Savannah River Site- Facilities IDIQ

Closed Pre-Solicitation Posted

A newer solicitation was posted. See the latest solicitation from .

Solicitation number
1147917(A)
Agency
Forest Service Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2JZ Repair Or Alteration Of Miscellaneous Buildings
Place of performance
New Ellenton, South Carolina 29809, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The USDA Forest Service is seeking contractors for a comprehensive facilities maintenance and construction contract at the Savannah River Site in New Ellenton, South Carolina. This Indefinite Delivery/Indefinite Quantity (IDIQ) contract encompasses a broad range of services including facility repairs, utility system upgrades, roofing, plumbing, electrical work, environmental remediation, security improvements, landscaping, and emergency response services. Contractors must demonstrate bonding capacity of $250,000 for single projects and $1 million aggregate for performance and payment bonds, with the majority of task orders expected to be valued under $250,000 though individual orders may reach $1 million. The evaluation will utilize a best value tradeoff method under FAR Part 15 procedures, where non-price factors are approximately equal to price in importance. The pre-solicitation notice closes on June 30, 2025, with the full solicitation expected to be released around July 2, 2025, allowing potential offerors a 30-day response period.

This opportunity is designated as a 100% total small business set-aside with no incumbent contractors identified in the notice. The Forest Service plans to award up to three IDIQ contracts with a shared ceiling of $7 million over a five-year performance period from FY 2026 through FY 2030, consisting of a base year plus four option years. The anticipated award date is September 19, 2025, with the ordering period concluding when either the five-year term expires or the $7 million ceiling is reached, whichever occurs first. The contract structure allows the government flexibility to issue task orders for various construction and maintenance activities as needed throughout the performance period. Additionally, the Contracting Officer may award up to two firm fixed-price seed projects to IDIQ awardees if determined to be in the government's best interest.

Notice text

Pre-solicitation Notice: Savannah River Site Facilities IDIQ FY 26 – FY30

12445225R0036

Date: June 15, 2025

Contracting Office: USDA Forest Service, Procurement and Property Services, E-12

1720 Peachtree Road NW, Suite 876S, Atlanta, GA 30309

Primary NAICS Code: 236220 Other NAICS codes that may be applicable include: 237110, 237990, 238210, and 238220.

PSC Code: Z2AA

Proposed Solicitation Number: 12445225R0036

Pre-solicitation Notice Closing Date: June 30, 2025

Competition: 100% Total Small Business Set Aside

Requirement Description: Contractor(s) shall provide all personnel, equipment, transportation, supervision, supplies and support equipment (vehicles), and incidentals to perform construction tasks in accordance with the terms, specifications, conditions, and provisions of the solicitation, the contract, subsequent task orders, laws, rules, and regulations. Task orders may require any combination of tasks associated with the maintenance or construction necessary to maintain facilities in a functioning condition, providing safe public access, protecting the transportation facility investment and the adjacent environmental resources. Work is generally confined within the limits of the facilities or recreational site areas as described in each TO.

Construction Activities:

The following list indicates various work projects and tasks that the Forest Service is intending to issue. These are just examples only and the actual tasks may vary. The Task Order will indicate the actual statement of work which the contractor(s) will bid for and construct.

  1. Replace flooring (carpet/tile/vinyl)
  2. Kitchen remodeling
  3. Replace Windows, Doors
  4. Pole shed repair/replacement
  5. Carpentry work
  6. Plumbing, water and wastewater construction/upgrade/performance improvement
    1. Install potable water and fire line.
    2. Replace and upgrade fixtures.
    3. Repair, Replace, and/or Upgrade distribution system, piping and other.
    4. Replace hot water heating devices/boilers with Energy Star products where applicable.
    5. Above/Underground leak detection and repairs
    6. Perform potable water storage tank inspections compliant with FAC 62-555.
    7. Repair, Recoat, and/or Replace hydro-pneumatic water storage tanks.
  7. Roofing Repair/Replacement
    1. Demolish existing roofing and/or other substrates.
    2. Investigate and repair roof leaks.
    3. Construct new roofing systems.
    4. Remove/replace gutters, downspouts.
  8. Painting
    1. Provide interior or exterior painting to manufacturer's recommended installation practices.
    2. Use green, low VOC paints that meet or exceed LEED standards as approved by the COR.
  9. On-site well renovation and upgrade.
    1. Upgrade existing wells, casings, pumps and equipment.
    2. Replace distribution systems.
    3. Abandon existing wells in accordance with State and/or federal regulations.
    4. Drill and install new wells (include new hand pumps or pressurized systems).
  10. On-site utility systems
    1. Upgrade, repair, modify or remove from service existing electrical systems, wastewater systems, public water systems, power, gas lines, fuel systems, or HVAC systems.
    2. Repair/replace electrical fixtures/fittings, wiring, pump, control system, and alarm systems.
    3. Install LED lights.
    4. Install A/V equipment.
    5. Routine maintenance of HVAC systems
  11. Parking, road, sidewalk, drainage structures, and boat ramps.
    1. Upgrade, repair or replace existing pavement systems, substrates or drainage systems
    2. Restripe and mark paving - Include signs as needed.
    3. Regrade and reshape roadways
    4. Gravel resurfacing of existing roadways
    5. Clearing and brushing of existing roadways
    6. Ditch cleaning and reshaping
    7. Chip sealing and other surface treatments of existing roads
    8. Replace culvert
    9. Install/construct new roadway/sidewalk.
    10. Repair/replace signs, gates, guardrails, bumpers, bollards and posts.
    11. Keep ramps free of debris, logs, sand, silt, and ensure ramp is safe to use.
  12. Condition Surveys, Inspections, and investigations
    1. Water & Wastewater Condition surveys
    2. Sanitary Surveys
    3. Road Condition Surveys
    4. Geotechnical Investigations
    5. Site Surveys
  13. Construct and install Pre-Engineered and modular building systems
    1. Metal buildings
    2. Pre-engineered and manufactured storage buildings
    3. Building/Pole shed replacement
  14. Install fencing and security gate systems
    1. Perimeter fencing
    2. Road closure gates
    3. Automated card or keypad activated gates
    4. Associated power and utility systems.
  15. Recreation Site Work
    1. Repair/replace picnic benches, shelter wood posts, wooden trim, Kiosk, vault toilets.
    2. Install gates (swing gate style or farm gate, set in concrete) and signage.
    3. Paint/stain structures (shelters, tables, benches, facia on roof etc., etc.)
  16. Landscape Improvements
    1. Plant vegetation, including irrigation, fertilization, and application of pesticides.
    2. Develop and shape sites for drainage and water retention.
    3. Prune trees, shrubs, and other vegetation.
    4. Removal of hazard trees, including stump.
    5. Construct features, curbing, walls, paving, signage, exterior lighting, and associated systems.
  17. Homeland Security Upgrades and Security Upgrades
    1. Electronic security, controls, and monitoring systems.
    2. Traffic control and surveillance equipment
    3. Video camera equipment
    4. Physical security feature upgrades.
    5. Radio tower upgrades.
    6. Electronic door locking system and card/FOB reader systems.
  18. Dismantling, Demolition and/or Removal of Improvements
    1. Evaluate/Test building/location for hazardous materials prior to demolition/removal
    2. Remove and dispose of all hazardous materials in Federal and State approved sites.
    3. Demolish infrastructure in safe and an OSHA regulated manner.
    4. Recycle building materials as per EPA waste management regulations.
    5. Remove all sub-surface structures and stabilize site & soils as per Task Order.
    6. Disconnect all utilities
  19. Placement and procurement of aggregate and rock to the requirements of the Task Order
  20. Rehabilitation of historic structures (hog barn, fire towers)
  21. Control of herbaceous/woody invasive species
    1. Control by mechanical or herbicide application
  22. Environmental Remediation and Abatement Activities
    1. Mold evaluation and remediation
    2. Asbestos surveys, management plans, abatement, removal and cleanup
    3. Lead paint removal and cleanup
    4. Wild animal abatement and cleanup activities
  23. Fire detection/alarm and Fire Suppression Systems construction/repair/replacement.
  24. 24/7 Emergency Response/Repair Services

Project Location: The work site is located on the Savannah River Site at the following address:

Savannah River Site

1-Mile Inside Aiken Barricade

New Ellenton, SC 29809

Work may be performed at administrative buildings, storage buildings, and other facilities. Work may also be performed at remote locations. Access roads may be paved, gravel, lime-rock, and/or sand surfaced. Cell phone coverage may not be available. Potable water, electricity, and sanitary facilities may not be available at some sites.

Period of Performance: The ordering period of the IDIQ contracts will be five (5) years from the effective date of the award or when the shared ceiling of $7 Million is reached, whichever comes first. The contract will have a base year and four (4) option years.

Basis of Award: A Request for Proposal solicitation SF 1442 will be advertised to solicit proposals. The offerors will be requested to submit information related to bonding capacity, specialized experience, technical competence, capability to perform, past performance, teaming arrangements and/or other information. All proposals must be complete and timely to be considered.

This action will utilize the procedures of FAR Part 15 – Contracting by Negotiation. The CO

will utilize the best value continuum of FAR 15.101. The tradeoff process will be used in IAW.

FAR 15.101. Source selection procedures will be utilized as set forth in FAR 15.3 to select firms

using the best value tradeoffs method.

The combined non-price factors are approximately equal to price. The importance of price will

increase if the Offerors’ non-price proposals are considered essentially equal in terms of overall

quality, or if price is so high as to significantly diminish the value of a non-price proposal’s

superiority to the Government. Award may be made to other than the lowest priced Offerors or

other than the highest technically rated Offerors.

The Contracting Officer will award up to three (3) IDIQs to the responsible Offerors whose proposals the Government determines conform to the solicitation, are fair and reasonable with regard to pricing, and whose proposal offers the best overall value to the Government, considering the price and non-price factors described herein. The actual number of awards will be dependent on the proposals received and the overall benefit to the Government.

If determined to be in the Government’s best interest, the Contracting Officer will award any number of two DBB seed projects as a Firm Fixed Price task order to an IDIQ awardee whose proposal offers the best overall value to the Government, considering the price and non-price factors.

Anticipated Award Date: September 19, 2025

Bonding Capacity: $250,000 single project; $1M aggregate for performance and payment bonds. The majority of task orders will be valued under $250,000 however, individual task orders may be valued up to $1 Million.

Terms and Conditions Information:

"One or more of the items under this acquisition is subject to Free Trade Agreements."

"One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements."

"One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements."

Solicitation Release: The Government anticipates the release of Solicitation No 12445225R0036 within 3 weeks on a 100 % total small business set-aside. The Government anticipates a vendor response time of 30 days after release of the solicitation. The solicitation will be posted on or about July 2, 2025, to www.sam.gov. All interested parties are responsible for downloading the solicitation from this site. Potential offerors are responsible for checking this web site for any amendments and downloading those amendments as they occur. No separate notice will be provided. All responsible sources may submit a proposal at their own cost which will be considered.

Point of Contact:

Keisha Robinson, Contract Specialist, 404-946-8187 Email Keisha.robinson@usda.gov

Attachments

Files attached to this notice, newest first
File Type Posted
Pre-solicitation Notice- Savannah River Site Facilities IDIQ 1147917(A).pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Savannah River Site- Facilities IDIQ Latest solicitation Solicitation
Savannah River Site- Facilities IDIQ Special Notice
Savannah River Site- Facilities IDIQ This notice Pre-Solicitation
Savannah River Site- Facilities IDIQ Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity