This document is a Questions and Answers file for the Pomona Dam Riprap Overlay Project. The file addresses several key clarifications from potential bidders, including confirmation that the project is sales tax exempt, details about quarry operations involving rock blasting and excavation, and scope clarifications for site preparation and parking lot improvements. A specific inquiry was also made regarding core samples for an asphalt roadway, which the contracting agency addressed by noting an amendment would be posted to provide the referenced attachment. The questions indicate nuanced details about project staging areas and specific construction requirements that bidders sought to understand more precisely before submission.

View the file

Other files

File Type Posted
Abstract of Offers-W912DQ25BA001.pdf PDF
Site Visit Sign-In Sheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions/Answers

Please confirm if this project is sales tax exempt.

A: Yes

Is the limitation for quarrying rock related to blasting only? If so, can rock be blasted outside of the exclusion period, then excavated during the exclusion period?

A: Please see specification 35 31 19 section 2.2.1.2 Quarry Operations. Quarry exclusions involve blasting and excavating of the rock.

In the supplemental Bid Schedule, "Parking Lot Improvements" are still included, but "Beach Parking and Staging Area" is not included. What scopes do each of these items cover? Also, CLIN 0001 of this Bid Schedule includes the "staging area". CLIN 0001 of the supplemental Bid Schedule excludes the "staging area". Is a staging area included in this project?

A: “Site prep” in the supplemental bid schedule includes all work required to prepare and stage site for construction, minus the beach “parking lot improvements” which is a separate line item, please see GC101 of plans.

I’m looking in the specifications for the upcoming Pomona Dam Rip Rap Overlay Project and not able to find the attachment for the asphalt roadway corings. On page 193 of the specifications, 01 50 00 – 7 paragraph 2.2.2 it mentions that seven core samples were obtained from Michigan Valley Parkway to analyze the existing conditions of the haul route. It goes on to say that there is an attachment at the end of this section, but I’m not able to find the attachment. Can you please provide the attachment via an amendment?

A: Amendment posted to provide 01 50 00 section 2.2.2 - Attachment 1

In the supplemental Bid Schedule, "Parking Lot Improvements" are still included, but "Beach Parking and Staging Area" is not included. What scopes do each of these items cover? Also, CLIN 0001 of this Bid Schedule includes the "staging area". CLIN 0001 of the supplemental Bid Schedule excludes the "staging area". Is a staging area included in this project?

A: “Site prep” in the supplemental bid schedule includes all work required to prepare and stage site for construction, minus the beach “parking lot improvements” which is a separate line item, please see GC101 of plans.