RPL 300 Ton Chiller Robins AFB GA

Closed Pre-Solicitation Posted

Solicitation number
FA8501SourcesSought
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Warner Robins, Georgia, United States

Notice details come from SAM.gov. Updated .

About this opportunity

Paragraph 1:

The Department of the Air Force Materiel Command Air Force Sustainment Center has a requirement to replace chiller 2 (300 ton) at B228 at Robins AFB, GA. The work includes removing the old equipment and installing a new chiller, pumps, pipes, refrigerant, and associated controls. The government is conducting market research and invites both large and small businesses to participate, including through joint ventures or teaming arrangements. Interested parties should provide documentation supporting their capabilities to meet the requirements.

Paragraph 2:

This opportunity is not set aside for any particular business size. The government has not provided any information about potential incumbent contractors or the expected award value or budget range. The key numerical details are that the requirement is for a 300-ton chiller replacement at Robins AFB, GA, and the due date for providing responses to the market research is July 23, 2024.

Notice text

INSTRUCTIONS

  1. This RFI contains a description of the requirement provided below.
  2. If after reading the description of the requirement below and you desire to participate in the Market Research, you should provide documentation that supports your company’s capability in meeting these requirements. Failure to provide documentation may result in the government being unable to adequately assess your capabilities. If you lack sufficient experience in a particular area, please provide details explaining how you would overcome the lack of experience/capabilities in order to perform that portion of the requirement (i.e., teaming, subcontracting, etc.)
  3. Identify any areas of work that your organization believes should be broken out exclusively for Small Business
  4. Both large and small businesses are encouraged to participate in this Market Research. Joint ventures or teaming arrangements are encouraged.

Requirement

The government has a requirement to replace chiller 2 (300 ton) at B228 at Robins AFB GA. Work shall include removing the old equipment to include chiller, pumps, pipping as necessary, refrigerant, and controls as necessary associated with chiller being replaced. Installation of new chiller, pumps, pipes, refrigerant, etc. as required for full operation of cooling generation.

Similar open opportunities

Opportunity Agency Set-aside Responses due
NCOM 27-003 FY 27 Trane Chiller Replacement (F2, G2 & G1) Stennis Space Center, Mississippi, United States · NAICS 333415 Shared Services Center No set-aside
Z2NZ--Turn Key Chiller Equipment (Purchase and Install) Pineville, Louisiana 71360, United States · NAICS 238220 Veterans Integrated Service Network 16 Service-Disabled Veteran-Owned Small Business
35 Ton Chiller McAlester Army Ammunition Plant1 C-Tree RdMcAlester, OK 74501 74501 · NAICS 333415 MICC Fort Drum Total Small Business
CON | Z2DA | replace chiller 1 B104 | 580-24-111 | solicitation Houston, Texas 77030, United States · NAICS 238220 Veterans Integrated Service Network 16 Service-Disabled Veteran-Owned Small Business
CON | Z1DA | replace or chillers | 580-23-105 | solicitation Houston, Texas 77030, United States · NAICS 238220 Veterans Integrated Service Network 16 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors