RRAD B551 and 561 Repairs
Closed Pre-Solicitation Posted
Not the latest version. See the latest special notice from .
- Solicitation number
- W9126G20B0031
- Agency
-
ENDIST Fort Worth
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Texarkana TX 75501 USA
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Fort Worth District is soliciting feedback on restoring and modernizing Buildings 551 and 561 at Red River Army Depot in Texarkana, Texas under a potential Project Labor Agreement. The project involves complete restoration and modernization of the two 91,000 square foot buildings, including structural repairs, new roofs, electrical and mechanical system upgrades, asbestos abatement, and reinstallation of removed equipment. Comments are requested on factors such as the scale and complexity of work, availability of local skilled labor, and potential cost and schedule impacts of a PLA. Responses are due by July 28, 2020.
The opportunity is set aside for total small business and has an estimated performance period of 660 days. The NAICS code is 237310 for highway, street, and bridge construction and the PSC code covers general construction. The incumbent contractor maintains the depot facilities. The budget is unspecified but work includes repairs to structural components, new roofs, electrical and mechanical systems, life safety upgrades, and material handling equipment at both buildings totaling 182,000 square feet.
Notice text
2 versions
Update #2 · Latest ·
------------------------------------------THIS IS ONLY A SOURCES SOUGHT---------------------------------------------------------
*************Sources Sought and Project Labor Agreement Survey***************
Please do not submit any Proposals at this time.
RRAD B551 and B561 Renovation
Project Description
This project comprises the complete Restoration and Modernization of Buildings B551 and B561 at Red River Army Depot (RRAD), Texarkana, TX.
Renovation will increased wall height but will not replace the building walls. Existing walls shall be reinforced to
accommodate for the renovations. Buildings 551 and 561, each provide 91k SF of depot level rebuild operation space capable of supporting multiple depot programs, including MaxxPRO, Military All-Terrain Vehicle (MATV), Family of Medium Tactical Vehicles (FMTV), Cougar, High Mobility Multipurpose Wheeled Vehicle (HMMWV), and Trailers for Army, Navy, Marines, and Field Maintenance Squadron (FMS).
B551:
1. The following equipment items shall be removed and stored for reinstallation in the building: radiant heaters, HVLS fans, blue “turbo” fans, hose reels, and electrical cord reels.
2. The existing fire alarm system components shall be removed and stored for reinstallation in the building.
3. The existing air compressors (located on the west and south sides of the building) and associated equipment and canopy shall remain for reconnection to the building.
4. Portions of walls shall be selectively demolished for the installation of new roll-up doors.
5. Repair structural components in failing state and provide a standing seam metal roof.
6. Provide a code compliant electrical distribution system.
7. Provide a code compliant fire sprinkler system.
8. Provide a code-compliant fire alarm/mass notification system for each building, utilizing the reclaimed components to the greatest extent practical.
9. Provide exhaust fans, HVLS fans, and column/wall mounted fans in each building, utilizing the reclaimed fans to the
greatest extent practical.
10. Provide a compressed air distribution system and accessories in each building.
11. Provide overhead lifting in each building.
B561:
1. The following items shall be removed and stored for reinstallation in the RM building: radiant heaters, HVLS fans, blue “turbo” fans, yellow “cool zone” fans, and LED light fixtures.
2. The existing material handling equipment (3-ton floor-mounted bridge cranes and 1- and 3-ton floor mounted jib boom cranes) shall be removed and returned to the government for disposition.
3. The existing fire alarm system components shall be removed and stored for reinstallation in the building.
4. The existing air compressor (located on the south end of the building) and its associated equipment and canopy shall remain for reconnection to the building.
5. The following existing facilities shall remain for reconnection to the building:
a. 14’x44’ restrooms, 2 each, one at the northwest corner and one at the southwest corner
b. 26’x42’ break room on the east side
c. 12’x40’ office on the east side
6. Portions of walls shall be selectively demolished for the installation of new roll-up doors.
7. Repair structural components in failing state and provide a standing seam metal roof. The standing seam metal roof system will protect the integrity of the structural components in the existing structural system.
8. Provide a code compliant electrical distribution system.
9. Provide a code compliant fire sprinkler system.
10. Provide a code-compliant fire alarm/mass notification system for each building, utilizing the reclaimed components to the greatest extent practical.
11. Provide exhaust fans, HVLS fans, and column/wall mounted fans in each building, utilizing the reclaimed fans to the greatest extent practical.
13. Provide a compressed air distribution system and accessories in each building.
14. Provide overhead lifting in each building.
Abatement of asbestos-containing materials shall be accomplished in both buildings, particularly in the renovated areas. B551 asbestos materials are roofing, caulking, foundation tar, fire doors, and the exterior wall coating (beneath paint). B561 asbestos materials are roofing, caulking, and fire doors.
Estimated POP days: 660
Place of Contract Performance:
Red River Army Depot
Texarkana , Texas 75507
United States
Update #1 ·
------------------------------------------------------THIS IS ONLY A SOURCES SOUGHT---------------------------------------------------------
Please do not submit any Proposals at this time.
RRAD B551 and B561 Renovation
Project Description
This project comprises the complete Restoration and Modernization of Buildings B551 and B561 at Red River Army Depot (RRAD), Texarkana, TX.
Renovation will increased wall height but will not replace the building walls. Existing walls shall be reinforced to
accommodate for the renovations. Buildings 551 and 561, each provide 91k SF of depot level rebuild operation space capable of supporting multiple depot programs, including MaxxPRO, Military All-Terrain Vehicle (MATV), Family of Medium Tactical Vehicles (FMTV), Cougar, High Mobility Multipurpose Wheeled Vehicle (HMMWV), and Trailers for Army, Navy, Marines, and Field Maintenance Squadron (FMS).
B551:
1. The following equipment items shall be removed and stored for reinstallation in the building: radiant heaters, HVLS fans, blue “turbo” fans, hose reels, and electrical cord reels.
2. The existing fire alarm system components shall be removed and stored for reinstallation in the building.
3. The existing air compressors (located on the west and south sides of the building) and associated equipment and canopy shall remain for reconnection to the building.
4. Portions of walls shall be selectively demolished for the installation of new roll-up doors.
5. Repair structural components in failing state and provide a standing seam metal roof.
6. Provide a code compliant electrical distribution system.
7. Provide a code compliant fire sprinkler system.
8. Provide a code-compliant fire alarm/mass notification system for each building, utilizing the reclaimed components to the greatest extent practical.
9. Provide exhaust fans, HVLS fans, and column/wall mounted fans in each building, utilizing the reclaimed fans to the
greatest extent practical.
10. Provide a compressed air distribution system and accessories in each building.
11. Provide overhead lifting in each building.
B561:
1. The following items shall be removed and stored for reinstallation in the RM building: radiant heaters, HVLS fans, blue “turbo” fans, yellow “cool zone” fans, and LED light fixtures.
2. The existing material handling equipment (3-ton floor-mounted bridge cranes and 1- and 3-ton floor mounted jib boom cranes) shall be removed and returned to the government for disposition.
3. The existing fire alarm system components shall be removed and stored for reinstallation in the building.
4. The existing air compressor (located on the south end of the building) and its associated equipment and canopy shall remain for reconnection to the building.
5. The following existing facilities shall remain for reconnection to the building:
a. 14’x44’ restrooms, 2 each, one at the northwest corner and one at the southwest corner
b. 26’x42’ break room on the east side
c. 12’x40’ office on the east side
6. Portions of walls shall be selectively demolished for the installation of new roll-up doors.
7. Repair structural components in failing state and provide a standing seam metal roof. The standing seam metal roof system will protect the integrity of the structural components in the existing structural system.
8. Provide a code compliant electrical distribution system.
9. Provide a code compliant fire sprinkler system.
10. Provide a code-compliant fire alarm/mass notification system for each building, utilizing the reclaimed components to the greatest extent practical.
11. Provide exhaust fans, HVLS fans, and column/wall mounted fans in each building, utilizing the reclaimed fans to the greatest extent practical.
13. Provide a compressed air distribution system and accessories in each building.
14. Provide overhead lifting in each building.
Abatement of asbestos-containing materials shall be accomplished in both buildings, particularly in the renovated areas. B551 asbestos materials are roofing, caulking, foundation tar, fire doors, and the exterior wall coating (beneath paint). B561 asbestos materials are roofing, caulking, and fire doors.
Estimated POP days: 660
Place of Contract Performance:
Red River Army Depot
Texarkana , Texas 75507
United States
Files
| File | Type | Posted |
|---|---|---|
| Project_Labor_Agreement_B551_B561.pdf | ||
| Project_Labor_Agreement_B551_B561.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| RRAD B551 and 561 Repairs | Special Notice | |
| RRAD B551 and 561 Repairs | Special Notice | |
| RRAD B551 and 561 Repairs | Solicitation | |
| This notice | Pre-Solicitation | |
| RRAD B551 and 561 Repairs | Pre-Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity