RFI sources sought - availability of HUBZONE contractors for flooring
Award Notice Posted
- Solicitation number
- W911SA12B0010
- Agency
-
MICC Fort McCoy
Mission and Installation Contracting Command, Department of Defense
- Awarded
- to C3T, Inc.
- Set-aside
- HUBZone
Opportunity facts
- Contract number
- W911SA12D0015 Federal IDV award
- NAICS code
- 238330 Flooring Contractors
- PSC
- Not on record
- Place of performance
- Micc - Fort McCoy (RC - North) Building 1108 S R St. Fort McCoy WI 54656 US
Notice details come from SAM.gov. Updated .
Notice text
This is a request for information notice only. This is not a request for proposals and no contract shall be awarded.
The Mission and Installation Contracting Command Center, Fort McCoy, WI is conducting market research in order to determine if a HUBZone set aside action is feasible for this acquisition. The type of solicitation issued will depend upon the responses to this synopsis. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests. Mission and Installation Contracting Command Center's determination on how to complete the proposed requirement will be based on responses to this notice and is the sole discretion of the Contracting Officer.
Work to be performed under this firm, fixed-price indefinite delivery indefinite quantity (IDIQ) type contract will be within the North American Industry Classification System (NAICS) Code 238330- Flooring Contractors with a small business size standard of $14 million. Project Magnitude is more than $10 million.
Contractor shall provide all labor, equipment, materials, transportation, and supervision necessary to perform the work under this contract including but not limited to:
A. REMOVAL WORK: Remove all items indicated on the drawings and in the specifications and dispose of off Post at the Contractor's expense including but not limited to;
1. Removal of existing floor system coverings/finishes.
2. Removal of existing plumbing fixtures to be saved for reinstallation. Construction Inspector will verify all fixtures are in working order before fixtures are removed.
3. Removal of existing underlayment flooring systems.
4. Removal of rotted areas using line item accounting method.
B. NEW WORK: Contractor shall provide all labor, equipment, materials, transportation, and supervision necessary to perform the work under this contract including but not limited to;
1. Installation of new flooring system coverings/finishes and underlayment.
2. Reinstall all items as prescribed for each individual facility.
C. REPAIR WORK: Contractor shall repair any damages caused by this construction, including but not limited to;
1. Repair any existing construction which is damaged.
2. Repair any landscaping including trees, shrubs, flowers, and grass.
3. Repair vehicle ruts. Level the ruts, place topsoil, and seed the disturbed areas according to the specifications.
Responses to this announcement must be received no later than 12:00 pm on Friday 15 June 2012.
Responses should be e-mailed to Ross R. Hedeen at ross.r.hedeen.civ@mail.mil or faxed to (608) 388-3950. Responses should include the following:
1) Reference Sources Sought Number
2) Company Name and point of contact information to include name, e-mail address, and telephone and fax numbers
3) DUNS number
4) The socioeconomic status of the company (i.e. HUBZone small business, 8(a) business, etc.)
5) A written narrative of contractors' capability to provide the requirements listed above.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Changes to install, repair and maintain flooring at fort mccoy, WI | Award Notice | |
| Changes to install, repair and maintain flooring at fort mccoy, WI | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity