Revision 0001 to Addendum to 1442 GROUP118RJ019.pdf

PDF 610 KB Posted

Attached to
SHORE PROTECTION PROJECT, BEACH RENNOURISHMENT 2021, FT PIERCE, ST, LUCIE COUNTY, FLORIDA
Solicitation number
GROUP1-18-R-J019
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISION 0001 – DATED 25 AUGUST 2020

ADDENDUM TO THE STANDARD FORM 1442

Shore Protection Project, Fort Pierce, Beach Renourishment 2021, St. Lucie County, Florida

NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO

THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER

SOLICITATION NUMBER W912EP18R0029, GROUP 1 - UNRESTRICTED:

Callan Marine, Ltd. (W912EP19D0023); Cashman Dredging & Marine Contracting Co., LLC (W912EP19D0024); Cavache Inc. (W912EPD0025); Continental Heavy Civil Corp (CHC) (W912EP19D0026); Cottrell Contracting Corporation (W912EP19D0027); Great Lakes Dredge & Dock Company, LLC (W912EP19D0028); J.T. Cleary Inc. (W912EP19D0029);

Manson Construction Co. (W912EP19D0030); Marinex Construction, Inc.

(W912EP19D0031); Norfolk Dredging Company (W912EP19D0032); Orion Marine Construction, Inc. (W912EP19D0033); Southern Dredging Co., Inc. (W912EP19D0034);

The Dutra Group (W912EP19D0035); Waterfront Property Services, LLC dba Gator Dredging (W912EP19D0036); Weeks Marine, Inc. (W912EP19D0037).

PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE

PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 1 - UNRESTRICTED

DREDGING MATOC POOL.

EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA) evaluation method. To be considered technically acceptable, an offeror’s proposal must be rated “Acceptable under all non-price factors.

The factors for evaluation will be as follows:

FACTOR 1 - Availability of technically acceptable dredge(s)

FACTOR 2 - Past performance

FACTOR 3 - Price

SUBMISSION REQUIREMENTS: Contractors are required to submit the following:

FACTOR 1 - Availability of technically acceptable dredge(s).

The contractor shall provide a letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the current location of dredge(s).

Evaluation Method:

The Government will evaluate all identified dredge(s) submitted to determine whether the identified dredge(s) have been found technically acceptable by the Contracting Officer prior to the proposal due date. The Government will also determine whether the

GROUP1-18-R-J019 1 REVISION 0001

GROUP1-18-R-J019 2 REVISION 0001

dredge(s) are available to meet the required period of performance as stated in the Notice of Intent. To be determined Acceptable for Factor 1, the identified dredge(s) must have been found technically acceptable prior to the proposal due date and available to meet the required period of performance.

FACTOR 2 - Past performance.

NO SUBMISSION REQUIREMENT. Past Performance information submitted in response to the Dredging MATOC (Solicitation No. W912EP18R0029) will be used to determine the offeror’s record of complying with contractual requirements and meeting acceptable levels of performance risk.

Evaluation Method:

Past Performance was recently evaluated for all contractors under the Dredging MATOC. An "Acceptable" rating was earned under Past Performance for all offerors that received an award in accordance with the solicitation evaluation criteria for the Dredging MATOC (Solicitation No. W912EP18R0029). Therefore, for this task order all offerors will receive the Past Performance rating of "Acceptable".

Note: For future task orders, the Government reserves the right to use recent and relevant project data independently obtained from other Government or commercial sources or from any other sources available to include, but not limited to: (1) the Past Performance Information Retrieval System (PPIRS), (2) Federal Awardee Performance and Integrity Information System (FAPIIS) or Electronic Subcontract Reporting System (eSRS), or other data bases; (3) interviews with Program/Project Managers and Contracting Officers or rely upon personal business experience with the offeror; and (4) consider any information the offeror submits which explains any problems encountered on the identified contract and the offeror's corrective actions. The Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate. Information related to the contractor’s (or contractor’s team) performance in Quality, Schedule, Management, Regulatory Compliance, and Safety/Security will be reviewed from the aforementioned additional sources to determine the offeror “Acceptable” or “Unacceptable.

FACTOR 3 – Price.

The Offeror’s submission for this factor shall be fully completed. Offeror completeness addresses the extent to which the elements of the price proposal are consistent with the requirements of the RFP.

Offerors are required to submit the following:

(1) Completed Bid Schedule (see Section 00010A).

(2) Bid Guarantee per Section 00700, Clause 52.228-1 and Section00100A, Attachment 8, Paragraph 2.4.3, of the MATOC.

GROUP1-18-R-J019 3 REVISION 0001

(3) Completed “Addendum to the Standard Form 1442 with the latest revision”.

THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:

Block 7. ISSUED BY: USA ENGINEER DISTRICT, JACKSONVILLE CONTRACTING

DIVISION 701 SAN MARCO BLVD JACKSONVILLE FL 32207-8175

Block 9 -- For additional information contact:

A. NAME: Dewayne Sparks

EMAIL ADDRESS: Dewayne.A.Sparks@usace.army.mil

B. TELEPHONE NO.: 904-232-1626

Block 10 – THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS: The project work consists of a base and one option. Project work includes constructing a beach berm between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 to T-41 to an elevation +6.8 feet with a varying berm width. The Base of work consists of beach fill between Sta.

338+65 to Sta. 395+00 including an ADA compliant ramp. Option A consists of beach fill between Sta. 395+00 to Sta. 411+73. A permitted offshore borrow area for the project is located approximately 4 miles southeast of the project site. Due to the extensive hard ground areas located offshore of the fill template area, offshore pipeline access to the beach site is prohibited. The Contractor will operate the off-loading from inside the South Jetty of Fort Pierce Inlet, FL. Staging area and beach access to the project fill area is located at the end of Seaway Drive also near the south jetty offloading area.

Project work also includes but is not limited to endangered species observers, sea turtle non-capture trawl sweeping, turbidity monitoring, beach tilling, and construction/vibration controls and monitoring.

DESCRIPTON OF WORK: Refer to Section 01 11 00 for complete description.

MAGNITUDE OF CONSTRUCTION: Between $5,000,000 and $10,000,000.

THIS SOLICITATION IS FOR GROUP 1 - UNRESTRICTED

YOU MUST BE REGISTERED IN SAM IN ORDER TO RECEIVE AN AWARD FROM

THIS NOTICE OF INTENT. THE SAM WEBSITE IS LOCATED AT WWW.SAM.GOV.

THE NAICS CODE FOR THIS NOTICE OF INTENT IS 237990 AND THE SMALL

BUSINESS SIZE STANDARD IS $30 MILLION.

Block 11 -- The Contractor shall begin performance within 75 calendar days and complete it within 120 calendar days after receiving notice to proceed. Complete all option CLINs within an additional 10 calendar days added to the period of performance.

This performance period is mandatory. (See FAR Clause 52.210.11 in Section 00700).

mailto:Dewayne.A.Sparks@usace.army.mil http://www.sam.gov/

GROUP1-18-R-J019 4 REVISION 0001

Block 12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE

AND PAYMENT BONDS: YES

Block 12B. PAYMENT BONDS DUE WITHIN 10 CALENDAR DAYS AFTER AWARD.

Block 13 ADDITIONAL SOLICITATION REQUIREMENTS:

A. Offer to perform the work required are due electronically at the following email address(s) by 2:00 PM, local time 21 Sep 2020 to dewayne.a.sparks@usace.army.mil & claurice.m.dingle@usace.army.mil.

B. An offer guarantee is required. Electronic copy of the bid guarantee shall be submitted with the offer and Original must be received within two calendar days of the date due for submittal of offer

C. All offers are subject to the (1) work requirements, and (2) other provisionsand clauses incorporated in the Notice Intent in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, 16, 17, 19, and 20A- 20D below:

Block 14. NAME AND ADDRESS OF OFFEROR (including Zip Code)

DUNS: CAGE:

Block 15. TELEPHONE NO. (Include area code):

Block 16. REMITTANCE ADDRESS: (Include only if different than Item 14)

Block 17. The offeror agrees to perform the work required at the prices specifiedbelow in strict accordance with the terms of this Notice of Intent, if this offer is accepted by the Government in writing within 30 calendar days after the date offers are due.

Block 18. The offeror agrees to furnish any required performance and payment bonds.

Block 19. ACKNOWLEDGMENT OF REVISIONS (The offeror acknowledges receipt of revisions to the notice of intent -- give number and date of each)

REVISION

NO.

DATE

mailto:dewayne.a.sparks@usace.army.mil mailto:claurice.m.dingle@usace.army.mil

GROUP1-18-R-J019 5 REVISION 0001

Block 20A. NAME AND

TITLE OF PERSON

AUTHORIZED TO SIGN

OFFER (Type or print to include email address)

Block 20B. EMAIL

ADDRESS

Block 20C.

SIGNATURE

Block 20D.

OFFER DATE

Block 26 --This Task Order will be administered by: Jacksonville Resident Office

Block 27 -- Payment will be made by:

USACE Finance Center 5722 Integrity Drive

ATTN: CEFC-AO-P

Millington, TN 38054-5005

SF 30 CONTINUATON SHEET

Shore Protection Project, Fort Pierce Beach Renourishment 2021, St. Lucie County, Florida

SUMMARY OF CHANGES

The text changes have been updated with (***) and red highlights, and pertain only to changes made by this amendment. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.

1. CONSTRUCTION SOLICITION AND SPECIFICATIONS:

DELETE Addendum to the Standard Form 1442 and REPLACE with the attached Addendum to the Standard Form 1442.

DELETE Site Visit Clause in Section 00010A and REPLACE with the attached revised Site Visit Clause in Section 00010A.

2. TECHNICAL SPECIFICATIONS:

N/A

3. DRAWINGS:

4. FOR INFORMATIONAL PURPOSES

(End of Summary of Changes)

W912EP-18-R-J019 Revision 0001

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (ALTERNATE I) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the work will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for -- 31 August 2020 @ 1000 AM Local Time.

(c) Participants will meet at (Location will be provided by the contract administration office via email. See

(d) below.)

(d) Participants should email Ms. Cecilia Muzi at cecilia.c.muzi@usace.army.mil on or before 28 August 2020 at 3:00 pm (Local Time) to make arrangements.

(e) Core borings are available. (If available, follow the instructions in the Physical Data paragraph in Section 01 11 00 to make arrangements to inspect the borings. Failure to follow the instructions may result in a delay ranging in duration from one hour to 4 days.)

(f) After the site visit, a memorandum summarizing the visit will be posted to www.beta.sam.gov under the solicitation number. This posting will be strictly for informational purposes only. The memorandum will not become a part of the solicitation. If the solicitation needs to be changed as a result of information obtained the site visit, a written amendment will be made available to all registered vendors. Questions regarding any information given in the memorandum must be directed to the person whose name appears in item 9 of the Standard Form 1442.

(End of provision)

***NOTE – A PreBid Conference is scheduled for September 1, 2020 @ 10:00 am.

The Call in information is:

Audio Teleconference: 1-877-402-9753 Access Code: 6546236 Security Code: 7777***

GROUP1-18-R-J019 REVISION 0001

mailto:cecilia.c.muzi@usace.army.mil

PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 1 - UNRESTRICTED DREDGING MATOC POOL.
FACTOR 1 - Availability of technically acceptable dredge(s) FACTOR 2 - Past performance
FACTOR 1 - Availability of technically acceptable dredge(s).
Evaluation Method:
FACTOR 2 - Past performance.
Evaluation Method:
FACTOR 3 – Price.
THIS SOLICITATION IS FOR GROUP 1 - UNRESTRICTED
2 Addendum Continuation Sheet.pdf
SUMMARY OF CHANGES
1. CONSTRUCTION SOLICITION AND SPECIFICATIONS:
2. TECHNICAL SPECIFICATIONS:
N/A
3. DRAWINGS:
4. FOR INFORMATIONAL PURPOSES

File details come from the government source that posted it. Updated .