Notice text
COMBINED SYNOPSIS/SOLICITATION W912EQ-22-Q-0001
Shrink Wrap Roof Repair
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 – Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a separate written solicitation document will not be issued. This solicitation is being issued under the authority of FAR Part 13 Simplified Acquisition Procedures.
The solicitation number is W912EQ-22-Q-0001 and is being issued as a Request for Quotations (RFQ). This procurement is a 100% Small Business Set-Aside and only qualified offerors may submit a quote. The associated North American Industrial Classification System (NAICS) code for this procurement is 238160 with a small business size standard of $16.5M. It is the offeror’s responsibility to ensure receipt of quotes by the time and date stated herein.
Please see the attached Scope of Work for a more detailed description.
Magnitude of Work: Between $100,000 and $200,000
Contract Duration: Ten (10) Calendar Days
Response to this combined synopsis/solicitation must be received electronically by, 14 Oct 2021,no later than 11:00 AM (CST). Quotes subject matter should be marked with solicitation number W912EQ-22-Q-0001 andemailed to priscilla.g.sweeney@usace.army.mil, Phone (901)544-3117, email: gloria.claybon@usace.armymil Phone (901) 544-0787. System for Award Management Registration (SAM) database prior to award will not be eligible for award. Vendors may register for SAM by registering online at www.sam.gov or by calling 1-866-606-8220.
In accordance with FAR 52.204-7, all vendors shall be registered in SAM prior to bid. Vendors must also be registered in Representations and Certifications Applications (included in SAM). Websites: www.sam.gov. North American Industry Classification System (NAICS) Code applicable (238160 listed above) to this acquisition must be in vendor's SAM registration. Note: Update SAM profile to include all applicable NAICS Codes associated with your company.
Evaluation Criteria and Basis for Award:
The Government intends to award a firm fixed price contract resulting from this solicitation to the responsible offeror(s) whose quotation, conforming to the solicitation, is the lowest price, technically acceptable quotation.
Technically acceptable means that the Contractor provides a quotation that meets or exceeds the requirements within the Scope of Work.
Price will be evaluated for all offerors whose quotations are determined technically acceptable. Price will be evaluated to determine that total price is a fair and reasonable overall price to the Government.
The following documentation must be submitted with your quote for evaluation.
1. Bid schedule of prices.
2. Provide two examples of projects similar in nature to the work identified in the scope of work above your firm has performed in the past three years. Each example should include a detailed project description, location, the dollar value or the project, the beginning and end date of the project.
3. For the relevant example project requested in item 2, indicated whether your firm was the prime or sub-contractor. If the prime, indicated what percentage of work you performed. If the firm was subcontractor, identify your role in the contract and explain the relevancy of the role. Also, provide copies of performance rating for the project submitted and resume of key personnel.
The following clauses and provisions are incorporated and will remain in full force in any resultant award. The full text of these clauses can be accessed electronically at website: http://www.farsite.hill.af.mil.
FAR 52.202-1 Definitions
FAR 52.203-3 Gratuities
FAR 52.203-5 Covenant Against Contingent Fees
FAR 52.203-6 Restrictions on Subcontractor Sales to The Government
FAR 52.203-7 Anti-Kickback Procedures
FAR 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
FAR 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity
FAR 52.203-12 Limitation on Payments to Influence Certain Federal Transactions
FAR 52.203-13 Contractor Code of Business Ethics and Conduct
FAR 52.203-17 Contractor Employee Whistleblower Rights and Requirement, To Inform Employees of Whistleblower Rights
FAR 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
FAR 52.204-9 Personal Identity Verification of Contractor Personnel
FAR 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
FAR 52.204-12 Unique Entity Identifier Maintenance
FAR 52.204-13 System for Award Management Maintenance
FAR 52.204-16 Commercial and Government Entity Code Reporting FAR 52.204-18 Commercial and Government Entity Code Maintenance
FAR 52.204-19 Incorporation by Reference of Representations and Certifications
FAR 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
FAR 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
FAR 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
FAR 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations
FAR 52.210-1 Market Research
FAR 52.211-13 Time Extensions
FAR 52.211-18 Variation in Estimated Quantity
FAR 52.212-1 Instructions to Offerors—Commercial Items FAR 52.212-2 Evaluation – Commercial Items
FAR 52.212-3 Offeror Representation and Certifications--Commercial Items (See Attachment) FAR 52.212-4 Contract Terms and Conditions—Commercial Items
FAR 52.212-5 Contract Terms and Conditions Required to Implement Statues or Executive Orders—Commercial Items
FAR 52.219-8 Utilization of Small Business Concerns
FAR 52.219-14 (Dev) Limitations on Subcontracting (DEVIATION 2019-O0003)
FAR 52.222-1 Notice to The Government of Labor Disputes
FAR 52.222-3 Convict Labor
FAR 52.222-4 Contract Work Hours and Safety Standards – Overtime Compensation
FAR 52.222-6 Construction Wage Rate Requirements
FAR 52.222-7 Withholding of Funds
FAR 52.222-8 Payrolls and Basic Records
FAR 52.222-9 Apprentices and Trainees
FAR 52.222-10 Compliance with Copeland Act Requirements
FAR 52.222-11 Subcontracts (Labor Standards)
FAR 52.222-12 Contract Termination-Debarment
FAR 52.222-13 Compliance with Construction Wage Rate Requirements and
Related Regulations
FAR 52.222-14 Disputes Concerning Labor Standards
FAR 52.222-15 Certification of Eligibility
FAR 52.222-21 Prohibition Of Segregated Facilities
FAR 52.222-26 Equal Opportunity
FAR 52.222-27 Affirmative Action Compliance Requirements for Construction
FAR 52.222-35 Equal Opportunity for Veterans
FAR 52.222-36 Equal Opportunity for Workers with Disabilities
FAR 52.222-37 Employment Reports on Veterans
FAR 52.222-40 Notification of Employee Rights Under the National Labor Relations Act
FAR 52.222-50 Combating Trafficking in Persons
FAR 52.222-54 Employment Eligibility Verification
FAR 52.223-6 Drug-Free Workplace
FAR 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving
FAR 52.225-13 Restrictions on Certain Foreign Purchases
FAR 52.227-1 Authorization and Consent
FAR 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement
FAR 52.228-11 Pledges of Assets
FAR 52.228-12 Prospective Subcontractor Requests for Bonds
FAR 52.228-15 Performance and Payment Bonds—Construction
FAR 52.227-4 Patent Indemnity-Construction Contracts
FAR 52.228-2 Additional Bond Security
FAR 52.229-3 Federal, State and Local Taxes
FAR 52.232-5 Payments under Fixed-Price Construction Contracts
FAR 52.232-17 Interest
FAR 52.232-23 Assignment of Claims
FAR 52.232-23 Alt I Assignment of Claims (May 2014) - Alternate I
FAR 52.232-27 Prompt Payment for Construction Contracts
FAR 52.232-33 Payment by Electronic Funds Transfer--System for Award Management
FAR 52.232-39 Unenforceability of Unauthorized Obligations
FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors
FAR 52.233-1 Disputes
FAR 52.233-1 Alt I Disputes (May 2014) - Alternate I
FAR 52.233-3 Protest After Award
FAR 52.233-4 Applicable Law for Breach of Contract Claim
FAR 52.236-2 Differing Site Conditions
FAR 52.236-3 Site Investigation and Conditions Affecting the Work
FAR 52.236-5 Material and Workmanship
FAR 52.236-6 Superintendence by the Contractor
FAR 52.236-7 Permits and Responsibilities
FAR 52.236-8 Other Contracts
FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
FAR 52.236-10 Operations and Storage Areas
FAR 52.236-11 Use and Possession Prior to Completion
FAR 52.236-12 Cleaning Up
FAR 52.236-13 Accident Prevention
FAR 52.236-13 Alt I Accident Prevention (Nov 1991) - Alternate I
FAR 52.236-15 Schedules for Construction Contracts
FAR 52.236-17 Layout of Work
FAR 52.236-21 Specifications and Drawings for Construction
FAR 52.236-26 Preconstruction Conference
FAR 52.242-5 Payments to Small Business Subcontractors
FAR 52.242-13 Bankruptcy
FAR 52.242-14 Suspension of Work
FAR 52.243-4 Changes
FAR 52.245-1 Government Property
FAR 52.245-9 Use and Charges
FAR 52.246-12 Inspection of Construction
FAR 52.246-21 Warranty of Construction
FAR 52.249-2 Termination For Convenience Of The Government (Fixed-Price)
FAR 52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price) - Alternate I
FAR 52.249-10 Default (Fixed-Price Construction)
FAR 52.249-10 Alt II Default (Fixed-Price Construction) Alternate II
FAR 52.253-1 Computer Generated Forms
The following DFARS Clauses and provisions are incorporated and will remain in full force in any resultant award. The full text of these clauses and provisions can be accessed electronically at website, http://www.farsite.hill.af.mil
DFARS 252.201-7000 Contracting Officer's Representative
DFARS 252.203-7000 Requirements Relating to Compensation of Former DoD Officials
DFARS 252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies
DFARS 252.203-7002 Requirement to Inform Employees of Whistleblower Rights DFARS 252.203-7003 Agency Office of the Inspector General
DFARS 252.203-7004 Display of Hotline Posters
DFARS 252.203-7005 Representation Relating to Compensation of Former DoD Officials
DFARS 252.204-7000 Disclosure of Information
DFARS 252.204-7003 Control of Government Personnel Work Product
DFARS 252.204-7004 System for Award Management, Alternate A
DFARS 252.204-7007 Alternate A, Annual Representations and Certifications
DFARS 252.204-7008 Compliance with Safeguarding Covered Defense Information Controls DFARS 252.204-7011 Alternative Line-Item Structure
DFARS 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting DFARS 252.204-7015 Disclosure of Information to Litigation Support Contractors
DFARS 252.204-7018 Prohibition on the Acquisition of Covered Defense
Telecommunications Equipment or Services
DFARS 252.209-7004 Subcontracting with Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
DFARS 252.211-7003 Identification and Valuation
DFARS 252.211-7007 Reporting of Government-Furnished Property
DFARS 252.213-7000 Notice to Prospective Suppliers on Use of Past Performance Information Retrieval System – Statistical Reporting in Past Performance Evaluations.
DFARS 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements
DFARS 252.223-7004 Drug Free Work Force
DFARS 252.223-7008 Prohibition of Hexavalent Chromium
DFARS 252.225-7001 Buy American and Balance of Payments Program DFARS 252.225-7002 Qualifying Country Sources as Subcontractors
DFARS 252.225-7012 Preference for Certain Domestic Commodities
DFARS 252.226-7001 Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business Concerns
DFARS 252.225-7048 Export-Controlled Items
DFARS 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
DFARS 252.232-7005 Reimbursement of Subcontractor Advance Payments—DOD Pilot Mentor--Protege Program
DFARS 252.232-7010 Levies on Contract Payments
DFARS 252.236-7000 Modification Proposals-Price Breakdown
DFARS 252.236-7008 Contract Prices-Bidding Schedules
DFARS 252.243-7001 Pricing of Contract Modifications
DFARS 252.243-7002 Requests for Equitable Adjustment
DFARS 252.244-7000 Subcontracts for Commercial Items
DFARS 252.245-7003 Contractor Property Management System Administration
DFARS 252.245-7004 Reporting, Reutilization, and Disposal
DFARS 252.247-7023 Transportation of Supplies by Sea
The following are applicable from 52.212-5:
FAR 52.219-6 Notice of Total Small Business Set-Aside
FAR 52.219-28 Post Award Small Business Program Representation FAR 52.219-13 Notice of Set-Aside of Orders
FAR 52.222-3 Convict Labor
FAR 52.222-19 Child Labor—Cooperation with Authorities and Remedies FAR 52.222-21 Prohibition of Segregated Facilities
FAR 52.222-26 Equal Opportunity
FAR 52.222-36 Equal Opportunity for Workers with Disabilities FAR 52.222-50, Combating Trafficking in Persons
FAR 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving
FAR 52.225-13 Restrictions on Certain Foreign Purchases
FAR 52.225-18 Place of Manufacture
FAR 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (SAM)
FAR 52.223-5 Pollution Prevention and Right-to-Know Information FAR 52.223-15 Energy Efficiency in Energy Consuming Products FAR 52.232-39 Unenforceability of Unauthorized Obligations
FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors FAR 52.246-1 Contractor Inspection Requirements
FAR 52.252-2 Clauses to Incorporate by Reference
CLAUSES INCORPORATED BY FULL TEXT
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within one (1) day of the expiration of the base period of performance; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least one (1) day before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 30 days from the contract award date.
(End of clause.)
52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. As used in this clause--
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products. Component means an article, material, or supply incorporated directly into a construction material. Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if--
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item. Foreign construction material means a construction material other than a domestic construction material. United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
NONE.
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
----------------------------------------------------------------------------------------------------------------
Construction material description Unit of measure Quantity Price (dollars) \1\
----------------------------------------------------------------------------------------------------------------
Item 1
Foreign construction material.... ........... ___ ........ ....... ………. ___ ................ ........ ___ ...............
Domestic construction material... ........ ___ ............... .............. ___ .................. ...... ___ .................
Item 2
Foreign construction material.... ......... ___ ............. ........ ……. ___ ............... ......... ___ ..............
Domestic construction material... ....... ___ .................. ............. ___ ................. ....... ___ ................
----------------------------------------------------------------------------------------------------------------
Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include other applicable supporting information.
(End of clause.)
52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (OCT 2019)
(a) Definitions. As used in this clause--
Caribbean Basin country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products. Component means an article, material, or supply incorporated directly into a construction material. Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material. Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material. Designated country means any of the following countries:
(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);
(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);
(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or
(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago). Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if--
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material. Least developed country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
“Free Trade Agreement country construction material” means a construction material that—
(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.
“Least developed country construction material” means a construction material that—
(1) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
United States means the 50 States, the District of Columbia, and outlying areas.
WTO GPA country construction material means a construction material that—
(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.
(b) Construction materials.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements (FTAs) apply to this acquisition. Therefore, the Buy American restrictions are waived for designated country construction materials.
(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.
(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
[Contracting Officer to list applicable excepted materials or indicate ``none'']
(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
----------------------------------------------------------------------------------------------------------------
Construction material description Unit of measure Quantity Price (dollars) \1\
----------------------------------------------------------------------------------------------------------------
Item 1:
Foreign construction material.... ....................... ....................... .......................
Domestic construction material... ....................... ....................... .......................
Item 2:
Foreign construction material.... ....................... ....................... .......................
Domestic construction material... ....................... ....................... .......................
----------------------------------------------------------------------------------------------------------------
\1\ Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free
entry certificate is issued). List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include other applicable supporting information.
(End of clause.)
52.225-11 BUY AMERICAN ACT --CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (OCT 2019) ALTERNATE I (MAY 2014)
(a) Definitions. As used in this clause--
Australian, Chilean, or Moroccan construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of Australia, Chile, or Morocco; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in Australia, Chile, or Morocco into a new and different construction material distinct from the materials from which it was transformed.
Bahrainian, Mexican, or Omani construction material means a construction material that—
(1) Is wholly the growth, product, or manufacture of Bahrain, Mexico; or Oman
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in Bahrain, Mexico, or Oman into a new and different construction material distinct from the materials from which it was transformed.
Caribbean Basin country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Designated country means any of the following countries:
(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);
(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);
(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or
(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States; or
(2) A construction material manufactured in the United States, if the cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Foreign construction material means a construction material other than a domestic construction material. Least developed country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
“Free Trade Agreement country construction material” means a construction material that—
(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.
“Least developed country construction material” means a construction material that—
(1) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
United States means the 50 States, the District of Columbia, and outlying areas.
WTO GPA country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.
(b) Construction materials.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). In addition, the Contracting Officer has determined that the WTO GPA and all the Free Trade Agreements except the Bahrain FTA, NAFTA, and the Oman FTA apply to the this acquisition. Therefore, the Buy American statute restrictions are waived for designated country construction materials other than Bahrainian, Mexican, or Omani construction materials.
(2) The Contractor shall use only domestic or designated country construction material other than Bahrainian, Mexican, or Omani construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.
(3) The requirement in paragraph (b)(2) of this clause does not apply to the construction materials or components listed by the Government as follows: (Contracting Officer to list applicable excepted materials or indicate ``none'')
(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that--
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the
contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
----------------------------------------------------------------------------------------------------------------
Construction material description Unit of measure Quantity Price (dollars) \1\
----------------------------------------------------------------------------------------------------------------
Item 1:
Foreign construction material.... ....................... ....................... .......................
Domestic construction material... ....................... ....................... .......................
Item 2:
Foreign construction material.... ....................... ....................... .......................
Domestic construction material... ....................... ....................... .......................
----------------------------------------------------------------------------------------------------------------
\1\ Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include other applicable supporting information.
(End of clause)
52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)
(a) “Irrevocable letter of credit” (ILC), as used in this clause, means a written commitment by a federally insured financial institution to pay all or part of a stated amount of money, until the expiration date of the letter, upon presentation by the Government (the beneficiary) of a written demand therefor. Neither the financial institution nor the offeror/Contractor can revoke or condition the letter of credit.
(b) If the offeror intends to use an ILC in lieu of a bid bond, or to secure other types of bonds such as performance and payment bonds, the letter of credit and letter of confirmation formats in paragraphs (e) and (f) of this clause
shall be used.
(c) The letter of credit shall be irrevocable, shall require presentation of no document other than a written demand and the ILC (including confirming letter, if any), shall be issued/confirmed by an acceptable federally insured financial institution as provided in paragraph (d) of this clause, and--
(1) If used as a bid guarantee, the ILC shall expire no earlier than 60 days after the close of the bid acceptance period;
(2) If used as an alternative to corporate or individual sureties as security for a performance or payment bond, the offeror/Contractor may submit an ILC with an initial expiration date estimated to cover the entire period for which
financial security is required or may submit an ILC with an initial expiration date that is a minimum period of one year from the date of issuance. The ILC shall provide that, unless the issuer provides the beneficiary written notice of non-renewal at least 60 days in advance of the current expiration date, the ILC is automatically extended without amendment for one year from the expiration date, or any future expiration date, until the period of required coverage
is completed and the Contracting Officer provides the financial institution with a written statement waiving the right to payment. The period of required coverage shall be:
(i) For contracts subject to 40 U.S.C. chapter 31, subchapter III, Bonds, the later of--
(A) One year following the expected date of final payment;
(B) For performance bonds only, until completion of any warranty period; or
(C) For payment bonds only, until resolution of all claims filed against the payment bond during the one-year period following final payment.
(ii) For contracts not subject to the Miller Act, the later of--
(A) 90 days following final payment; or
(B) For performance bonds only, until completion of any warranty period.
(d)(1) Only federally insured financial institutions rated investment grade by a commercial rating service shall issue or confirm the ILC.
(2) Unless the financial institution issuing the ILC had letter of credit business of at least $25 million in the past year, ILCs over $5 million must be confirmed by another acceptable financial institution that had letter of credit business of at least $25 million in the past year.
(3) The Offeror/Contractor shall provide the Contracting Officer a credit rating that indicates the financial institutions have the required credit rating as of the date of issuance of the ILC.
(4) The current rating for a financial institution is available through any of the following rating services registered with the U.S. Securities and Exchange Commission (SEC) as a Nationally Recognized Statistical Rating Organization (NRSRO). NRSRO's can be located at the Web site http://www.sec.gov/answers/nrsro.htm maintained by the SEC.
(e) The following format shall be used by the issuing financial institution to create an ILC:
___
[Issuing Financial Institution's Letterhead or Name and Address]
Issue Date _ ___
IRREVOCABLE LETTER OF CREDIT NO. ___
Account party's name ___ _
Account party's address ___ _
For Solicitation No. ___ _(for reference only)
TO: [ ___ U.S. Government agency]
[ ___ U.S. Government agency's address]
1. We hereby establish this irrevocable and transferable Letter of Credit in your favor for one or more drawings up
to United States $ ___ . This Letter of Credit is payable at [issuing financial institution's and, if any, confirming
financial institution's] office at [ ___ issuing financial institution's address and, if any, confirming financial
institution's address] and expires with our close of business on ___ , or any automatically extended expiration date.
2. We hereby undertake to honor your or the transferee's sight draft(s) drawn on the issuing or, if any, the confirming financial institution, for all or any part of this credit if presented with this Letter of Credit and confirmation, if any, at the office specified in paragraph 1 of this Letter of Credit on or before the expiration date or any automatically extended expiration date.
3. [This paragraph is omitted if used as a bid guarantee, and subsequent paragraphs are renumbered.] It is a condition of this Letter of Credit that it is deemed to be automatically extended without amendment for one year from the expiration date hereof, or any future expiration date, unless at least 60 days prior to any expiration date, we notify you or the transferee by registered mail, or other receipted means of delivery, that we elect not to consider this Letter of Credit renewed for any such additional period. At the time we notify you, we also agree to notify the account party (and confirming financial institution, if any) by the same means of delivery.
4. This Letter of Credit is transferable. Transfers and assignments of proceeds are to be affected without charge to either the beneficiary or the transferee/assignee of proceeds. Such transfer or assignment shall be only at the written direction of the Government (the beneficiary) in a form satisfactory to the issuing financial institution and the confirming financial institution, if any.
5. This Letter of Credit is subject to the Uniform Customs and Practice (UCP) for Documentary Credits, International Chamber of Commerce Publication No. ___ -- (Insert version in effect at the time of ILC issuance, e.g., ``Publication 600, 2006 edition'') and to the extent not inconsistent therewith, to the laws of
___ --[State of confirming financial institution, if any, otherwise State of issuing financial institution].
6. If this credit expires during an interruption of business of this financial institution as described in Article 17 of the
UCP, the financial institution specifically agrees to effect payment if this credit is drawn against within 30 days after the resumption of our business.
Sincerely,
___
[ ___ Issuing financial institution]
(f) The following format shall be used by the financial institution to confirm an ILC:
___ [Confirming Financial Institution's Letterhead or Name and Address]
(Date) ___
Our Letter of Credit Advice Number ___
Beneficiary: ___ [U.S. Government agency]
Issuing Financial Institution: ___
Issuing Financial Institution's LC No.: __
Gentlemen:
1. We hereby confirm the above indicated Letter of Credit, the original of which is attached, issued by ___ [name of issuing financial institution] for drawings of up to United States dollars ___ _/U.S. $ ___ and expiring with our close of business on ___ [the expiration date], or any automatically extended expiration date.
2. Draft(s) drawn under the Letter of Credit and this Confirmation are payable at our office located at ___ _.
3. We hereby undertake to honor sight draft(s) drawn under and presented with the Letter of Credit and this Confirmation at our offices as specified herein.
4. [This paragraph is omitted if used as a bid guarantee, and subsequent paragraphs are renumbered.] It is a condition of this confirmation that it be deemed automatically extended without amendment for one year from the expiration date hereof, or any automatically extended expiration date, unless:
(a) At least 60 days prior to any such expiration date, we shall notify the Contracting Officer, or the transferee and the issuing financial institution, by registered mail or other receipted means of delivery, that we elect not to consider this confirmation extended for any such additional period; or
(b) The issuing financial institution shall have exercised its right to notify you or the transferee, the account party, and ourselves, of its election not to extend the expiration date of the Letter of Credit.
5. This confirmation is subject to the Uniform Customs and Practice (UCP) for Documentary Credits, International Chamber of Commerce Publication No. ___ -- (Insert version in effect at the time of ILC issuance, e.g.,
``Publication 600, 2006 edition'') and to the extent not inconsistent therewith, to the laws of ___ --[State of
confirming financial institution].
6. If this confirmation expires during an interruption of business of this financial institution as described in Article
17 of the UCP, we specifically agree to effect payment if this credit is drawn against within 30 days after the
resumption of our business.
Sincerely,
___
[Confirming financial institution]
(g) The following format shall be used by the Contracting Officer for a sight draft to draw on the Letter of Credit:
SIGHT DRAFT
___
[City, State]
(Date) ___
[Name and address of financial institution]
Pay to the order of ___ [Beneficiary Agency] ___ the sum of United States ___ This draft is drawn under
Irrevocable Letter of Credit No. ___
___ [Beneficiary Agency]
By: ___
(End of clause.)
52.244-2 SUBCONTRACTS (JUN 2020)
(a) Definitions. As used in this clause--
Approved purchasing system means a Contractor's purchasing system that has been reviewed and approved in accordance with Part 44 of the Federal Acquisition Regulation (FAR). Consent to subcontract means the Contracting Officer's written consent for the Contractor to enter into a particular subcontract. Subcontract means any contract, as defined in FAR Subpart 2.1, entered into by a subcontractor to furnish supplies or services for performance of the prime contract or a subcontract. It includes, but is not limited to, purchase orders, and changes and modifications to purchase orders.
(b) When this clause is included in a fixed-price type contract, consent to subcontract is required only on unpriced contract actions (including unpriced modifications or unpriced delivery orders), and only if required in accordance with paragraph (c) or (d) of this clause.
(c) If the Contractor does not have an approved purchasing system, consent to subcontract is required for any subcontract that—
(1) Is of the cost-reimbursement, time-and-materials, or labor-hour type; or
(2) Is fixed-price and exceeds—
(i) For a contract awarded by the Department of Defense, the Coast Guard, or the National Aeronautics and Space Administration, the greater of the simplified acquisition threshold, as defined in FAR 2.101 on the date of subcontract award, or 5 percent of the total estimated cost of the contract; or
(ii) For a contract awarded by a civilian agency other than the Coast Guard and the National Aeronautics and Space Administration, either the simplified acquisition threshold, as defined in FAR 2.101 on the date of subcontract award, or 5 percent of the total estimated cost of the contract.
(d) If the Contractor has an approved purchasing system, the Contractor nevertheless shall obtain the Contracting Officer’s written consent before placing the following subcontracts:
(e)(1) The Contractor shall notify the Contracting Officer reasonably in advance of placing any subcontract or modification thereof for which consent is required under paragraph (b), (c), or (d) of this clause, including the following information:
(i) A description of the supplies or services to be subcontracted.
(ii) Identification of the type of subcontract to be used.
(iii) Identification of the proposed subcontractor.
(iv) The proposed subcontract price.
(v) The subcontractor’s current, complete, and accurate certified cost or pricing data and Certificate of Current Cost or Pricing Data, if required by other contract provisions.
(vi) The subcontractor’s Disclosure Statement or Certificate relating to Cost Accounting Standards when such data are required by other provisions of this contract.
(vii) A negotiation memorandum reflecting—
(A) The principal elements of the subcontract price negotiations;
(B) The most significant considerations controlling establishment of initial or revised prices;
(C) The reason certified cost or pricing data were or were not required;
(D) The extent, if any, to which the Contractor did not rely on the subcontractor’s certified cost or pricing data in determining the price objective and in negotiating the final price;
(E) The extent to which it was recognized in the negotiation that the subcontractor’s certified cost or pricing data were not accurate, complete, or current; the action taken by the Contractor and the subcontractor; and the effect of any such defective data on the total price negotiated;
(F) The reasons for any significant difference between the Contractor’s price objective and the price negotiated; and
(G) A complete explanation of the incentive fee or profit plan when incentives are used. The explanation shall identify each critical performance element, management decisions used to quantify each incentive element, reasons for the incentives, and a summary of all trade-off possibilities considered.
(2) The Contractor is not required to notify the Contracting Officer in advance of entering into any subcontract for which consent is not required under paragraph (c), (d), or (e) of this clause.
(f) Unless the consent or approval specifically provides otherwise, neither consent by the Contracting Officer to any subcontract nor approval of the Contractor’s purchasing system shall constitute a determination—
(1) Of the acceptability of any subcontract terms or conditions;
(2) Of the allowability of any cost under this contract; or
(3) To relieve the Contractor of any responsibility for performing this contract.
(g) No subcontract or modification thereof placed under this contract shall provide for payment on a cost-plus-a percentage- of-cost basis, and any fee payable under cost-reimbursement type subcontracts shall not exceed the fee limitations in FAR 15.404-4(c)(4)(i).
(h) The Contractor shall give the Contracting Officer immediate written notice of any action or suit filed and prompt notice of any claim made against the Contractor by any subcontractor or vendor that, in the opinion of the Contractor, may result in litigation related in any way to this contract, with respect to which the Contractor may be entitled to reimbursement from the Government.
(i) The Government reserves the right to review the Contractor’s purchasing system as set forth in FAR Subpart 44.3.
(j) Paragraphs (c) and (e) of this clause do not apply to the following subcontracts, which were evaluated during negotiations:
(End of clause)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquishttps://www.acquisition.gov/far/http://farsite.hill.af.mil/
(End of provision)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/
(End of clause)
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any DFARS (48 CFR 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of clause)
Files
| File | Type | Posted |
|---|---|---|
| Wage Determination_22Q0001.pdf | ||
| Shrink Wrap SOW Final.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity