Scaffolding Bonneville Dam (Phased)
Closed Solicitation Posted
- Solicitation number
- W9127N24Q0119
- Agency
-
ENDIST Portland
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- Place of performance
- Cascade Locks, Oregon 97014, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Engineering District Portland is seeking quotes from small businesses for a firm-fixed price commercial services contract to provide scaffolding services at the Bonneville Dam Powerhouse 1 in Cascade Locks, Oregon. The contractor will be responsible for the installation, maintenance, and removal of scaffolding in up to 7 units, with an initial 2 units being set up and the scaffolding rotated to the remaining 5 units over an estimated 245 days of total rental time. Quotes are due by September 18, 2024, and the contract will be evaluated based on the contractor's ability to meet the government's requirements for scaffolding installation, maintenance, relocation, and removal.
This is a total small business set-aside contract under NAICS code 532490, with a $40 million size standard. The government has provided a Performance Work Statement and a Site Visit Roster, indicating that the contractor must comply with various safety and security requirements, including completing antiterrorism and site access training. The contract is expected to have a firm-fixed price, and the government will provide crane support, electrical power, and water, while the contractor is responsible for all other equipment, materials, and labor.
Notice text
2 versions
Update #2 · Latest ·
Scaffolding for Bonneville Dam Powerhouse 1. A total of 7 units require scaffolding. Initially 2 units will be set up with scaffolding and the scaffolding rotated (phased) to other units over time as the Bonneville Dam works on the powerhouse.
Update #1 ·
Scaffolding for Bonneville Dam Powerhouse 1. A total of 7 units require scaffolding. Initially 2 units will be set up and the scaffolding rotated (phased) to other units over time as the Bonneville Dam works on the powerhouse.
Files
| File | Type | Posted |
|---|---|---|
| 7N24Q0119_Amend01_Final.pdf | ||
| Amendment 01 PWS _FINAL_179SEP2024.pdf | ||
| Site Visit Roster_W9127N24Q0119 SAMPLE.xlsx | XLSX spreadsheet | |
| RFQ_W9127N24Q0119_9SEP2024_route_Final.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| TDA Isolated Phase Bus and Duct Inspection | ENDIST Portland | No set-aside | |
| John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 | ENDIST Portland | No set-aside | |
| W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning | ENDIST Portland | Total Small Business | |
| John day DAM unit 10 packing box replacement | ENDIST Portland | No set-aside | |
| Scaffolding for Repair and Repoint Chalmette Monum | Interior Business Center | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity