 SF). Construct a specially designed SOF operations facility of permanent construction for approximately 196 personnel, including supporting facilities with associated site work and environmental measures. The facility will be built on Fort Meade, Maryland and will be a single construction award. The primary facility will be comprised of a two-story structure. The facility includes open office spaces, operations areas, SCIF spaces, large server areas, building utilities and connections and redundant mechanical and electrical systems, secure telecommunication distribution systems, loading/dock platform, and support space. The mission support areas provide joint staff offices, executive offices, labs, collaborative spaces, and meeting rooms. The project consists of core and shell structure and foundations; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm, and suppression; information technology and infrastructure, communications, and security systems support infrastructure; exterior finishes and weatherproofing. Interiors build out will provide raised access floor systems, acoustically rated interior partitions and ceilings, power, lighting, environmental control, and communications. The majority of the structure will be built to Sensitive Compartmented Information Facility (SCIF) standards. The SCIF areas will be designed per the Intelligence Community Technical Specification ICS 705-1. The project includes redundant primary power, on-site standby generation, and Uninterruptible Power Supply (UPS) systems to ensure continuity of operations. This project requires comprehensive interior design. Support facilities will include primary electrical service to the site, water, sewer, and telecommunications pathways. Includes site preparation and infrastructure improvements, utility services, and perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, courtyards, parking lots, roads, drop-off area with retractable bollards, paved loading dock and access road, fire access road, landscaping, and bio-retention areas.Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with Federal laws and Executive Orders. Low Impact Development features will be included in the design and construction this project as appropriate. Cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Construction duration is estimated to be 912 calendar days from notice to proceed.All proposals shall be submitted electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil/. Proposals submitted by mail or hand-carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912DR22R0010' to obtain more details.*
Update #3 ·
*** Amendment 0002 issued on July 25, 2022 *** Amendment 01 issued on July 15, 2022***. This is a new requirement for the Joint Special Operations Command (JSOCOM). This project shall construct a new permanent SOF Operations Facility, (114,000 SF). Construct a specially designed SOF operations facility of permanent construction for approximately 196 personnel, including supporting facilities with associated site work and environmental measures. The facility will be built on Fort Meade, Maryland and will be a single construction award. The primary facility will be comprised of a two-story structure. The facility includes open office spaces, operations areas, SCIF spaces, large server areas, building utilities and connections and redundant mechanical and electrical systems, secure telecommunication distribution systems, loading/dock platform, and support space. The mission support areas provide joint staff offices, executive offices, labs, collaborative spaces, and meeting rooms. The project consists of core and shell structure and foundations; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm, and suppression; information technology and infrastructure, communications, and security systems support infrastructure; exterior finishes and weatherproofing. Interiors build out will provide raised access floor systems, acoustically rated interior partitions and ceilings, power, lighting, environmental control, and communications. The majority of the structure will be built to Sensitive Compartmented Information Facility (SCIF) standards. The SCIF areas will be designed per the Intelligence Community Technical Specification ICS 705-1. The project includes redundant primary power, on-site standby generation, and Uninterruptible Power Supply (UPS) systems to ensure continuity of operations. This project requires comprehensive interior design. Support facilities will include primary electrical service to the site, water, sewer, and telecommunications pathways. Includes site preparation and infrastructure improvements, utility services, and perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, courtyards, parking lots, roads, drop-off area with retractable bollards, paved loading dock and access road, fire access road, landscaping, and bio-retention areas.Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with Federal laws and Executive Orders. Low Impact Development features will be included in the design and construction this project as appropriate. Cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Construction duration is estimated to be 912 calendar days from notice to proceed.All proposals shall be submitted electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil/. Proposals submitted by mail or hand-carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912DR22R0010' to obtain more details.*
Update #2 ·
*** Amendment 01 issued on July 15, 2022***. This is a new requirement for the Joint Special Operations Command (JSOCOM). This project shall construct a new permanent SOF Operations Facility, (114,000 SF). Construct a specially designed SOF operations facility of permanent construction for approximately 196 personnel, including supporting facilities with associated site work and environmental measures. The facility will be built on Fort Meade, Maryland and will be a single construction award. The primary facility will be comprised of a two-story structure. The facility includes open office spaces, operations areas, SCIF spaces, large server areas, building utilities and connections and redundant mechanical and electrical systems, secure telecommunication distribution systems, loading/dock platform, and support space. The mission support areas provide joint staff offices, executive offices, labs, collaborative spaces, and meeting rooms. The project consists of core and shell structure and foundations; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm, and suppression; information technology and infrastructure, communications, and security systems support infrastructure; exterior finishes and weatherproofing. Interiors build out will provide raised access floor systems, acoustically rated interior partitions and ceilings, power, lighting, environmental control, and communications. The majority of the structure will be built to Sensitive Compartmented Information Facility (SCIF) standards. The SCIF areas will be designed per the Intelligence Community Technical Specification ICS 705-1. The project includes redundant primary power, on-site standby generation, and Uninterruptible Power Supply (UPS) systems to ensure continuity of operations. This project requires comprehensive interior design. Support facilities will include primary electrical service to the site, water, sewer, and telecommunications pathways. Includes site preparation and infrastructure improvements, utility services, and perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, courtyards, parking lots, roads, drop-off area with retractable bollards, paved loading dock and access road, fire access road, landscaping, and bio-retention areas.Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with Federal laws and Executive Orders. Low Impact Development features will be included in the design and construction this project as appropriate. Cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Construction duration is estimated to be 912 calendar days from notice to proceed.All proposals shall be submitted electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil/. Proposals submitted by mail or hand-carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912DR22R0010' to obtain more details.*
Update #1 ·
This is a new requirement for the Joint Special Operations Command (JSOCOM). This project shall construct a new permanent SOF Operations Facility, (114,000 SF). Construct a specially designed SOF operations facility of permanent construction for approximately 196 personnel, including supporting facilities with associated site work and environmental measures. The facility will be built on Fort Meade, Maryland and will be a single construction award. The primary facility will be comprised of a two-story structure. The facility includes open office spaces, operations areas, SCIF spaces, large server areas, building utilities and connections and redundant mechanical and electrical systems, secure telecommunication distribution systems, loading/dock platform, and support space. The mission support areas provide joint staff offices, executive offices, labs, collaborative spaces, and meeting rooms. The project consists of core and shell structure and foundations; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm, and suppression; information technology and infrastructure, communications, and security systems support infrastructure; exterior finishes and weatherproofing. Interiors build out will provide raised access floor systems, acoustically rated interior partitions and ceilings, power, lighting, environmental control, and communications. The majority of the structure will be built to Sensitive Compartmented Information Facility (SCIF) standards. The SCIF areas will be designed per the Intelligence Community Technical Specification ICS 705-1. The project includes redundant primary power, on-site standby generation, and Uninterruptible Power Supply (UPS) systems to ensure continuity of operations. This project requires comprehensive interior design. Support facilities will include primary electrical service to the site, water, sewer, and telecommunications pathways. Includes site preparation and infrastructure improvements, utility services, and perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, courtyards, parking lots, roads, drop-off area with retractable bollards, paved loading dock and access road, fire access road, landscaping, and bio-retention areas.Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with Federal laws and Executive Orders. Low Impact Development features will be included in the design and construction this project as appropriate. Cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Construction duration is estimated to be 912 calendar days from notice to proceed.All proposals shall be submitted electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil/. Proposals submitted by mail or hand-carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912DR22R0010' to obtain more details.*
Notice history
| Notice | Type | Posted |
|---|---|---|
| Special Operations Forces (SOF) Operations Building, Fort Meade, MD | Award Notice | |
| Special Operations Forces (SOF) Operations Building, Fort Meade, MD | Solicitation | |
| SOF operations building, fort meade, MD | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity