Shore protection project, beach rennourishment 2021, FT pierce, ST, lucie county, florida
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- GROUP1-18-R-J019
- Agency
-
ENDIST Jacksonville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KF Construction Of Dredging Facilities
- Place of performance
- Alachua Fl Usa
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
Revision 0003, dated September 16, 2020 has been posted.
Revision 0002, dated September 4, 2020 has been posted.
Revision 0001, dated August 25, 2020 has been posted.
Project work consists of a base and one option. The estimated period of performance for the required work is 130 calendar days after the Contractor receives the notice to proceed. Project work includes constructing a beach berm between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 to T-41 to an elevation +6.8 feet with a varying berm width. The Base of work consists of beach fill between Sta. 338+65 to Sta. 395+00 including an ADA compliant ramp. Option A consists of beach fill between Sta. 395+00 to Sta. 411+73. A permitted offshore borrow area for the project is located approximately 4 miles southeast of the project site. Due to the extensive hard ground areas located offshore of the fill template area, offshore pipeline access to the beach site is prohibited. The Contractor will operate the off-loading from inside the South Jetty of Fort Pierce Inlet, FL. Staging area and beach access to the project fill area is located at the end of Seaway Drive also near the south jetty offloading area. Project work also includes but is not limited to endangered species observers, sea turtle non-capture trawl sweeping, turbidity monitoring, beach tilling, and construction/vibration controls and monitoring.
Project Location: The project is located in Ft. Pierce in St. Lucie County Florida
Update #3 ·
Revision 0002, dated September 4, 2020 has been posted.
Revision 0001, dated August 25, 2020 has been posted.
Project work consists of a base and one option. The estimated period of performance for the required work is 130 calendar days after the Contractor receives the notice to proceed. Project work includes constructing a beach berm between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 to T-41 to an elevation +6.8 feet with a varying berm width. The Base of work consists of beach fill between Sta. 338+65 to Sta. 395+00 including an ADA compliant ramp. Option A consists of beach fill between Sta. 395+00 to Sta. 411+73. A permitted offshore borrow area for the project is located approximately 4 miles southeast of the project site. Due to the extensive hard ground areas located offshore of the fill template area, offshore pipeline access to the beach site is prohibited. The Contractor will operate the off-loading from inside the South Jetty of Fort Pierce Inlet, FL. Staging area and beach access to the project fill area is located at the end of Seaway Drive also near the south jetty offloading area. Project work also includes but is not limited to endangered species observers, sea turtle non-capture trawl sweeping, turbidity monitoring, beach tilling, and construction/vibration controls and monitoring.
Project Location: The project is located in Ft. Pierce in St. Lucie County Florida
Update #2 ·
Revision 0001, dated August 25, 2020 has been posted.
Project work consists of a base and one option. The estimated period of performance for the required work is 130 calendar days after the Contractor receives the notice to proceed. Project work includes constructing a beach berm between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 to T-41 to an elevation +6.8 feet with a varying berm width. The Base of work consists of beach fill between Sta. 338+65 to Sta. 395+00 including an ADA compliant ramp. Option A consists of beach fill between Sta. 395+00 to Sta. 411+73. A permitted offshore borrow area for the project is located approximately 4 miles southeast of the project site. Due to the extensive hard ground areas located offshore of the fill template area, offshore pipeline access to the beach site is prohibited. The Contractor will operate the off-loading from inside the South Jetty of Fort Pierce Inlet, FL. Staging area and beach access to the project fill area is located at the end of Seaway Drive also near the south jetty offloading area. Project work also includes but is not limited to endangered species observers, sea turtle non-capture trawl sweeping, turbidity monitoring, beach tilling, and construction/vibration controls and monitoring.
Project Location: The project is located in Ft. Pierce in St. Lucie County Florida
Update #1 ·
Project work consists of a base and one option. The estimated period of performance for the required work is 130 calendar days after the Contractor receives the notice to proceed. Project work includes constructing a beach berm between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 to T-41 to an elevation +6.8 feet with a varying berm width. The Base of work consists of beach fill between Sta. 338+65 to Sta. 395+00 including an ADA compliant ramp. Option A consists of beach fill between Sta. 395+00 to Sta. 411+73. A permitted offshore borrow area for the project is located approximately 4 miles southeast of the project site. Due to the extensive hard ground areas located offshore of the fill template area, offshore pipeline access to the beach site is prohibited. The Contractor will operate the off-loading from inside the South Jetty of Fort Pierce Inlet, FL. Staging area and beach access to the project fill area is located at the end of Seaway Drive also near the south jetty offloading area. Project work also includes but is not limited to endangered species observers, sea turtle non-capture trawl sweeping, turbidity monitoring, beach tilling, and construction/vibration controls and monitoring.
Project Location: The project is located in Ft. Pierce in St. Lucie County Florida
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Shore protection project, beach rennourishment 2021, FT pierce, ST, lucie county, florida | Award Notice | |
| This notice | Solicitation | |
| Shore protection project, beach rennourishment 2021, FT pierce, ST, lucie county, florida | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity