Road 66 Reconstruction
Award Notice Posted
- Solicitation number
- AG-04KK-S-10-0003
- Agency
-
Region 6 - Pacific Northwest Region
Forest Service, Department of Agriculture
- Awarded
- to A.G. Ontko Contracting, LLC
- Set-aside
- HUBZone
Opportunity facts
- Contract number
- AG-04KK-C-10-0002 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Wallowa-Whitman National Forest Baker City, Oregon 97814, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
The award included the optional line item.
Update #2 ·
The Fish Lake Road 66 Reconstruction project is approximately 30 miles long. The project requires, but is not limited to: erosion control, consturction staking, culvert disposal, roadway excavation (re-establishing ditchline), blind drain, roadside brushing, riprap, roadway reconditioning, aggregate surfacing, culvert replacement, cattleguard cleaning and repair, signs, traffic control, and pit development. The work is to be completed while allowing public access on the road. The aggregate source is an existing quarry near the middle of the project which will be expanded. The work area is located on the Wallowa-Whitman National Forest. The NAICS code for this project is 237310, with a size standard of $33.5 million. The full detailed solicitation will be posted electronically at FedBizOpps website https://www.fbo.gov. The estimated issue/posting date of the solicitation will be June 22, 2010. At the time specified in the solicitation offerors may submit their proposals in response to the solicitation. Note that all offers meeting the requirements specified in the solicitation will be considered. Offers will be due on or around July 9, 2010 with a total award time of approximately 60 days from the date of this notice. This solicitation is set-aside 100% for HUBZone small business concerns. DUE TO FLOOD DAMAGE, WE ARE GOING TO REDUCE THE ADVERTISING PERIOD FROM 30 DAYS DOWN TO 15 DAYS.
Update #1 ·
The Fish Lake Road 66 Reconstruction project is approximately 30 miles long. The project requires, but is not limited to: erosion control, consturction staking, culvert disposal, roadway excavation (re-establishing ditchline), blind drain, roadside brushing, riprap, roadway reconditioning, aggregate surfacing, culvert replacement, cattleguard cleaning and repair, signs, traffic control, and pit development. The work is to be completed while allowing public access on the road. The aggregate source is an existing quarry near the middle of the project which will be expanded. The work area is located on the Wallowa-Whitman National Forest. The NAICS code for this project is 237310, with a size standard of $33.5 million. The full detailed solicitation will be posted electronically at FedBizOpps website https://www.fbo.gov. The estimated issue/posting date of the solicitation will be June 22, 2010. At the time specified in the solicitation offerors may submit their proposals in response to the solicitation. Note that all offers meeting the requirements specified in the solicitation will be considered. Offers will be due on or around July 6, 2010 with a total award time of approximately 60 days from the date of this notice. This solicitation is set-aside 100% for HUBZone small business concerns.
DUE TO FLOOD DAMAGE, WE ARE GOING TO REDUCE THE ADVERTISING PERIOD FROM 30 DAYS DOWN TO 15 DAYS.
Files
| File | Type | Posted |
|---|---|---|
| amend1.doc | DOC document | |
| amend1_supporting.doc | DOC document | |
| e. 19_r6_fs_6300_52.doc | DOC document | |
| d. OR2_dvb.mht | MHT file | |
| g. SF-25.pdf | ||
| c. RD66FLOOD.pdf | ||
| a. 66RoadSolicitation.doc | DOC document | |
| i. SF-25B.pdf | ||
| h. SF-25A.pdf | ||
| f. SF-24.pdf | ||
| b. Rd_66_specs.docx | DOCX document |
Show all 11
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity