About this opportunity

The Department of the Air Force Materiel Command Test Center at Eglin Air Force Base is seeking sources for a design-build project to replace Air Handling Units (AHUs) and piping in a data center. The project involves comprehensive mechanical, electrical, structural, and plumbing work, requiring contractors to provide all necessary services, equipment, tools, materials, labor, supervision, and architectural/engineering services. Contractors must demonstrate capability to remove and replace seven CRAC units and associated hydronic piping systems while maintaining continuous data center operations. The sources sought notice is open from January 27, 2025, to February 13, 2025, with interested parties required to contact SrA Thomas Azevedo at thomas.azevedo.1@us.af.mil to express interest. Evaluation criteria will likely focus on technical capabilities, experience with complex data center infrastructure projects, and ability to execute work with minimal operational disruption.

The procurement is not designated for any specific set-aside category and falls under NAICS code 238220 for Plumbing, Heating, and Air-Conditioning Contractors. The project has a defined performance period of 270 calendar days, covering both design and construction phases. Contractors will need to provide comprehensive documentation at multiple design stages (35%, 65%, 95%, and final) and demonstrate compliance with federal, state, and local building codes. The scope requires complex technical capabilities, including mechanical/electrical load calculations, phased installation strategies, and comprehensive system testing and commissioning. While specific award value is not disclosed, the project's complexity and technical requirements suggest it will be a significant procurement targeting specialized contractors with advanced mechanical and data center infrastructure expertise.

Notice text

Eglin Air Force Base is seeking sources for a design-build project to replace Air Handling Units (AHUs) and piping. The project involves the removal and replacement of hydronic piping and Computer Room Air Conditioner (CRAC) units in a data center.

Scope of Work:

  • Design and build removal and replacement of hydronic piping and CRAC units
  • Provide all necessary services, equipment, tools, materials, labor, supervision, transportation, and architectural/engineering services
  • Perform mechanical, electrical, structural, and plumbing work as required

Period of Performance: 270 calendar days

Point of Contact:

If you have any questions or would like to express interest in this project, please contact: SrA Thomas Azevedo thomas.azevedo.1@us.af.mil

Files

File Type Posted
SOW_Redacted.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
HVAC Repair Eglin AFB, Florida 32542, United States Air Force Test Center No set-aside
Remove and repair two high velocity air handling units NAICS 238220 ACC Warren Total Small Business
TAN AHU Replacement Idaho 83415, United States Department of Energy No set-aside
High Temp Hot Water Distribution System and Heat Plant Suite of Repairs to the US Air Force Academy COLORADO US Air Force Academy Colorado Springs CO · NAICS 236220 ENDIST Omaha No set-aside
Service Air System Revitalization Arnold AFB, Tennessee 37389, United States · NAICS 333912 Air Force Test Center No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors