Road 66 Reconstruction

Award Notice Posted

Solicitation number
AG-04KK-S-10-0003
Agency
Awarded
to A.G. Ontko Contracting, LLC
Set-aside
HUBZone

Opportunity facts

Contract number
AG-04KK-C-10-0002 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Wallowa-Whitman National Forest Baker City, Oregon 97814, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

The award included the optional line item. 

Update #2 ·

The Fish Lake Road 66 Reconstruction project is approximately 30 miles long. The project requires, but is not limited to: erosion control, consturction staking, culvert disposal, roadway excavation (re-establishing ditchline), blind drain, roadside brushing, riprap, roadway reconditioning, aggregate surfacing, culvert replacement, cattleguard cleaning and repair, signs, traffic control, and pit development. The work is to be completed while allowing public access on the road. The aggregate source is an existing quarry near the middle of the project which will be expanded. The work area is located on the Wallowa-Whitman National Forest. The NAICS code for this project is 237310, with a size standard of $33.5 million. The full detailed solicitation will be posted electronically at FedBizOpps website https://www.fbo.gov. The estimated issue/posting date of the solicitation will be June 22, 2010. At the time specified in the solicitation offerors may submit their proposals in response to the solicitation. Note that all offers meeting the requirements specified in the solicitation will be considered. Offers will be due on or around July 9, 2010 with a total award time of approximately 60 days from the date of this notice. This solicitation is set-aside 100% for HUBZone small business concerns. DUE TO FLOOD DAMAGE, WE ARE GOING TO REDUCE THE ADVERTISING PERIOD FROM 30 DAYS DOWN TO 15 DAYS.

Update #1 ·

The Fish Lake Road 66 Reconstruction project is approximately 30 miles long. The project requires, but is not limited to: erosion control, consturction staking, culvert disposal, roadway excavation (re-establishing ditchline), blind drain, roadside brushing, riprap, roadway reconditioning, aggregate surfacing, culvert replacement, cattleguard cleaning and repair, signs, traffic control, and pit development. The work is to be completed while allowing public access on the road. The aggregate source is an existing quarry near the middle of the project which will be expanded. The work area is located on the Wallowa-Whitman National Forest. The NAICS code for this project is 237310, with a size standard of $33.5 million. The full detailed solicitation will be posted electronically at FedBizOpps website https://www.fbo.gov. The estimated issue/posting date of the solicitation will be June 22, 2010. At the time specified in the solicitation offerors may submit their proposals in response to the solicitation. Note that all offers meeting the requirements specified in the solicitation will be considered. Offers will be due on or around July 6, 2010 with a total award time of approximately 60 days from the date of this notice. This solicitation is set-aside 100% for HUBZone small business concerns.





DUE TO FLOOD DAMAGE, WE ARE GOING TO REDUCE THE ADVERTISING PERIOD FROM 30 DAYS DOWN TO 15 DAYS.

Files

File Type Posted
amend1.doc DOC document
amend1_supporting.doc DOC document
e. 19_r6_fs_6300_52.doc DOC document
d. OR2_dvb.mht MHT file
g. SF-25.pdf PDF
c. RD66FLOOD.pdf PDF
a. 66RoadSolicitation.doc DOC document
i. SF-25B.pdf PDF
h. SF-25A.pdf PDF
f. SF-24.pdf PDF
b. Rd_66_specs.docx DOCX document
Show all 11

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity