Secure Admin/Ops Facility, Phase 4 – Nolan Building Renovation, Ft. Belvoir, VA

Closed Special Notice Posted

This opportunity was awarded. See the award notice from , or the latest pre-solicitation from .

Solicitation number
W912DR23R0013_NOLAN_BUILDING
Agency
ENDIST Baltimore US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2AZ Repair Or Alteration Of Other Administrative Facilities And Service Buildings
Place of performance
Fort Belvoir, Virginia 22060, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This Special Notice announces the prequalification of sources for the Army Intelligence & Security Command Secure Admin/Ops Facility Phase 4 Nolan Building Renovation located at Fort Belvoir, Virginia. The U.S. Army Corps of Engineers Engineering District Baltimore has been tasked to solicit construction services for the comprehensive renovation of the existing Nolan Building.

Contractors will be required to submit a Statement of Affiliation by the December 30th deadline to be considered for prequalification under the procedures outlined in DFARS 236.272. The basic objective of the project is to repair and replace various building systems including the roofing, HVAC, electrical, plumbing, fire protection and interior finishes. In accordance with DFARS 236.204, the magnitude of construction is estimated between $25,000,000 to $100,000,000. A Design-Bid-Build Best-Value Tradeoff acquisition process will be utilized to award a firm-fixed price contract for the renovation in compliance with FAR 15, Contracting by Negotiations.

Notice text

2 versions

Update #2 · Latest ·

Prequalification of Sources has been posted to SAM.gov as a Sources Sought notice. 

https://sam.gov/opp/e382ed9d390d4332a6d76cc28f1264ac/view

**********************************

The Prequalification of Sources notice for the Army Intelligence & Security Command (INSCOM) Secure Admin/Ops Facility (SAOF) – Phase 4 Nolan Building Renovation at Fort Belvoir, Virginia will be posted to SAM.gov on or about 30 November 2022.

Sources will be prequalified in accordance with DFARS 236.272. Under these procedures, Offerors will be required to submit a Statement of Affiliation (SOA). The Government will evaluate the SOA and determine a list of qualified Offerors to which the Request for Proposal (RFP), including plans and specifications, will be sent.

The U.S. Army Corps of Engineers, Baltimore District (NAB), has been tasked to solicit for and award construction services for the renovation of the Nolan Building at Fort Belvoir, VA.  Proposed project will be a competitive, firm-fixed price contract procured in accordance with FAR 15, Contracting by Negotiations, under a Design-Bid-Build Best-Value Tradeoff Process.

The basic objective of this project is as follows:  Comprehensive renovation of the existing Nolan Building. Systems to be repaired include the roofing, heating, ventilation, and air conditioning (HVAC); electrical distribution; water distribution, wastewater collection, fire alarm and suppression systems, ceilings, windows and doors, floor coverings, interior partitions, and interior and exterior finishes. Hazardous materials (HAZMAT) were identified in a survey, Asbestos containing materials (ACM) found or exposed will be abated and other HAZMAT will be addressed by this project.

In accordance with DFARS 236.204, the magnitude of construction is between $25,000,000 and $100,000,000.

Update #1 ·

The Prequalification of Sources notice for the Army Intelligence & Security Command (INSCOM) Secure Admin/Ops Facility (SAOF) – Phase 4 Nolan Building Renovation at Fort Belvoir, Virginia will be posted to SAM.gov on or about 30 November 2022.

Sources will be prequalified in accordance with DFARS 236.272. Under these procedures, Offerors will be required to submit a Statement of Affiliation (SOA). The Government will evaluate the SOA and determine a list of qualified Offerors to which the Request for Proposal (RFP), including plans and specifications, will be sent.

The U.S. Army Corps of Engineers, Baltimore District (NAB), has been tasked to solicit for and award construction services for the renovation of the Nolan Building at Fort Belvoir, VA.  Proposed project will be a competitive, firm-fixed price contract procured in accordance with FAR 15, Contracting by Negotiations, under a Design-Bid-Build Best-Value Tradeoff Process.

The basic objective of this project is as follows:  Comprehensive renovation of the existing Nolan Building. Systems to be repaired include the roofing, heating, ventilation, and air conditioning (HVAC); electrical distribution; water distribution, wastewater collection, fire alarm and suppression systems, ceilings, windows and doors, floor coverings, interior partitions, and interior and exterior finishes. Hazardous materials (HAZMAT) were identified in a survey, Asbestos containing materials (ACM) found or exposed will be abated and other HAZMAT will be addressed by this project.

In accordance with DFARS 236.204, the magnitude of construction is between $25,000,000 and $100,000,000.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
INSCOM SAOF Phase 4 Renovation, Fort Belvoir, VA Award Award Notice
Prequalification of Sources: Secure Admin/Ops Facility, Phase 4 – Nolan Building Renovation, Ft. Belvoir, VA Latest pre-solicitation Pre-Solicitation
Secure Admin/Ops Facility, Phase 4 – Nolan Building Renovation, Ft. Belvoir, VA This notice Special Notice
Secure Admin/Ops Facility, Phase 4 – Nolan Building Renovation, Ft. Belvoir, VA Pre-Solicitation
Secure Admin/Ops Facility, Phase 4 – Nolan Building Renovation, Ft. Belvoir, VA Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity