RSA Primary Substation 4, Redstone Arsenal, AL

Closed Pre-Solicitation Posted

Not the latest version. See the latest special notice from .

Solicitation number
W9127825R0020
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Engineering District Mobile is seeking a contractor to construct a high voltage Electrical Primary Substation at Redstone Arsenal in Alabama. The project encompasses comprehensive electrical infrastructure development, including installation of high voltage power transmission lines connecting the new substation to existing substations and a future Tennessee Valley Authority 161,000-volt transmission feed. Specific work requirements include building the substation, installing transformers, implementing primary and secondary voltage switchgear, constructing a distribution loop, creating a cable vault, establishing a control room, and installing associated duct banks with cabling. The project falls under NAICS code 237130 for Power and Communication Line and Related Structures Construction, with a Pre-solicitation Notice posted on January 8, 2025, and a response deadline of January 23, 2025. While specific evaluation criteria are not detailed in the notice, contractors will likely be assessed on technical capability, electrical infrastructure experience, and compliance with complex power transmission construction requirements.

The pre-solicitation notice indicates no specific set-aside designations for this contract, suggesting the opportunity is open to a broad range of qualified contractors. No incumbent contractor information is provided in the notice, and specific award value or budget range details are not disclosed. The project represents a significant electrical infrastructure development with multiple complex components, requiring specialized engineering and construction expertise in high voltage power transmission systems. The timeline and specific construction duration are not explicitly stated, but the project involves substantial electrical infrastructure work at the Redstone Arsenal military facility. Interested contractors should carefully review the forthcoming full solicitation documents to understand the complete scope, technical specifications, and submission requirements for this Department of the Army Corps of Engineers project.

Notice text

Construct a high voltage Electrical Primary Substation on Redstone Arsenal, Alabama. The project includes installation of high voltage electrical power transmission lines that will connect the new substation directly to existing substations, and to the future 3rd Tennessee Valley Authority (TVA) 161,000-volt transmission electrical power transmission feed. Work includes the substation, transformers, primary and secondary voltage switchgear with associated distribution loop, cable vault, control room and all associated duct banks with cabling.The North American Industry Classification System (NAICS) code for this project is 237130.

Notice history

Notice Type Posted
Project Labor Agreement (PLA) Market Survey - RSA Primary Substation 4, Redstone Arsenal, AL Latest special notice Special Notice
RSA Primary Substation 4, Redstone Arsenal, AL Solicitation
This notice Pre-Solicitation
RSA Primary Substation 4 - Notice of Intent (NOI) Special Notice
Substation (Primary 4), Redstone Arsenal, AL Original Pre-Solicitation