SELA-23a - Southeast Louisiana Urban, Flood Control Project, Napoleon Avenue Covered Canal, Carondelet St. To Constance St. , Orleans Parish, Louisiana (ED-12-005)

Award Notice Posted

Solicitation number
W912P8-13-R-0031
Agency
Awarded
to BOH Bros. Construction Co., L.L.C.
Set-aside
No set-aside

Opportunity facts

Contract number
W912P8-13-C-0052 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

7 versions

Update #7 · Latest ·

The work consists of the construction of approximately 3000 linear feet of concrete covered canal along Napoleon Avenue including associated drainage work and utility relocations (water) as required for construction of covered canal. Work consists of clearing and grubbing, excavation, site unwatering and groundwater monitoring, driving sheet piling, foundation jet grouting, utility relocations, maintenance and diversion of storm water, covered canal construction, catch basin installation and drainage tie-ins, street car rail and electrical construction, traffic control, asphalt road work, backfilling, fertilizing, seeding and sodding, and other incidental work as specified in the specifications and as indicated on the drawings. The estimated time for completion is 1150 calendar days.

Update #6 ·



UNRESTRICTED PROCUREMENT: This solicitation is anticipated to issue as a Request for Proposal (RFP) resulting in the award of a single firm fixed price (FFP) contract. The RFP is anticipated to issue on or about 9 July 2013 and the Proposal Due Date is anticipated to be on or about 9 August 2013. The estimated value of this work is between $25,000,000 and $100,000,000. Proposals received in response to this solicitation shall be evaluated in accordance with procedures outlined in Federal Acquisition Regulations (FAR) Part 15. NAICS CODE: 237990.

The work consists of the construction of approximately 3000 linear feet of concrete covered canal along Napoleon Avenue including associated drainage work and utility relocations (water) as required for construction of covered canal. Work consists of clearing and grubbing, excavation, site unwatering and groundwater monitoring, driving sheet piling, foundation jet grouting, utility relocations, maintenance and diversion of storm water, covered canal construction, catch basin installation and drainage tie-ins, street car rail and electrical construction, traffic control, asphalt road work, backfilling, fertilizing, seeding and sodding, and other incidental work as specified in the specifications and as indicated on the drawings. The estimated time for completion is 1150 calendar days.

Selection will be based on the following criteria, with non-cost factors being more important than price. Factors 1 and 2 are comparatively equal in importance and are significantly more important when compared to Factor 3. Factor 4 is significantly less important than Factors 1, 2, and 3. Factor 5 is significantly less important than Factors 1, 2, 3 and 4 when combined. The Technical Non-Cost Factors are: (1) Past Performance (2) Technical Approach (3) Key Personnel and Project Management Plan and (4) Small Business Participation Plan; Cost Factor (5) Price. The Price Factor may become more significant in contributing to the source selection decision if competing proposals offer comparatively equal Past Performance and Technical Approaches and due consideration is given to Key Personnel, Project Management Plan and Small Business Participation Plan. These evaluation factors are subject to change. Any changes to the evaluation factors will be shown in the solicitation. The solicitation shall include a detailed list of evaluation factors, including any subfactors or elements, and shall provide instructions for proposal requirements and the basis for award. Any changes made to the solicitation will be through an amendment.

The Government will not provide written paper copies of the solicitation. Telephone, written, facsimile, or e-mail requests for the solicitation package will not be honored. Potential contractors are responsible for monitoring this site for the release of the solicitation package and any amendments.

You will need Adobe Reader for .pdf files (www.adobe.com) in order to open most files posted by the New Orleans District. Offerors are also encouraged to post notices of prospective subcontracting opportunities on the Small Business Administration Subnet, at http://web.sba.gov/subnet. Offerors must be registered with the System for Award Management (SAM) to receive a Government contract award. You may register online at http://www.sam.gov.

The point of contact for this synopsis is Bridget M. Morehiser at 504-862-2876 or bridget.m.morehiser@usace.army.mil.

Update #5 ·



UNRESTRICTED PROCUREMENT: This solicitation is anticipated to issue as a Request for Proposal (RFP) resulting in the award of a single firm fixed price (FFP) contract. The RFP is anticipated to issue on or about 11 July 2013 and the Proposal Due Date is anticipated to be on or about 15 August 2013. The estimated value of this work is between $25,000,000 and $100,000,000. Proposals received in response to this solicitation shall be evaluated in accordance with procedures outlined in Federal Acquisition Regulations (FAR) Part 15. NAICS CODE: 237990.

The work consists of the construction of approximately 3000 linear feet of concrete covered canal along Napoleon Avenue including associated drainage work and utility relocations (water) as required for construction of covered canal. Work consists of clearing and grubbing, excavation, site unwatering and groundwater monitoring, driving sheet piling, foundation jet grouting, utility relocations, maintenance and diversion of storm water, covered canal construction, catch basin installation and drainage tie-ins, street car rail and electrical construction, traffic control, asphalt road work, backfilling, fertilizing, seeding and sodding, and other incidental work as specified in the specifications and as indicated on the drawings. The estimated time for completion is 1150 calendar days.

Selection will be based on the following criteria, with non-cost factors being more important than price. Factors 1 and 2 are comparatively equal in importance and are significantly more important when compared to Factor 3. Factor 4 is significantly less important than Factors 1, 2, and 3. Factor 5 is significantly less important than Factors 1, 2, 3 and 4 when combined. The Technical Non-Cost Factors are: (1) Past Performance (2) Technical Approach (3) Key Personnel and Project Management Plan and (4) Small Business Participation Plan; Cost Factor (5) Price. The Price Factor may become more significant in contributing to the source selection decision if competing proposals offer comparatively equal Past Performance and Technical Approaches and due consideration is given to Key Personnel, Project Management Plan and Small Business Participation Plan. These evaluation factors are subject to change. Any changes to the evaluation factors will be shown in the solicitation. The solicitation shall include a detailed list of evaluation factors, including any subfactors or elements, and shall provide instructions for proposal requirements and the basis for award. Any changes made to the solicitation will be through an amendment.

The Government will not provide written paper copies of the solicitation. Telephone, written, facsimile, or e-mail requests for the solicitation package will not be honored. Potential contractors are responsible for monitoring this site for the release of the solicitation package and any amendments.

You will need Adobe Reader for .pdf files (www.adobe.com) in order to open most files posted by the New Orleans District. Offerors are also encouraged to post notices of prospective subcontracting opportunities on the Small Business Administration Subnet, at http://web.sba.gov/subnet. Offerors must be registered with the System for Award Management (SAM) to receive a Government contract award. You may register online at http://www.sam.gov.

The point of contact for this synopsis is Bridget M. Morehiser at 504-862-2876 or bridget.m.morehiser@usace.army.mil.

Update #4 ·

NOTE: THIS IS A SYNOPSIS NOT A SOLICITATION. PLANS AND SPECIFICATIONS ARE NOT AVAILABLE AT THIS TIME; THEREFORE NO QUESTIONS OF A TECHNICAL OR CONTRACTUAL NATURE WILL BE ACCEPTED OR ANSWERED UNTIL THE SOLICITATION IS ISSUED. INFORMATION CONTAINED IN THIS SYNOPSIS IS SUBJECT TO CHANGE.

UNRESTRICTED PROCUREMENT: This solicitation is anticipated to issue as a Request for Proposal (RFP) resulting in the award of a single firm fixed price (FFP) contract. The RFP is anticipated to issue on or about 11 July 2013 and the Proposal Due Date is anticipated to be on or about 15 August 2013. The estimated value of this work is between $25,000,000 and $100,000,000. Proposals received in response to this solicitation shall be evaluated in accordance with procedures outlined in Federal Acquisition Regulations (FAR) Part 15. NAICS CODE: 237990.

The work consists of the construction of approximately 3000 linear feet of concrete covered canal along Napoleon Avenue including associated drainage work and utility relocations (water) as required for construction of covered canal. Work consists of clearing and grubbing, excavation, site unwatering and groundwater monitoring, driving sheet piling, foundation jet grouting, utility relocations, maintenance and diversion of storm water, covered canal construction, catch basin installation and drainage tie-ins, street car rail and electrical construction, traffic control, asphalt road work, backfilling, fertilizing, seeding and sodding, and other incidental work as specified in the specifications and as indicated on the drawings. The estimated time for completion is 1150 calendar days.

Selection will be based on the following criteria, with non-cost factors being more important than price. Factors 1 and 2 are comparatively equal in importance and are significantly more important when compared to Factor 3. Factor 4 is significantly less important than Factors 1, 2, and 3. Factor 5 is significantly less important than Factors 1, 2, 3 and 4 when combined. The Technical Non-Cost Factors are: (1) Past Performance (2) Technical Approach (3) Key Personnel and Project Management Plan and (4) Small Business Participation Plan; Cost Factor (5) Price. The Price Factor may become more significant in contributing to the source selection decision if competing proposals offer comparatively equal Past Performance and Technical Approaches and due consideration is given to Key Personnel, Project Management Plan and Small Business Participation Plan. These evaluation factors are subject to change. Any changes to the evaluation factors will be shown in the solicitation. The solicitation shall include a detailed list of evaluation factors, including any subfactors or elements, and shall provide instructions for proposal requirements and the basis for award. Any changes made to the solicitation will be through an amendment.

The Government will not provide written paper copies of the solicitation. Telephone, written, facsimile, or e-mail requests for the solicitation package will not be honored. Potential contractors are responsible for monitoring this site for the release of the solicitation package and any amendments.

You will need Adobe Reader for .pdf files (www.adobe.com) in order to open most files posted by the New Orleans District. Offerors are also encouraged to post notices of prospective subcontracting opportunities on the Small Business Administration Subnet, at http://web.sba.gov/subnet. Offerors must be registered with the System for Award Management (SAM) to receive a Government contract award. You may register online at http://www.sam.gov.

The point of contact for this synopsis is Bridget M. Morehiser at 504-862-2876 or bridget.m.morehiser@usace.army.mil.

Update #3 ·

NOTE: THIS IS A SYNOPSIS NOT A SOLICITATION. PLANS AND SPECIFICATIONS ARE NOT AVAILABLE AT THIS TIME; THEREFORE NO QUESTIONS OF A TECHNICAL OR CONTRACTUAL NATURE WILL BE ACCEPTED OR ANSWERED UNTIL THE SOLICITATION IS ISSUED. INFORMATION CONTAINED IN THIS SYNOPSIS IS SUBJECT TO CHANGE.

UNRESTRICTED PROCUREMENT: This solicitation is anticipated to issue as a Request for Proposal (RFP) resulting in the award of a single firm fixed price (FFP) contract. The RFP is anticipated to issue on or about 1 July 2013 and the Proposal Due Date is anticipated to be on or about 31 July 2013. The estimated value of this work is between $25,000,000 and $100,000,000. Proposals received in response to this solicitation shall be evaluated in accordance with procedures outlined in Federal Acquisition Regulations (FAR) Part 15. NAICS CODE: 237990.

The work consists of the construction of approximately 3000 linear feet of concrete covered canal along Napoleon Avenue including associated drainage work and utility relocations (water) as required for construction of covered canal. Work consists of clearing and grubbing, excavation, site unwatering and groundwater monitoring, driving sheet piling, foundation jet grouting, utility relocations, maintenance and diversion of storm water, covered canal construction, catch basin installation and drainage tie-ins, street car rail and electrical construction, traffic control, asphalt road work, backfilling, fertilizing, seeding and sodding, and other incidental work as specified in the specifications and as indicated on the drawings. The estimated time for completion is 1150 calendar days.

Selection will be based on the following criteria, with non-cost factors being more important than price. Factors 1 and 2 are comparatively equal in importance and are significantly more important when compared to Factor 3. Factor 4 is significantly less important than Factors 1, 2, and 3. Factor 5 is significantly less important than Factors 1, 2, 3 and 4 when combined. The Technical Non-Cost Factors are: (1) Past Performance (2) Technical Approach (3) Key Personnel and Project Management Plan and (4) Small Business Participation Plan; Cost Factor (5) Price. The Price Factor may become more significant in contributing to the source selection decision if competing proposals offer comparatively equal Past Performance and Technical Approaches and due consideration is given to Key Personnel, Project Management Plan and Small Business Participation Plan. These evaluation factors are subject to change. Any changes to the evaluation factors will be shown in the solicitation. The solicitation shall include a detailed list of evaluation factors, including any subfactors or elements, and shall provide instructions for proposal requirements and the basis for award. Any changes made to the solicitation will be through an amendment.

The Government will not provide written paper copies of the solicitation. Telephone, written, facsimile, or e-mail requests for the solicitation package will not be honored. Potential contractors are responsible for monitoring this site for the release of the solicitation package and any amendments.

You will need Adobe Reader for .pdf files (www.adobe.com) in order to open most files posted by the New Orleans District. Offerors are also encouraged to post notices of prospective subcontracting opportunities on the Small Business Administration Subnet, at http://web.sba.gov/subnet. Offerors must be registered with the System for Award Management (SAM) to receive a Government contract award. You may register online at http://www.sam.gov.

The point of contact for this synopsis is Bridget M. Morehiser at 504-862-2876 or bridget.m.morehiser@usace.army.mil.

Update #2 ·

NOTE: THIS IS A SYNOPSIS NOT A SOLICITATION. PLANS AND SPECIFICATIONS ARE NOT AVAILABLE AT THIS TIME; THEREFORE NO QUESTIONS OF A TECHNICAL OR CONTRACTUAL NATURE WILL BE ACCEPTED OR ANSWERED UNTIL THE SOLICITATION IS ISSUED. INFORMATION CONTAINED IN THIS SYNOPSIS IS SUBJECT TO CHANGE.

UNRESTRICTED PROCUREMENT: This solicitation is anticipated to issue as a Request for Proposal (RFP) resulting in the award of a single firm fixed price (FFP) contract. The RFP is anticipated to issue on or about 17 June 2013 and the Proposal Due Date is anticipated to be on or about 17 July 2013. The estimated value of this work is between $25,000,000 and $100,000,000. Proposals received in response to this solicitation shall be evaluated in accordance with procedures outlined in Federal Acquisition Regulations (FAR) Part 15. NAICS CODE: 237990.

The work consists of the construction of approximately 3000 linear feet of concrete covered canal along Napoleon Avenue including associated drainage work and utility relocations (water) as required for construction of covered canal. Work consists of clearing and grubbing, excavation, site unwatering and groundwater monitoring, driving sheet piling, foundation jet grouting, utility relocations, maintenance and diversion of storm water, covered canal construction, catch basin installation and drainage tie-ins, street car rail and electrical construction, traffic control, asphalt road work, backfilling, fertilizing, seeding and sodding, and other incidental work as specified in the specifications and as indicated on the drawings. The estimated time for completion is 1150 calendar days.

Selection will be based on the following criteria, with non-cost factors being more important than price. Factors 1 and 2 are comparatively equal in importance and are significantly more important when compared to Factor 3. Factor 4 is significantly less important than Factors 1, 2, and 3. Factor 5 is significantly less important than Factors 1, 2, 3 and 4 when combined. The Technical Non-Cost Factors are: (1) Past Performance (2) Technical Approach (3) Key Personnel and Project Management Plan and (4) Small Business Participation Plan; Cost Factor (5) Price. The Price Factor may become more significant in contributing to the source selection decision if competing proposals offer comparatively equal Past Performance and Technical Approaches and due consideration is given to Key Personnel, Project Management Plan and Small Business Participation Plan. These evaluation factors are subject to change. Any changes to the evaluation factors will be shown in the solicitation. The solicitation shall include a detailed list of evaluation factors, including any subfactors or elements, and shall provide instructions for proposal requirements and the basis for award. Any changes made to the solicitation will be through an amendment.

The Government will not provide written paper copies of the solicitation. Telephone, written, facsimile, or e-mail requests for the solicitation package will not be honored. Potential contractors are responsible for monitoring this site for the release of the solicitation package and any amendments.

You will need Adobe Reader for .pdf files (www.adobe.com) in order to open most files posted by the New Orleans District. Offerors are also encouraged to post notices of prospective subcontracting opportunities on the Small Business Administration Subnet, at http://web.sba.gov/subnet. Offerors must be registered with the System for Award Management (SAM) to receive a Government contract award. You may register online at http://www.sam.gov.

The point of contact for this synopsis is Bridget M. Morehiser at 504-862-2876 or bridget.m.morehiser@usace.army.mil.

Update #1 ·

NOTE: THIS IS A SYNOPSIS NOT A SOLICITATION. PLANS AND SPECIFICATIONS ARE NOT AVAILABLE AT THIS TIME; THEREFORE NO QUESTIONS OF A TECHNICAL OR CONTRACTUAL NATURE WILL BE ACCEPTED OR ANSWERED UNTIL THE SOLICITATION IS ISSUED. INFORMATION CONTAINED IN THIS SYNOPSIS IS SUBJECT TO CHANGE.

UNRESTRICTED PROCUREMENT: This solicitation is anticipated to issue as a Request for Proposal (RFP) resulting in the award of a single firm fixed price (FFP) contract. The RFP is anticipated to issue on or about 10 June 2013 and the Proposal Due Date is anticipated to be on or about 10 July 2013. The estimated value of this work is between $25,000,000 and $100,000,000. Proposals received in response to this solicitation shall be evaluated in accordance with procedures outlined in Federal Acquisition Regulations (FAR) Part 15. NAICS CODE: 237990.

The work consists of the construction of approximately 3000 linear feet of concrete covered canal along Napoleon Avenue including associated drainage work and utility relocations (water) as required for construction of covered canal. Work consists of clearing and grubbing, excavation, site unwatering and groundwater monitoring, driving sheet piling, foundation jet grouting, utility relocations, maintenance and diversion of storm water, covered canal construction, catch basin installation and drainage tie-ins, street car rail and electrical construction, traffic control, asphalt road work, backfilling, fertilizing, seeding and sodding, and other incidental work as specified in the specifications and as indicated on the drawings. The estimated time for completion is 1150 calendar days.

Selection will be based on the following criteria, with non-cost factors being more important than price. Factors 1 and 2 are comparatively equal in importance and are significantly more important when compared to Factor 3. Factor 4 is significantly less important than Factors 1, 2, and 3. Factor 5 is significantly less important than Factors 1, 2, 3 and 4 when combined. The Technical Non-Cost Factors are: (1) Past Performance (2) Technical Approach (3) Key Personnel and Project Management Plan and (4) Small Business Participation Plan; Cost Factor (5) Price. The Price Factor may become more significant in contributing to the source selection decision if competing proposals offer comparatively equal Past Performance and Technical Approaches and due consideration is given to Key Personnel, Project Management Plan and Small Business Participation Plan. These evaluation factors are subject to change. Any changes to the evaluation factors will be shown in the solicitation. The solicitation shall include a detailed list of evaluation factors, including any subfactors or elements, and shall provide instructions for proposal requirements and the basis for award. Any changes made to the solicitation will be through an amendment.

The Government will not provide written paper copies of the solicitation. Telephone, written, facsimile, or e-mail requests for the solicitation package will not be honored. Potential contractors are responsible for monitoring this site for the release of the solicitation package and any amendments.

You will need Adobe Reader for .pdf files (www.adobe.com) in order to open most files posted by the New Orleans District. Offerors are also encouraged to post notices of prospective subcontracting opportunities on the Small Business Administration Subnet, at http://web.sba.gov/subnet. Offerors must be registered with the System for Award Management (SAM) to receive a Government contract award. You may register online at http://www.sam.gov.

The point of contact for this synopsis is Bridget M. Morehiser at 504-862-2876 or bridget.m.morehiser@usace.army.mil.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors