Service Gate Replacement at Surry Mountain Lake Dam in Surry, NH
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912WJ21B0022
- Agency
-
ENDIST New England
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238290 Other Building Equipment Contractors
- Place of performance
- Surry, New Hampshire 03431, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for the replacement of flood control service gates and sheaves at the Surry Mountain Lake Dam located in Surry, New Hampshire. The U.S. Army Corps of Engineers, New England District will procure these goods and services with the objective of replacing the existing stainless steel gates. The solicitation will require the fabrication of two new Broome style gates per the performance-based specifications and criteria provided. Plans and calculations must demonstrate compliance with the performance requirements.
This procurement has been set aside for certified small businesses under NAICS code 238290 with a size standard of $16.5 million. The estimated value is between $500,000 and $1,000,000. The construction work is expected to occur in the summer of 2022. Questions must be submitted by July 17, 2021 and the solicitation containing response instructions and deadline will be issued via SAM.gov in October 2021. This is an opportunity exclusively for responsible small business sources to submit bids for consideration by the New England District.
Notice text
The U.S. Army Corps of Engineers, New England District will be issuing a set aside for certified small business contractors for the Replace Flood Control Service Gates and Sheaves project at the Surry Mountain Lake Dam, located in Surry, NH. The NAICS code for the work described below is 238290. (Size Standard $16.5 Million). The project is planned to be issued in October 2021, and will be set aside for Small Businesses. The construction is expected to occur in the summer of 2022. The estimated magnitude of this project is between $500,000 and $1,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District.
This project has the following major components.
- Disassemble hoist operating equipment as needed to remove the existing gates from the wire ropes.
- Fabricate two new Broome style gates per provided performance-based criteria and specifications, with adjustments for gate pocket specific tolerances and field verified dimensions. Plans and calculations will need to be submitted based on the performance-based specification for the gates to demonstrate compliance with performance criteria.
- Remove and dispose of existing stainless-steel gates.
- Install new gates and compatible side and bottom seals. Installation can be made in the upper gate tower.
- Test seal and gate operations.
Please note that this solicitation is set aside for certified small businesses. This is not a request for proposals at this time; the solicitation requirements and contract documents which will include instructions for submission and the response date will be available on or about October 2021. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the Federal Business Opportunities website (www.sam.gov). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at guesley.leger@usace.army.mil.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Flood Control Service Gates and Sheaves Replacement at Surry Mountain Lake Dam in Surry, NH | Award Notice | |
| Flood Control Service Gates and Sheaves Replacement at Surry Mountain Lake Dam in Surry, NH | Solicitation | |
| This notice | Pre-Solicitation | |
| Service Gate Replacement at Surry Mountain Lake Dam in Surry, NH | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH | ENDIST New England | No set-aside | |
| Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT | ENDIST New England | Total Small Business | |
| W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning | ENDIST Portland | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity