Sources Sought- Repair B6413 Second Floor Secure Space, Barksdale AFB, Louisiana.
Cancelled Special Notice Posted
- Agency
-
ENDIST Fort Worth
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Y1AA Construction Of Office Buildings
- Place of performance
- Barksdale AFB, Louisiana 71110, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Fort Worth District, issued a sources-sought notice on September 8, 2026, for market research on a progressive design-build (PDB) project to repair and expand Building 6413 Second Floor Secure Space at Barksdale Air Force Base, Louisiana, with responses due by September 30, 2026 at 10:00 A.M. Central Daylight Time. This procurement will be conducted under Other Transaction Authority (OTA) pursuant to 10 U.S.C. 2808a; FAR does not apply, and award will be governed by a negotiated bilateral Other Transaction Agreement rather than traditional contract terms.
The project scope encompasses construction and build-out of a second-floor expansion within the B6413 Hangar utilizing existing structural floor plates, elevators, stairwells, and utility stub-ups from the initial first-floor SCIF/SAP-F conversion. Work includes interior demolition, office and conference room configurations, network extension (NIPR, SIPR, JWICS, and SAP to the second floor), and access control and audio/visual system integration. All design and construction must comply with ICD/ICS 705 standards for physical and technical security accreditation, including Sound Transmission Class-rated walls and doors with post-construction sound testing.
The Target Price Range for construction is $6,146,595.02 to $6,385,000.00 within a total Programmed Amount of $13,500,000.00. The Government targets formal award of Phase 1 (Design and Preconstruction Services) in the Second or Third Quarter of Fiscal Year 2027, with approximately 1,000 calendar days for Phase 2 Construction performance.
Interested firms must submit a capability statement addressing secure facility construction experience and progressive design-build mechanics, and complete the Project Delivery & Acquisition Strategy Questionnaire. Technical questions are due by September 22, 2026 at 10:00 A.M. CDT. A virtual Industry Day will be published on SAM.gov.
Notice text
Sources Sought - Market Research ONLY
SCOPE: Repair B6413 Second Floor Secure Space – This project is to construct and build out a second-floor expansion within B6413 Hangar, Barksdale AFB, Louisiana. Utilizing the structural floor plate, elevator, stairwells, and utility stub-ups planned in the initial 14,000 sq. ft. first-floor SCIF/SAP-F conversion, this second-phase project will fully build out the upper level. The scope involves the demolition of any remaining interior overhead obstructions (such as the upper portion of the existing CMU storage room) to clear the hangar volume.
Target Price Range (TPR): Target Price Range (TPR): Target Price Range (TPR): The Government has established a Target Price Range (TPR) for construction between $6,146,595.02 (the estimated Construction Budget) and $6,385,000.00 (the strict CCL / CWE limit), within a total Programmed Amount (PA) of $13,500,000.00.
Please refer to Attachment 01 for more project information.
Project Delivery & Acquisition Strategy Questionnaire must be filled out completely and submitted with your package reference Attachment 02 .
Files
| File | Type | Posted |
|---|---|---|
| Attachment 01- B6413 Second Floor Secure Space Barksdale.pdf | ||
| Attachment 02 -Industy Questionnare.docx | DOCX document |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity