Riprap Overlay at Pomona Lake Project Dam

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912DQ25BA001
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Engineering District Kansas City is soliciting construction services for the Riprap Overlay at Pomona Lake Project Dam located near Pomona, Kansas in Osage County. The project will involve regrading and overlaying damaged portions of the upstream embankment slope with bedding and riprap, including repair of access roads, debris removal, and other incidental work. A mandatory site visit is scheduled for 13 March 2025 at 10 AM, with proposals due by 18 April 2025. While specific evaluation criteria were not explicitly detailed in the documentation, the solicitation suggests technical capability and adherence to project specifications will be key assessment factors. Potential bidders must carefully review all project documentation, including the amendment and questions/answers file, to ensure comprehensive understanding of the project requirements.

The contract is exclusively set aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) contractors, limiting competition to qualifying firms. Five contractors have already expressed interest, including CECOS Group, LLC; RKE Contractors; Fidelis-BBD, LLC; Junot Group & Kolb Grading; and Ozark Dumey JV, LLC. The government estimate ranges from approximately $1.8 million to $7.8 million, depending on the specific project section. The project falls under NAICS category 237990 for Other Heavy and Civil Engineering Construction and PSC category Y1KA for Construction of Dams. Performance will occur at the Pomona Dam site in Osage County, Kansas, with contractors required to provide corporate bid security at 20% and demonstrate specialized capabilities in dam infrastructure rehabilitation and riprap overlay techniques.

Notice text

8 versions

Update #8 · Latest ·

The bid abstract is posted. 

This solicitation is amended (0005) to update the specifications and extend the bid due date to April 18, 2025 at 9am CDT. This solicitation is amended (0004) to extend the bid due date to April 10, 2025 at 1pm CDT. The solicitation is amended (0003) to revise the bid schedule to align with the specifications and add a total all CLINs line; and to provide specification 01 50 00, Section 2.2.2- Attachment 1. The solicitation is amended (0002) to remove the beach parking area from CLIN 0001 of the bid schedule and beach parking and staging area from CLIN 0001 of the supplemental bid schedule.The solicitation is amended to comply with the President?s Executive Orders, and revise specifications.CONSTRUCTION SERVICES FOR POMONA DAM. THE PROJECT WILL CONSIST OF REGRADING, AND OVERLAYING THE DAMAGED PORTIONS OF THE UPSTREAM EMBANKMENT SLOPE WITH BEDDING AND RIPRAP, REPAIRING ANY ACCESS ROADS AS NECESSARY, DEBRIS REMOVAL AND ANY OTHER INCIDENTAL WORK. THE WORK WILL TAKE PLACE NEAR POMONA, KS IN OSAGE COUNTY. THIS REQUIREMENT IS SET ASIDE FOR SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB). AN ORGANIZED SITE VISIT HAS BEEN SCHEDULED FOR 13 MARCH AT 10 AM.

Update #7 ·

This solicitation is amended (0005) to update the specifications and extend the bid due date to April 18, 2025 at 9am CDT. This solicitation is amended (0004) to extend the bid due date to April 10, 2025 at 1pm CDT. The solicitation is amended (0003) to revise the bid schedule to align with the specifications and add a total all CLINs line; and to provide specification 01 50 00, Section 2.2.2- Attachment 1. The solicitation is amended (0002) to remove the beach parking area from CLIN 0001 of the bid schedule and beach parking and staging area from CLIN 0001 of the supplemental bid schedule.The solicitation is amended to comply with the President?s Executive Orders, and revise specifications.CONSTRUCTION SERVICES FOR POMONA DAM. THE PROJECT WILL CONSIST OF REGRADING, AND OVERLAYING THE DAMAGED PORTIONS OF THE UPSTREAM EMBANKMENT SLOPE WITH BEDDING AND RIPRAP, REPAIRING ANY ACCESS ROADS AS NECESSARY, DEBRIS REMOVAL AND ANY OTHER INCIDENTAL WORK. THE WORK WILL TAKE PLACE NEAR POMONA, KS IN OSAGE COUNTY. THIS REQUIREMENT IS SET ASIDE FOR SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB). AN ORGANIZED SITE VISIT HAS BEEN SCHEDULED FOR 13 MARCH AT 10 AM.

Update #6 ·

Additional questions and answers posted in attachments. The solicitation is amended (0003) to revise the bid schedule to align with the specifications and add a total all CLINs line; and to provide specification 01 50 00, Section 2.2.2- Attachment 1. The solicitation is amended (0002) to remove the beach parking area from CLIN 0001 of the bid schedule and beach parking and staging area from CLIN 0001 of the supplemental bid schedule.The solicitation is amended to comply with the President?s Executive Orders, and revise specifications.CONSTRUCTION SERVICES FOR POMONA DAM. THE PROJECT WILL CONSIST OF REGRADING, AND OVERLAYING THE DAMAGED PORTIONS OF THE UPSTREAM EMBANKMENT SLOPE WITH BEDDING AND RIPRAP, REPAIRING ANY ACCESS ROADS AS NECESSARY, DEBRIS REMOVAL AND ANY OTHER INCIDENTAL WORK. THE WORK WILL TAKE PLACE NEAR POMONA, KS IN OSAGE COUNTY. THIS REQUIREMENT IS SET ASIDE FOR SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB). AN ORGANIZED SITE VISIT HAS BEEN SCHEDULED FOR 13 MARCH AT 10 AM.

Update #5 ·

The solicitation is amended (0003) to revise the bid schedule to align with the specifications and add a total all CLINs line; and to provide specification 01 50 00, Section 2.2.2- Attachment 1. The solicitation is amended (0002) to remove the beach parking area from CLIN 0001 of the bid schedule and beach parking and staging area from CLIN 0001 of the supplemental bid schedule.The solicitation is amended to comply with the President?s Executive Orders, and revise specifications.CONSTRUCTION SERVICES FOR POMONA DAM. THE PROJECT WILL CONSIST OF REGRADING, AND OVERLAYING THE DAMAGED PORTIONS OF THE UPSTREAM EMBANKMENT SLOPE WITH BEDDING AND RIPRAP, REPAIRING ANY ACCESS ROADS AS NECESSARY, DEBRIS REMOVAL AND ANY OTHER INCIDENTAL WORK. THE WORK WILL TAKE PLACE NEAR POMONA, KS IN OSAGE COUNTY. THIS REQUIREMENT IS SET ASIDE FOR SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB). AN ORGANIZED SITE VISIT HAS BEEN SCHEDULED FOR 13 MARCH AT 10 AM.

Update #4 ·

The solicitation is amended (0002) to remove the beach parking area from CLIN 0001 of the bid schedule and beach parking and staging area from CLIN 0001 of the supplemental bid schedule.The solicitation is amended to comply with the President?s Executive Orders, and revise specifications.CONSTRUCTION SERVICES FOR POMONA DAM. THE PROJECT WILL CONSIST OF REGRADING, AND OVERLAYING THE DAMAGED PORTIONS OF THE UPSTREAM EMBANKMENT SLOPE WITH BEDDING AND RIPRAP, REPAIRING ANY ACCESS ROADS AS NECESSARY, DEBRIS REMOVAL AND ANY OTHER INCIDENTAL WORK. THE WORK WILL TAKE PLACE NEAR POMONA, KS IN OSAGE COUNTY. THIS REQUIREMENT IS SET ASIDE FOR SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB). AN ORGANIZED SITE VISIT HAS BEEN SCHEDULED FOR 13 MARCH AT 10 AM.

Update #3 ·

The solicitation is amended to comply with the President?s Executive Orders, and revise specifications.CONSTRUCTION SERVICES FOR POMONA DAM. THE PROJECT WILL CONSIST OF REGRADING, AND OVERLAYING THE DAMAGED PORTIONS OF THE UPSTREAM EMBANKMENT SLOPE WITH BEDDING AND RIPRAP, REPAIRING ANY ACCESS ROADS AS NECESSARY, DEBRIS REMOVAL AND ANY OTHER INCIDENTAL WORK. THE WORK WILL TAKE PLACE NEAR POMONA, KS IN OSAGE COUNTY. THIS REQUIREMENT IS SET ASIDE FOR SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB). AN ORGANIZED SITE VISIT HAS BEEN SCHEDULED FOR 13 MARCH AT 10 AM.

Update #2 ·

The site visit sign-in sheet is posted. 

CONSTRUCTION SERVICES FOR POMONA DAM. THE PROJECT WILL CONSIST OF REGRADING, AND OVERLAYING THE DAMAGED PORTIONS OF THE UPSTREAM EMBANKMENT SLOPE WITH BEDDING AND RIPRAP, REPAIRING ANY ACCESS ROADS AS NECESSARY, DEBRIS REMOVAL AND ANY OTHER INCIDENTAL WORK. THE WORK WILL TAKE PLACE NEAR POMONA, KS IN OSAGE COUNTY. THIS REQUIREMENT IS SET ASIDE FOR SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB). AN ORGANIZED SITE VISIT HAS BEEN SCHEDULED FOR 13 MARCH AT 10 AM.

Update #1 ·

CONSTRUCTION SERVICES FOR POMONA DAM. THE PROJECT WILL CONSIST OF REGRADING, AND OVERLAYING THE DAMAGED PORTIONS OF THE UPSTREAM EMBANKMENT SLOPE WITH BEDDING AND RIPRAP, REPAIRING ANY ACCESS ROADS AS NECESSARY, DEBRIS REMOVAL AND ANY OTHER INCIDENTAL WORK. THE WORK WILL TAKE PLACE NEAR POMONA, KS IN OSAGE COUNTY. THIS REQUIREMENT IS SET ASIDE FOR SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB). AN ORGANIZED SITE VISIT HAS BEEN SCHEDULED FOR 13 MARCH AT 10 AM.

Files

File Type Posted
Abstract of Offers-W912DQ25BA001.pdf PDF
Additional Questions_Answers.pdf PDF
Site Visit Sign-In Sheet.pdf PDF

Notice history

Notice Type Posted
Riprap Overlay at Pomona Lake Project Dam Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Lock and DAM 25 new 1, 200 FT lock navigation and ecosystem sustainability program (NESP) Lock and Dam 25 Site, 10 Sandy Slough Road, Winfield, Missouri 63389 63389 · NAICS 237990 ENDIST St Louis No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors