Roof Snow Block
Open Pre-Solicitation Posted
- Solicitation number
- FA446027Q0004
- Agency
-
Air Mobility Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 332322 Sheet Metal Work Manufacturing
- PSC
- 5650 Roofing And Siding Materials
- Place of performance
- Little Rock Air Force Base, Arkansas 72099, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force, Air Mobility Command anticipates procuring a new engineered snow and ice retention system for facility roof installation, with responses due November 27, 2026, under a Total Small Business set-aside. Work is at Building 618, Little Rock Air Force Base, where the system must provide 720 linear feet of continuous perimeter retention on a vertical standing-seam metal roof.
The system must attach exclusively to standing seams using mechanical clamps, with no roof penetrations, adhesive pads, or components that compromise the roof warranty. The attachment requires a documented holding capacity of at least 1,500 pounds per clamp on 24-gauge standing seams at a minimum installation torque of 90 inch-pounds. The main description cites 500 pounds per clamp only as an example threshold. Clamps and set screws must be solid Type 304 or 316 stainless steel, with round-point or non-cutting set screw designs. Rails must be extruded 6061-T6 structural aluminum, 1.25 to 2.00 inches high and 1.00 to 1.75 inches deep, in 6- to 8-foot sections, with a factory-applied architectural coating or anodized finish compatible with existing roof color. Ice stoppers must be extruded aluminum, with plastic or polycarbonate not acceptable. They must extend 2.25 to 3.50 inches below the rail and terminate within 0.25 inch of the roof pan. The system must accommodate 0.75 to 1.0 inch of thermal movement through concealed internal sliding expansion sleeves.
Estimated quantities are 600 clamps, 1,200 set screws, 960 ice stoppers, 750 self-drilling fasteners, and 120 internal expansion splices. Offerors must submit a project-specific layout and bill of materials identifying configuration, component quantities, attachment methods, and load distribution.
Notice text
This acquisition is a new requirement for the procurement of an engineered, continuous pipe or fence-style rail snow retention system for facility roof installation.
System Configuration: Must be a continuous horizontal pipe- or fence-style rail snow retention system capable of bridging across structural roof panels and providing continuous longitudinal perimeter retention.
Retention Capacity & Coverage: System must furnish 720 linear feet of continuous perimeter retention coverage.
Substrate Compatibility: Mounting clamps and hardware must be fully compatible with the host metal roofing profile (e.g., standing seam or exposed fastener). Attachment systems for standing-seam profiles must utilize non-penetrating clamping mechanisms to preserve the weather-tight integrity and manufacturer warranty of the roof panels.
Structural Performance Thresholds:
System components (brackets, clamps, rails, and fasteners) must be engineered and rated to resist site-specific snowpack and ice accumulation shear loads without permanent mechanical deflection.
Clamp-to-seam holding strength must meet or exceed minimum structural thresholds (e.g., capable of sustaining design loads up to 500 lbs per clamp or linear foot minimum, adjusted to site-specific engineering design calculations).
Fastening hardware must utilize round-point or non-cutting setscrew designs (e.g., 300-series stainless steel per ASTM F880) to prevent piercing, galling, or compromising protective coatings on metal roof seams.
Files
| File | Type | Posted |
|---|---|---|
| B618_Roof_Snow_and_Ice_Retention_Salient_Characteristics PDF.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity