Spawar afloat global C4ISR installations contract

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
N00039-18-R-0059
Agency
Naval Information Warfare Systems Command Department of the Navy, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
541330 Engineering Services
PSC
Not on record
More information

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals to provide global command, control, communications, computers, intelligence, surveillance and reconnaissance installations aboard naval vessels for the Department of the Navy Information Warfare Systems Command. Offerors must demonstrate over $95 million in relevant shipboard installation experience and $30 million in submarine installation experience. Proposals will be evaluated based on technical approach, past performance, and participation of small businesses. The final request for proposals is scheduled for release on March 20, 2018, with questions for an industry day due by January 18, 2018.

There is no set-aside designated. The primary NAICS code is 541715 and PSC code is D302. The total potential contract value across multiple awardees is $2.45 billion over five years. Current contractors providing similar services include General Dynamics Information Technology. The contract will have a one base year and four one-year options, providing installation support for C4ISR systems aboard ships and submarines through 2028.

Notice text

17 versions

Update #17 · Latest ·

Added: Jan 11, 2018 4:32 pm Modified: Jun 27, 2018 11:31 amTrack Changes UPDATE 27JUN2018: The file for questions and answers posted on 25JUN2018 is being posted again (as Q and A - N00039-18-R-0059 - AFLOAT - 25JUN2018 v2.pdf) to the e- Commerce website due to technical issues.



***********************************************************************

UPDATE #2 for 25JUN2018: Answers to the latest questions received are being provided.

Attachments include: - Q and A - N00039-18-R-0059 - Afloat - 25JUN2018 #2



***********************************************************************

UPDATE 25JUN2018: Answers to the latest questions received are being provided.

Attachments include: - Q and A - N00039-18-R-0059 - Afloat - 25JUN2018



***********************************************************************

UPDATE 19JUN2018: RFP Amendment 0005 has been posted to the e-Commerce website. The purpose of this amendment is to revise the solicitation based on questions received. A Conformed Copy of the RFP through Amendment 0005 has also been posted to the e-commerce website. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-0005 - N00039-18-R-0059-Conformed copy through Amendment 0005 - Revised RFP Attachment 12 (19JUN2018)





*********************************************************************** UPDATE 13JUN2018: RFP Amendment 0004 has been posted to the e-commerce website. The purpose of this amendment is to revise the solicitation and to extend the proposal due date. A Conformed Copy of the RFP through Amendment 0004 has also been posted to the e-commerce website.

Attachments include: - N00039-18-R-0059-0004 - N00039-18-R-0059-Conformed copy through Amendment 0004 - Revised RFP Attachment 12 - Q and A - N00039-18-R-0059 - Afloat - 19JUN2018



***********************************************************************



UPDATE 08JUN2018: A Conformed Copy of the RFP through Amendment 0003 has been posted to the e-commerce website. The conformed copy shows the solicitation with all of the changes that have been made through Amendment 0003. The conformed copy is being posted in response to questions received. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-Conformed copy through Amendment 0003 - Q and A - N00039-18-R-0059 - Afloat - 08JUN2018

***********************************************************************



UPDATE 06JUN2018: RFP Amendment 0003 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide a revised proposal due date. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-0003 - Q and A - N00039-18-R-0059 - Afloat - 06JUN2018

***********************************************************************

UPDATE 01JUN2018: An updated Q&A document has been posted to the e-Commerce website.

Attachments include: - Q and A N00039-18-R-0059 - Afloat - 01JUN2018





***********************************************************************

UPDATE 25MAY2018: RFP Amendment 0002 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0002 - Q and A N00039-18-R-0059 - Afloat - 25MAY2018

***********************************************************************

UPDATE 22MAY2018: RFP Amendment 0001 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0001 - Q and A N00039-18-R-0059 - Afloat - 22MAY2018 - Updated Attachment 6 - Updated Attachment 8 - Afloat Industry Day II - Attendee List - Afloat Industry Day II - PowerPoint Presentation



**********************************************************



UPDATE 27APR2018: Questions received prior to the Close of Business (COB) on 10 May 2018 will be answered at the Industry Day. Answers to questions received after COB on 10 May 2018 and answers provided to questions received at the Industry Day will be posted to the eCommerce website as soon as possible after the Industry Day.



**********************************************************

UPDATE 27APR2018: The FINAL RFP has been posted to the SPAWAR e-Commerce Website. The proposal due date is 13 June 2018.

An Industry Day has been scheduled for 15 May 2018. Details of the Industry Day have been posted to the SPAWAR e-Commerce Website.





**********************************************************



UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.

The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.





********************************************************

Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.

***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.

The current anticipated FINAL RFP release date for this procurement is 20 March 2018.

An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.

Update #16 ·

Added: Jan 11, 2018 4:32 pm Modified: Jun 25, 2018 7:00 pmTrack Changes UPDATE #2 for 25JUN2018: Answers to the latest questions received are being provided.

Attachments include: - Q and A - N00039-18-R-0059 - Afloat - 25JUN2018 #2



***********************************************************************

UPDATE 25JUN2018: Answers to the latest questions received are being provided.

Attachments include: - Q and A - N00039-18-R-0059 - Afloat - 25JUN2018



***********************************************************************

UPDATE 19JUN2018: RFP Amendment 0005 has been posted to the e-Commerce website. The purpose of this amendment is to revise the solicitation based on questions received. A Conformed Copy of the RFP through Amendment 0005 has also been posted to the e-commerce website. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-0005 - N00039-18-R-0059-Conformed copy through Amendment 0005 - Revised RFP Attachment 12 (19JUN2018)





*********************************************************************** UPDATE 13JUN2018: RFP Amendment 0004 has been posted to the e-commerce website. The purpose of this amendment is to revise the solicitation and to extend the proposal due date. A Conformed Copy of the RFP through Amendment 0004 has also been posted to the e-commerce website.

Attachments include: - N00039-18-R-0059-0004 - N00039-18-R-0059-Conformed copy through Amendment 0004 - Revised RFP Attachment 12 - Q and A - N00039-18-R-0059 - Afloat - 19JUN2018



***********************************************************************



UPDATE 08JUN2018: A Conformed Copy of the RFP through Amendment 0003 has been posted to the e-commerce website. The conformed copy shows the solicitation with all of the changes that have been made through Amendment 0003. The conformed copy is being posted in response to questions received. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-Conformed copy through Amendment 0003 - Q and A - N00039-18-R-0059 - Afloat - 08JUN2018

***********************************************************************



UPDATE 06JUN2018: RFP Amendment 0003 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide a revised proposal due date. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-0003 - Q and A - N00039-18-R-0059 - Afloat - 06JUN2018

***********************************************************************

UPDATE 01JUN2018: An updated Q&A document has been posted to the e-Commerce website.

Attachments include: - Q and A N00039-18-R-0059 - Afloat - 01JUN2018





***********************************************************************

UPDATE 25MAY2018: RFP Amendment 0002 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0002 - Q and A N00039-18-R-0059 - Afloat - 25MAY2018

***********************************************************************

UPDATE 22MAY2018: RFP Amendment 0001 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0001 - Q and A N00039-18-R-0059 - Afloat - 22MAY2018 - Updated Attachment 6 - Updated Attachment 8 - Afloat Industry Day II - Attendee List - Afloat Industry Day II - PowerPoint Presentation



**********************************************************



UPDATE 27APR2018: Questions received prior to the Close of Business (COB) on 10 May 2018 will be answered at the Industry Day. Answers to questions received after COB on 10 May 2018 and answers provided to questions received at the Industry Day will be posted to the eCommerce website as soon as possible after the Industry Day.



**********************************************************

UPDATE 27APR2018: The FINAL RFP has been posted to the SPAWAR e-Commerce Website. The proposal due date is 13 June 2018.

An Industry Day has been scheduled for 15 May 2018. Details of the Industry Day have been posted to the SPAWAR e-Commerce Website.





**********************************************************



UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.

The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.





********************************************************

Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.

***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.

The current anticipated FINAL RFP release date for this procurement is 20 March 2018.

An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.

Update #15 ·

Added: Jan 11, 2018 4:32 pm Modified: Jun 25, 2018 1:54 pmTrack Changes UPDATE 25JUN2018: Answers to the latest questions received are being provided.

Attachments include: - Q and A - N00039-18-R-0059 - Afloat - 25JUN2018



***********************************************************************

UPDATE 19JUN2018: RFP Amendment 0005 has been posted to the e-Commerce website. The purpose of this amendment is to revise the solicitation based on questions received. A Conformed Copy of the RFP through Amendment 0005 has also been posted to the e-commerce website. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-0005 - N00039-18-R-0059-Conformed copy through Amendment 0005 - Revised RFP Attachment 12 (19JUN2018)





*********************************************************************** UPDATE 13JUN2018: RFP Amendment 0004 has been posted to the e-commerce website. The purpose of this amendment is to revise the solicitation and to extend the proposal due date. A Conformed Copy of the RFP through Amendment 0004 has also been posted to the e-commerce website.

Attachments include: - N00039-18-R-0059-0004 - N00039-18-R-0059-Conformed copy through Amendment 0004 - Revised RFP Attachment 12 - Q and A - N00039-18-R-0059 - Afloat - 19JUN2018



***********************************************************************



UPDATE 08JUN2018: A Conformed Copy of the RFP through Amendment 0003 has been posted to the e-commerce website. The conformed copy shows the solicitation with all of the changes that have been made through Amendment 0003. The conformed copy is being posted in response to questions received. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-Conformed copy through Amendment 0003 - Q and A - N00039-18-R-0059 - Afloat - 08JUN2018

***********************************************************************



UPDATE 06JUN2018: RFP Amendment 0003 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide a revised proposal due date. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-0003 - Q and A - N00039-18-R-0059 - Afloat - 06JUN2018

***********************************************************************

UPDATE 01JUN2018: An updated Q&A document has been posted to the e-Commerce website.

Attachments include: - Q and A N00039-18-R-0059 - Afloat - 01JUN2018





***********************************************************************

UPDATE 25MAY2018: RFP Amendment 0002 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0002 - Q and A N00039-18-R-0059 - Afloat - 25MAY2018

***********************************************************************

UPDATE 22MAY2018: RFP Amendment 0001 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0001 - Q and A N00039-18-R-0059 - Afloat - 22MAY2018 - Updated Attachment 6 - Updated Attachment 8 - Afloat Industry Day II - Attendee List - Afloat Industry Day II - PowerPoint Presentation



**********************************************************



UPDATE 27APR2018: Questions received prior to the Close of Business (COB) on 10 May 2018 will be answered at the Industry Day. Answers to questions received after COB on 10 May 2018 and answers provided to questions received at the Industry Day will be posted to the eCommerce website as soon as possible after the Industry Day.



**********************************************************

UPDATE 27APR2018: The FINAL RFP has been posted to the SPAWAR e-Commerce Website. The proposal due date is 13 June 2018.

An Industry Day has been scheduled for 15 May 2018. Details of the Industry Day have been posted to the SPAWAR e-Commerce Website.





**********************************************************



UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.

The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.





********************************************************

Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.

***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.

The current anticipated FINAL RFP release date for this procurement is 20 March 2018.

An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.

Update #14 ·

Added: Jan 11, 2018 4:32 pm Modified: Jun 19, 2018 3:54 pmTrack Changes UPDATE 19JUN2018: RFP Amendment 0005 has been posted to the e-Commerce website. The purpose of this amendment is to revise the solicitation based on questions received. A Conformed Copy of the RFP through Amendment 0005 has also been posted to the e-commerce website. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-0005 - N00039-18-R-0059-Conformed copy through Amendment 0005 - Revised RFP Attachment 12 (19JUN2018)





*********************************************************************** UPDATE 13JUN2018: RFP Amendment 0004 has been posted to the e-commerce website. The purpose of this amendment is to revise the solicitation and to extend the proposal due date. A Conformed Copy of the RFP through Amendment 0004 has also been posted to the e-commerce website.

Attachments include: - N00039-18-R-0059-0004 - N00039-18-R-0059-Conformed copy through Amendment 0004 - Revised RFP Attachment 12 - Q and A - N00039-18-R-0059 - Afloat - 19JUN2018



***********************************************************************



UPDATE 08JUN2018: A Conformed Copy of the RFP through Amendment 0003 has been posted to the e-commerce website. The conformed copy shows the solicitation with all of the changes that have been made through Amendment 0003. The conformed copy is being posted in response to questions received. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-Conformed copy through Amendment 0003 - Q and A - N00039-18-R-0059 - Afloat - 08JUN2018

***********************************************************************



UPDATE 06JUN2018: RFP Amendment 0003 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide a revised proposal due date. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-0003 - Q and A - N00039-18-R-0059 - Afloat - 06JUN2018

***********************************************************************

UPDATE 01JUN2018: An updated Q&A document has been posted to the e-Commerce website.

Attachments include: - Q and A N00039-18-R-0059 - Afloat - 01JUN2018





***********************************************************************

UPDATE 25MAY2018: RFP Amendment 0002 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0002 - Q and A N00039-18-R-0059 - Afloat - 25MAY2018

***********************************************************************

UPDATE 22MAY2018: RFP Amendment 0001 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0001 - Q and A N00039-18-R-0059 - Afloat - 22MAY2018 - Updated Attachment 6 - Updated Attachment 8 - Afloat Industry Day II - Attendee List - Afloat Industry Day II - PowerPoint Presentation



**********************************************************



UPDATE 27APR2018: Questions received prior to the Close of Business (COB) on 10 May 2018 will be answered at the Industry Day. Answers to questions received after COB on 10 May 2018 and answers provided to questions received at the Industry Day will be posted to the eCommerce website as soon as possible after the Industry Day.



**********************************************************

UPDATE 27APR2018: The FINAL RFP has been posted to the SPAWAR e-Commerce Website. The proposal due date is 13 June 2018.

An Industry Day has been scheduled for 15 May 2018. Details of the Industry Day have been posted to the SPAWAR e-Commerce Website.





**********************************************************



UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.

The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.





********************************************************

Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.

***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.

The current anticipated FINAL RFP release date for this procurement is 20 March 2018.

An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.

Update #13 ·

Added: Jan 11, 2018 4:32 pm Modified: Jun 19, 2018 3:52 pmTrack Changes UPDATE 13JUN2018: RFP Amendment 0005 has been posted to the e-Commerce website. The purpose of this amendment is to revise the solicitation based on questions received. A Conformed Copy of the RFP through Amendment 0005 has also been posted to the e-commerce website. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-0005 - N00039-18-R-0059-Conformed copy through Amendment 0005 - Revised RFP Attachment 12 (19JUN2018)





*********************************************************************** UPDATE 13JUN2018: RFP Amendment 0004 has been posted to the e-commerce website. The purpose of this amendment is to revise the solicitation and to extend the proposal due date. A Conformed Copy of the RFP through Amendment 0004 has also been posted to the e-commerce website.

Attachments include: - N00039-18-R-0059-0004 - N00039-18-R-0059-Conformed copy through Amendment 0004 - Revised RFP Attachment 12 - Q and A - N00039-18-R-0059 - Afloat - 19JUN2018



***********************************************************************



UPDATE 08JUN2018: A Conformed Copy of the RFP through Amendment 0003 has been posted to the e-commerce website. The conformed copy shows the solicitation with all of the changes that have been made through Amendment 0003. The conformed copy is being posted in response to questions received. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-Conformed copy through Amendment 0003 - Q and A - N00039-18-R-0059 - Afloat - 08JUN2018

***********************************************************************



UPDATE 06JUN2018: RFP Amendment 0003 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide a revised proposal due date. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-0003 - Q and A - N00039-18-R-0059 - Afloat - 06JUN2018

***********************************************************************

UPDATE 01JUN2018: An updated Q&A document has been posted to the e-Commerce website.

Attachments include: - Q and A N00039-18-R-0059 - Afloat - 01JUN2018





***********************************************************************

UPDATE 25MAY2018: RFP Amendment 0002 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0002 - Q and A N00039-18-R-0059 - Afloat - 25MAY2018

***********************************************************************

UPDATE 22MAY2018: RFP Amendment 0001 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0001 - Q and A N00039-18-R-0059 - Afloat - 22MAY2018 - Updated Attachment 6 - Updated Attachment 8 - Afloat Industry Day II - Attendee List - Afloat Industry Day II - PowerPoint Presentation



**********************************************************



UPDATE 27APR2018: Questions received prior to the Close of Business (COB) on 10 May 2018 will be answered at the Industry Day. Answers to questions received after COB on 10 May 2018 and answers provided to questions received at the Industry Day will be posted to the eCommerce website as soon as possible after the Industry Day.



**********************************************************

UPDATE 27APR2018: The FINAL RFP has been posted to the SPAWAR e-Commerce Website. The proposal due date is 13 June 2018.

An Industry Day has been scheduled for 15 May 2018. Details of the Industry Day have been posted to the SPAWAR e-Commerce Website.





**********************************************************



UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.

The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.





********************************************************

Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.

***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.

The current anticipated FINAL RFP release date for this procurement is 20 March 2018.

An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.

Update #12 ·

Added: Jan 11, 2018 4:32 pm Modified: Jun 13, 2018 4:25 pmTrack Changes UPDATE 13JUN2018: RFP Amendment 0004 has been posted to the e-commerce website. The purpose of this amendment is to revise the solicitation and to extend the proposal due date. A Conformed Copy of the RFP through Amendment 0004 has also been posted to the e-commerce website.

Attachments include: - N00039-18-R-0059-0004 - N00039-18-R-0059-Conformed copy through Amendment 0004 - Revised RFP Attachment 12



***********************************************************************



UPDATE 08JUN2018: A Conformed Copy of the RFP through Amendment 0003 has been posted to the e-commerce website. The conformed copy shows the solicitation with all of the changes that have been made through Amendment 0003. The conformed copy is being posted in response to questions received. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-Conformed copy through Amendment 0003 - Q and A - N00039-18-R-0059 - Afloat - 08JUN2018

***********************************************************************



UPDATE 06JUN2018: RFP Amendment 0003 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide a revised proposal due date. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-0003 - Q and A - N00039-18-R-0059 - Afloat - 06JUN2018

***********************************************************************

UPDATE 01JUN2018: An updated Q&A document has been posted to the e-Commerce website.

Attachments include: - Q and A N00039-18-R-0059 - Afloat - 01JUN2018





***********************************************************************

UPDATE 25MAY2018: RFP Amendment 0002 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0002 - Q and A N00039-18-R-0059 - Afloat - 25MAY2018

***********************************************************************

UPDATE 22MAY2018: RFP Amendment 0001 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0001 - Q and A N00039-18-R-0059 - Afloat - 22MAY2018 - Updated Attachment 6 - Updated Attachment 8 - Afloat Industry Day II - Attendee List - Afloat Industry Day II - PowerPoint Presentation



**********************************************************



UPDATE 27APR2018: Questions received prior to the Close of Business (COB) on 10 May 2018 will be answered at the Industry Day. Answers to questions received after COB on 10 May 2018 and answers provided to questions received at the Industry Day will be posted to the eCommerce website as soon as possible after the Industry Day.



**********************************************************

UPDATE 27APR2018: The FINAL RFP has been posted to the SPAWAR e-Commerce Website. The proposal due date is 13 June 2018.

An Industry Day has been scheduled for 15 May 2018. Details of the Industry Day have been posted to the SPAWAR e-Commerce Website.





**********************************************************



UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.

The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.





********************************************************

Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.

***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.

The current anticipated FINAL RFP release date for this procurement is 20 March 2018.

An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.

Update #11 ·

Added: Jan 11, 2018 4:32 pm Modified: Jun 08, 2018 3:15 pmTrack Changes UPDATE 08JUN2018: A Conformed Copy of the RFP through Amendment 0003 has been posted to the e-commerce website. The conformed copy shows the solicitation with all of the changes that have been made through Amendment 0003. The conformed copy is being posted in response to questions received. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-Conformed copy through Amendment 0003 - Q and A - N00039-18-R-0059 - Afloat - 08JUN2018

***********************************************************************



UPDATE 06JUN2018: RFP Amendment 0003 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide a revised proposal due date. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-0003 - Q and A - N00039-18-R-0059 - Afloat - 06JUN2018

***********************************************************************

UPDATE 01JUN2018: An updated Q&A document has been posted to the e-Commerce website.

Attachments include: - Q and A N00039-18-R-0059 - Afloat - 01JUN2018





***********************************************************************

UPDATE 25MAY2018: RFP Amendment 0002 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0002 - Q and A N00039-18-R-0059 - Afloat - 25MAY2018

***********************************************************************

UPDATE 22MAY2018: RFP Amendment 0001 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0001 - Q and A N00039-18-R-0059 - Afloat - 22MAY2018 - Updated Attachment 6 - Updated Attachment 8 - Afloat Industry Day II - Attendee List - Afloat Industry Day II - PowerPoint Presentation



**********************************************************



UPDATE 27APR2018: Questions received prior to the Close of Business (COB) on 10 May 2018 will be answered at the Industry Day. Answers to questions received after COB on 10 May 2018 and answers provided to questions received at the Industry Day will be posted to the eCommerce website as soon as possible after the Industry Day.



**********************************************************

UPDATE 27APR2018: The FINAL RFP has been posted to the SPAWAR e-Commerce Website. The proposal due date is 13 June 2018.

An Industry Day has been scheduled for 15 May 2018. Details of the Industry Day have been posted to the SPAWAR e-Commerce Website.





**********************************************************



UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.

The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.





********************************************************

Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.

***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.

The current anticipated FINAL RFP release date for this procurement is 20 March 2018.

An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.

Update #10 ·

Added: Jan 11, 2018 4:32 pm Modified: Jun 06, 2018 5:31 pmTrack Changes UPDATE 06JUN2018: RFP Amendment 0003 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide a revised proposal due date. Answers to the latest questions received are also being provided.

Attachments include: - N00039-18-R-0059-0003 - Q and A - N00039-18-R-0059 - Afloat - 06JUN2018

***********************************************************************

UPDATE 01JUN2018: An updated Q&A document has been posted to the e-Commerce website.

Attachments include: - Q and A N00039-18-R-0059 - Afloat - 01JUN2018





***********************************************************************

UPDATE 25MAY2018: RFP Amendment 0002 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0002 - Q and A N00039-18-R-0059 - Afloat - 25MAY2018

***********************************************************************

UPDATE 22MAY2018: RFP Amendment 0001 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0001 - Q and A N00039-18-R-0059 - Afloat - 22MAY2018 - Updated Attachment 6 - Updated Attachment 8 - Afloat Industry Day II - Attendee List - Afloat Industry Day II - PowerPoint Presentation



**********************************************************



UPDATE 27APR2018: Questions received prior to the Close of Business (COB) on 10 May 2018 will be answered at the Industry Day. Answers to questions received after COB on 10 May 2018 and answers provided to questions received at the Industry Day will be posted to the eCommerce website as soon as possible after the Industry Day.



**********************************************************

UPDATE 27APR2018: The FINAL RFP has been posted to the SPAWAR e-Commerce Website. The proposal due date is 13 June 2018.

An Industry Day has been scheduled for 15 May 2018. Details of the Industry Day have been posted to the SPAWAR e-Commerce Website.





**********************************************************



UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.

The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.





********************************************************

Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.

***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.

The current anticipated FINAL RFP release date for this procurement is 20 March 2018.

An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.

Update #9 ·

Added: Jan 11, 2018 4:32 pm Modified: Jun 01, 2018 4:10 pmTrack Changes UPDATE 01JUN2018: An updated Q&A document has been posted to the e-Commerce website.

Attachments include: - Q and A N00039-18-R-0059 - Afloat - 01JUN2018





***********************************************************************

UPDATE 25MAY2018: RFP Amendment 0002 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0002 - Q and A N00039-18-R-0059 - Afloat - 25MAY2018

***********************************************************************

UPDATE 22MAY2018: RFP Amendment 0001 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0059-0001 - Q and A N00039-18-R-0059 - Afloat - 22MAY2018 - Updated Attachment 6 - Updated Attachment 8 - Afloat Industry Day II - Attendee List - Afloat Industry Day II - PowerPoint Presentation



**********************************************************



UPDATE 27APR2018: Questions received prior to the Close of Business (COB) on 10 May 2018 will be answered at the Industry Day. Answers to questions received after COB on 10 May 2018 and answers provided to questions received at the Industry Day will be posted to the eCommerce website as soon as possible after the Industry Day.



**********************************************************

UPDATE 27APR2018: The FINAL RFP has been posted to the SPAWAR e-Commerce Website. The proposal due date is 13 June 2018.

An Industry Day has been scheduled for 15 May 2018. Details of the Industry Day have been posted to the SPAWAR e-Commerce Website.





**********************************************************



UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.

The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.





********************************************************

Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.

***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.

The current anticipated FINAL RFP release date for this procurement is 20 March 2018.

An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.

Update #8 ·

Added: Jan 11, 2018 4:32 pm Modified: May 29, 2018 6:54 pmTrack Changes

UPDATE 25MAY2018: RFP Amendment 0002 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.


Attachments include:
- N00039-18-R-0059-0002
- Q and A N00039-18-R-0059 - Afloat - 25MAY2018


***********************************************************************


UPDATE 22MAY2018: RFP Amendment 0001 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.


Attachments include:
- N00039-18-R-0059-0001
- Q and A N00039-18-R-0059 - Afloat - 22MAY2018
- Updated Attachment 6
- Updated Attachment 8
- Afloat Industry Day II - Attendee List
- Afloat Industry Day II - PowerPoint Presentation



**********************************************************



UPDATE 27APR2018: Questions received prior to the Close of Business (COB) on 10 May
2018 will be answered at the Industry Day. Answers to questions received after COB on
10 May 2018 and answers provided to questions received at the Industry Day will be posted to the eCommerce website as soon as possible after the Industry Day.



**********************************************************


UPDATE 27APR2018: The FINAL RFP has been posted to the SPAWAR e-Commerce Website. The proposal due date is 13 June 2018.


An Industry Day has been scheduled for 15 May 2018. Details of the Industry Day have been posted to the SPAWAR e-Commerce Website.


 


**********************************************************



UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.


The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.


 


********************************************************


Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.


***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.


The current anticipated FINAL RFP release date for this procurement is 20 March 2018.


An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.


 

Update #7 ·

Added: Jan 11, 2018 4:32 pm Modified: May 29, 2018 6:28 pmTrack Changes

UPDATE 25MAY2018: RFP Amendment 0002 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.


Attachments include:
- N00039-18-R-0060-0002
- Q and A N00039-18-R-0059 - Afloat - 25MAY2018


***********************************************************************


UPDATE 22MAY2018: RFP Amendment 0001 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.


Attachments include:
- N00039-18-R-0060-0001
- Q and A N00039-18-R-0059 - Afloat - 22MAY2018
- Updated Attachment 6
- Updated Attachment 8
- Afloat Industry Day II - Attendee List
- Afloat Industry Day II - PowerPoint Presentation



**********************************************************



UPDATE 27APR2018: Questions received prior to the Close of Business (COB) on 10 May
2018 will be answered at the Industry Day. Answers to questions received after COB on
10 May 2018 and answers provided to questions received at the Industry Day will be posted to the eCommerce website as soon as possible after the Industry Day.



**********************************************************


UPDATE 27APR2018: The FINAL RFP has been posted to the SPAWAR e-Commerce Website. The proposal due date is 13 June 2018.


An Industry Day has been scheduled for 15 May 2018. Details of the Industry Day have been posted to the SPAWAR e-Commerce Website.


 


**********************************************************



UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.


The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.


 


********************************************************


Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.


***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.


The current anticipated FINAL RFP release date for this procurement is 20 March 2018.


An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.


 

Update #6 ·

Added: Jan 11, 2018 4:32 pm Modified: May 22, 2018 5:32 pmTrack Changes UPDATE 22MAY2018: RFP Amendment 0001 has been posted to the e-commerce website. The purpose of this RFP amendment is to provide answers to questions and other amended details.

Attachments include: - N00039-18-R-0060-0001 - Q and A N00039-18-R-0059 - Afloat - 22MAY2018 - Updated Attachment 6 - Updated Attachment 8 - Afloat Industry Day II - Attendee List - Afloat Industry Day II - PowerPoint Presentation



**********************************************************



UPDATE 27APR2018: Questions received prior to the Close of Business (COB) on 10 May 2018 will be answered at the Industry Day. Answers to questions received after COB on 10 May 2018 and answers provided to questions received at the Industry Day will be posted to the eCommerce website as soon as possible after the Industry Day.



**********************************************************

UPDATE 27APR2018: The FINAL RFP has been posted to the SPAWAR e-Commerce Website. The proposal due date is 13 June 2018.

An Industry Day has been scheduled for 15 May 2018. Details of the Industry Day have been posted to the SPAWAR e-Commerce Website.





**********************************************************



UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.

The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.





********************************************************

Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.

***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.

The current anticipated FINAL RFP release date for this procurement is 20 March 2018.

An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.

Update #5 ·

Added: Jan 11, 2018 4:32 pm Modified: Apr 27, 2018 7:03 pmTrack Changes **********************************************************



UPDATE 27APR2018: Questions received prior to the Close of Business (COB) on 10 May 2018 will be answered at the Industry Day. Answers to questions received after COB on 10 May 2018 and answers provided to questions received at the Industry Day will be posted to the eCommerce website as soon as possible after the Industry Day.



**********************************************************

UPDATE 27APR2018: The FINAL RFP has been posted to the SPAWAR e-Commerce Website. The proposal due date is 13 June 2018.

An Industry Day has been scheduled for 15 May 2018. Details of the Industry Day have been posted to the SPAWAR e-Commerce Website.





**********************************************************



UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.

The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.





********************************************************

Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.

***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.

The current anticipated FINAL RFP release date for this procurement is 20 March 2018.

An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.

Update #4 ·

Added: Jan 11, 2018 4:32 pm Modified: Apr 27, 2018 6:43 pmTrack Changes **********************************************************

UPDATE 27APR2018: The FINAL RFP has been posted to the SPAWAR e-Commerce Website. The proposal due date is 13 June 2018.

An Industry Day has been scheduled for 15 May 2018. Details of the Industry Day have been posted to the SPAWAR e-Commerce Website.





**********************************************************



UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.

The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.





********************************************************

Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.

***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.

The current anticipated FINAL RFP release date for this procurement is 20 March 2018.

An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.

Update #3 ·

Added: Jan 11, 2018 4:32 pm Modified: Apr 27, 2018 6:05 pmTrack Changes **********************************************************

UPDATE 27APR2018: The FINAL RFP has been posted to the SPAWAR e-Commerce Website. The proposal due date is 13 June 2018.

An Industry Day has been scheduled for 15 May 2018. Details of the Industry Day have been posted to the SPAWAR e-Commerce Website.





**********************************************************



UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.

The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.





********************************************************

Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.

***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.

The current anticipated FINAL RFP release date for this procurement is 20 March 2018.

An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.

Update #2 ·

Added: Jan 11, 2018 4:32 pm Modified: Feb 15, 2018 11:24 amTrack Changes UPDATE 15 FEB 2018: An update to the Q&A for the DRAFT RFP has been posted to the SPAWAR e-Commerce Website.

The anticipated date for release of the FINAL RFP is still 20 MARCH 2018, and Industry Day is anticipated to occur 3 weeks after release of the FINAL RFP.





********************************************************

Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.

***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.

The current anticipated FINAL RFP release date for this procurement is 20 March 2018.

An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.

Update #1 ·

Added: Jan 11, 2018 4:32 pm Update 11 JAN 2018: An update to the Q&A for the DRAFT RFP has been posted on the SPAWAR E-Commerce Website.

***IMPORTANT NOTE***: The solicitation number for this requirement has been changed from N00039-17-R-0003 to N00039-18-R-0059. All future updates and postings will be under N00039-18-R-0059.

The current anticipated FINAL RFP release date for this procurement is 20 March 2018.

An Industry Day in San Diego, CA is anticipated to be held three (3) weeks after the release of the FINAL RFP. Additional details pertaining to the date, time and location of the Industry Day will be included with the FINAL RFP when released.

Attachments

Files attached to this notice, newest first
File Type Posted
Q and A - N00039-18-R-0059 - Afloat - 6 JUN 2018.pdf PDF
N00039-18-R-0059_Conformed Copy through Amendment 0004.pdf PDF
Q and A - N00039-18-R-0059 - Afloat - 25 MAY 2018.pdf PDF
Q and A - N00039-18-R-0059 - Afloat - 01 JUN 2018.pdf PDF
N00039-18-R-0059-0002.pdf PDF
Q and A - N00039-18-R-0059 - Afloat - 25 JUN 2018.pdf PDF
Q and A - N00039-18-R-0059 - Afloat - 8 JUN 2018.pdf PDF
N00039-18-R-0059-0003.pdf PDF
Q and A - N00039-18-R-0059 - Afloat - 19 JUN 2018.pdf PDF
N00039-18-R-0059-0005.pdf PDF
Q and A - N00039-18-R-0059 - Afloat - 25 JUN 2018.pdf PDF
N00039-18-R-0059_Conformed copy through Amendment 0005.pdf PDF
N00039-18-R-0059_Conformed Copy through Amendment 0004.pdf PDF
N00039-18-R-0059-0004.pdf PDF
SE3 - Attachment 12 - Gate Review Matrix (12JUN2018).xlsx XLSX spreadsheet
N00039-18-R-0059_CONFORMED_RFP through Amendment 0003.pdf PDF
N00039-18-R-0059-0003.pdf PDF
Q and A - N00039-18-R-0059 - Afloat - 6 JUN 2018.pdf PDF
Q and A - N00039-18-R-0059 - Afloat - 22 MAY 2018.pdf PDF
Q and A - N00039-18-R-0059 - Afloat - 25 MAY 2018.pdf PDF
Afloat Industry Day II - PowerPoint Presentation.pdf PDF
SE3 - Attachment 8 - Small Business Participation Data (22MAY2018).xlsx XLSX spreadsheet
N00039-18-R-0059-0001.pdf PDF
N00039-18-R-0059-0002.pdf PDF
SE3 - Attachment 1A - Incentive Plan (16OCT2017).pdf PDF
SE3 - Attachment 10 - Proposal Checklist.pdf PDF
N00039-18-R-0059-0001.pdf PDF
SE3 - Attachment 13 - Price Risk Math Model.pdf PDF
Afloat Industry Day II - PowerPoint Presentation.pdf PDF
SE3 - Attachment 1B - Final Fee or Profit Determination Formula (06NOV2017).xlsx XLSX spreadsheet
SE3 - Attachment 11 - Proposal Ratings Guide.pdf PDF
AFLOAT INDUSTRY DAY II - Attendee list.pdf PDF
SE3 - Attachment 5 - Quality Assurance Surveillance Plan (QASP) (26APR2018).pdf PDF
SE3 - Exhibit A - DD 1423 CDRLs (12APR2018).pdf PDF
SE3 - Attachment 2 - Personnel Qualifications (06NOV2017).pdf PDF
Industry_Day_2_Information.pdf PDF
Q and A - N00039-18-R-0059 - Afloat - 22 MAY 2018.pdf PDF
SE3 - Attachment 7 - Reference Information Sheet (RIS).docx DOCX document
SE3 - Attachment 4 - DD 254 (24MAY2017).pdf PDF
SE3 - Attachment 1A - Incentive Plan (16OCT2017).pdf PDF
SE3 - Attachment 8 - Small Business Participation Data (22FEB2018).xlsx XLSX spreadsheet
SE3 - Attachment 10 - Proposal Checklist.pdf PDF
SE3 - Attachment 12 - Gate Review Matrix.xlsx XLSX spreadsheet
SE3 - Attachment 2 - Personnel Qualifications (06NOV2017).pdf PDF
SE3 - Attachment 6 - Ceiling Distribution Proposal (22FEB2018).xlsx XLSX spreadsheet
N00039-18-R-0059.pdf PDF
SE3 - Attachment 11 - Proposal Ratings Guide.pdf PDF
SE3 - Attachment 7 - Reference Information Sheet (RIS).docx DOCX document
SE3 - Attachment 9 - Past Performance Questionnaire.docx DOCX document
SE3 - Attachment 13 - Price Risk Math Model.pdf PDF
Show all 50

This notice has more attachments on GovTribe.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Spawar afloat global C4ISR installations contract Award Award Notice
Spawar afloat global C4ISR installations contract This notice · Latest pre-solicitation Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity