SOF operations building, fort meade, MD

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W912DR22R0010
Agency
ENDIST Baltimore US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Y1AA Construction Of Office Buildings
Place of performance
Fort George G Meade, Maryland 20755, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice is for the construction of a new Special Operations Forces Operations facility at Fort Meade, Maryland. The Joint Special Operations Command within the Department of the Army is seeking to construct a 114,000 square foot facility to house approximately 196 personnel. Key requirements for the facility include SCIF spaces, server areas, loading dock, and redundant mechanical and electrical systems. The facility must meet DoD high performance and sustainable building requirements. The estimated construction duration is 1232 calendar days.

There is no set-aside designation for this procurement. The primary NAICS code is 236220 and PSC code is S206. As a new requirement, there are no current incumbents. The estimated construction costs are not provided but given the size and technical requirements of the facility, the contract value is expected to be significant. The pre-solicitation notice was posted on April 15, 2022 and the formal solicitation is expected to be released on or around May 15, 2022 with a due date of June 15, 2022 for responses.

Notice text

4 versions

Update #4 · Latest ·

*** THE SOLICITATION FOR THIS PROJECT IS EXPECTED TO BE RELEASED O/A 29 June 2022

THIS PROJECT IS UNRESTRICTED - Design-Bid-Build Best-Value Tradeoff

SOF OPERATIONS BUILDING, FORT MEADE, MD

This is a new requirement for the Joint Special Operations Command (JSOCOM). This project shall construct a new permanent SOF Operations Facility, (114,000 SF). Construct a specially designed SOF operations facility of permanent construction for approximately 196 personnel, including supporting facilities with associated site work and environmental measures. The facility will be built on Fort Meade, Maryland and will be a single construction award. The primary facility will be comprised of a two-story structure. The facility includes open office spaces, operations areas, SCIF spaces, large server areas, building utilities and connections and redundant mechanical and electrical systems, secure telecommunication distribution systems, loading/dock platform, and support space. The mission support areas provide joint staff offices, executive offices, labs, collaborative spaces, and meeting rooms. The project consists of core and shell structure and foundations; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm, and suppression; information technology and infrastructure, communications, and security systems support infrastructure; exterior finishes and weatherproofing. Interiors build out will provide raised access floor systems, acoustically rated interior partitions and ceilings, power, lighting, environmental control, and communications. The majority of the structure will be built to Sensitive Compartmented Information Facility (SCIF) standards. The SCIF areas will be designed per the Intelligence Community Technical Specification ICS 705-1. The project includes redundant primary power, on-site standby generation, and Uninterruptible Power Supply (UPS) systems to ensure continuity of operations. This project requires comprehensive interior design. Support facilities will include primary electrical service to the site, water, sewer, and telecommunications pathways. Includes site preparation and infrastructure improvements, utility services, and perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, courtyards, parking lots, roads, drop-off area with retractable bollards, paved loading dock and access road, fire access road, landscaping, and bio-retention areas.

Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with Federal laws and Executive Orders. Low Impact Development features will be included in the design and construction this project as appropriate. Cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Construction duration is estimated to be 912 calendar days from notice to proceed.

All proposals shall be submitted electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil/. Proposals submitted by mail or hand-carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved.

Update #3 ·

*** THE SOLICITATION FOR THIS PROJECT IS EXPECTED TO BE RELEASED O/A 15 MAY 2022***

THIS PROJECT IS UNRESTRICTED - Design-Bid-Build Best-Value Tradeoff

SOF OPERATIONS BUILDING, FORT MEADE, MD

This is a new requirement for the Joint Special Operations Command (JSOCOM). This project shall construct a new permanent SOF Operations Facility, (114,000 SF). Construct a specially designed SOF operations facility of permanent construction for approximately 196 personnel, including supporting facilities with associated site work and environmental measures. The facility will be built on Fort Meade, Maryland and will be a single construction award. The primary facility will be comprised of a two-story structure. The facility includes open office spaces, operations areas, SCIF spaces, large server areas, building utilities and connections and redundant mechanical and electrical systems, secure telecommunication distribution systems, loading/dock platform, and support space. The mission support areas provide joint staff offices, executive offices, labs, collaborative spaces, and meeting rooms. The project consists of core and shell structure and foundations; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm, and suppression; information technology and infrastructure, communications, and security systems support infrastructure; exterior finishes and weatherproofing. Interiors build out will provide raised access floor systems, acoustically rated interior partitions and ceilings, power, lighting, environmental control, and communications. The majority of the structure will be built to Sensitive Compartmented Information Facility (SCIF) standards. The SCIF areas will be designed per the Intelligence Community Technical Specification ICS 705-1. The project includes redundant primary power, on-site standby generation, and Uninterruptible Power Supply (UPS) systems to ensure continuity of operations. This project requires comprehensive interior design. Support facilities will include primary electrical service to the site, water, sewer, and telecommunications pathways. Includes site preparation and infrastructure improvements, utility services, and perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, courtyards, parking lots, roads, drop-off area with retractable bollards, paved loading dock and access road, fire access road, landscaping, and bio-retention areas.

Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with Federal laws and Executive Orders. Low Impact Development features will be included in the design and construction this project as appropriate. Cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Construction duration is estimated to be 1232 calendar days.

Update #2 ·

*** THE SOLICITATION FOR THIS PROJECT IS EXPECTED TO BE RELEASED O/A 15 MAY 2022***

THIS PROJECT IS UNRESTRICTED - Design Build Best-Value Tradeoff

SOF OPERATIONS BUILDING, FORT MEADE, MD

This is a new requirement for the Joint Special Operations Command (JSOCOM). This project shall construct a new permanent SOF Operations Facility, (114,000 SF). Construct a specially designed SOF operations facility of permanent construction for approximately 196 personnel, including supporting facilities with associated site work and environmental measures. The facility will be built on Fort Meade, Maryland and will be a single construction award. The primary facility will be comprised of a two-story structure. The facility includes open office spaces, operations areas, SCIF spaces, large server areas, building utilities and connections and redundant mechanical and electrical systems, secure telecommunication distribution systems, loading/dock platform, and support space. The mission support areas provide joint staff offices, executive offices, labs, collaborative spaces, and meeting rooms. The project consists of core and shell structure and foundations; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm, and suppression; information technology and infrastructure, communications, and security systems support infrastructure; exterior finishes and weatherproofing. Interiors build out will provide raised access floor systems, acoustically rated interior partitions and ceilings, power, lighting, environmental control, and communications. The majority of the structure will be built to Sensitive Compartmented Information Facility (SCIF) standards. The SCIF areas will be designed per the Intelligence Community Technical Specification ICS 705-1. The project includes redundant primary power, on-site standby generation, and Uninterruptible Power Supply (UPS) systems to ensure continuity of operations. This project requires comprehensive interior design. Support facilities will include primary electrical service to the site, water, sewer, and telecommunications pathways. Includes site preparation and infrastructure improvements, utility services, and perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, courtyards, parking lots, roads, drop-off area with retractable bollards, paved loading dock and access road, fire access road, landscaping, and bio-retention areas.

Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with Federal laws and Executive Orders. Low Impact Development features will be included in the design and construction this project as appropriate. Cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Construction duration is estimated to be 1232 calendar days.

Update #1 ·

*** THE SOLICITATION FOR THIS PROJECT IS EXPECTED TO BE RELEASED O/A 15 MAY 2022***

THIS PROJECT IS UNRESTRICTED.

SOF OPERATIONS BUILDING, FORT MEADE, MD

This is a new requirement for the Joint Special Operations Command (JSOCOM). This project shall construct a new permanent SOF Operations Facility, (114,000 SF). Construct a specially designed SOF operations facility of permanent construction for approximately 196 personnel, including supporting facilities with associated site work and environmental measures. The facility will be built on Fort Meade, Maryland and will be a single construction award. The primary facility will be comprised of a two-story structure. The facility includes open office spaces, operations areas, SCIF spaces, large server areas, building utilities and connections and redundant mechanical and electrical systems, secure telecommunication distribution systems, loading/dock platform, and support space. The mission support areas provide joint staff offices, executive offices, labs, collaborative spaces, and meeting rooms. The project consists of core and shell structure and foundations; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm, and suppression; information technology and infrastructure, communications, and security systems support infrastructure; exterior finishes and weatherproofing. Interiors build out will provide raised access floor systems, acoustically rated interior partitions and ceilings, power, lighting, environmental control, and communications. The majority of the structure will be built to Sensitive Compartmented Information Facility (SCIF) standards. The SCIF areas will be designed per the Intelligence Community Technical Specification ICS 705-1. The project includes redundant primary power, on-site standby generation, and Uninterruptible Power Supply (UPS) systems to ensure continuity of operations. This project requires comprehensive interior design. Support facilities will include primary electrical service to the site, water, sewer, and telecommunications pathways. Includes site preparation and infrastructure improvements, utility services, and perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, courtyards, parking lots, roads, drop-off area with retractable bollards, paved loading dock and access road, fire access road, landscaping, and bio-retention areas.

Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with Federal laws and Executive Orders. Low Impact Development features will be included in the design and construction this project as appropriate. Cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Construction duration is estimated to be 1232 calendar days.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Special Operations Forces (SOF) Operations Building, Fort Meade, MD Award Award Notice
Special Operations Forces (SOF) Operations Building, Fort Meade, MD Latest solicitation Solicitation
SOF operations building, fort meade, MD This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity