The bridge is located approximately 15 miles northwest of Dubois, Wyoming in the Shoshone National Forest. Dubois, Wyoming 82513, United States

Notice details come from SAM.gov. Updated .

Notice text

Added: Jul 15, 2010 10:09 am • Remove trees and clear and grub as required.
• Construct the temporary detour.
• Establish the traffic control signing and temporary barriers as required for detour.
• Excavate for footings.
• Construct the footings.
• Construct the abutments and wingwalls to the elevation shown on the plans.
• Backfill the abutments to just below the beam seat elevation.
• Grade portions of the channel banks under the new bridge.
• Install riprap adjacent to the new structure.
• Erect the timber superstructure.
• Construct the remaining abutment and wingwall concrete.
• Construct the remaining backfill and approach embankment.
• Install the approach and bridge rails.
• Install the aggregate surface course
• Shift traffic to the new bridge.
• Remove the detour.
• Install the final traffic control devices as shown on the plans.
• Complete the grading at the location of the detour.
• Complete the riprap installation along the stream.
• Salvage and transport the existing bridge timber stringers.

Attachments

Files attached to this notice, newest first
File Type Posted
WarmSpringsHydroReport.pdf PDF
AG-82X9-S-10-0103 a 1.pdf PDF
AG-82X9-S-10-0103.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity