About this opportunity

This solicitation from the Naval Supply Systems Command seeks repair and maintenance services for certain assets. The contractor must repair assets within 110 days of receipt and report all transactions within five business days. The contractor must also provide a monthly throughput constraint for each national stock number and obtain acceptance of all repairs by January 2024. Evaluation will consider the contractor's ability to meet the required turnaround time.

There is no set-aside designated for this requirement. The work involves repair and maintenance of unspecified assets and must be performed at the contractor's facility. The contractor shall repair an estimated quantity of assets per month after award, which is set to occur within 365 days of solicitation. Repair prices are pre-negotiated based on meeting the turnaround time, and a reconciliation will occur after all induced assets are accepted. Early and incremental deliveries are preferred.

Notice text

CONTACT INFORMATION|4|N763.07|WRA|215-697-3606|TAYLOR.TYL@NAVY.MIL|

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||

HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X||||||||

INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X||||||||||||||

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|SOURCE/SOURCE|TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|TBD||||||||

NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||

EQUAL OPPORTUNITY (SEP 2016)|2|||

WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|60 DAYS AFTER DISCOVERY OF DEFECT|||||

EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC (JAN 23)|3||||

ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13||||||||||||||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (DEC 2022))|3||||

BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1||

ROYALTY INFORMATION (APR 1984)|1||

ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13| | ||||||||||||

NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|

Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition

asset at the contractor's facili as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular

business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.

The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.

Required RTAT: #110 days after receipt of asset

Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of #0000 per month reflects no throughput constraint.

Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.

Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such

prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.

ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR

SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN.

Early and incremental deliveries accepted and preferred.

Similar open opportunities

Opportunity Agency Set-aside Responses due
Frequency multiplie, power supply, waveguide switch Mechanicsburg, Pennsylvania 17050, United States · NAICS 334290 Naval Supply Systems Command No set-aside
Switch NAICS 335313 Naval Supply Systems Command No set-aside
Window AY NAICS 336413 Naval Supply Systems Command No set-aside
Repair, NIIN 016891302, QTY 4 Philadelphia, Pennsylvania, United States · NAICS 336413 Naval Supply Systems Command No set-aside
Single channel rcvr NAICS 336413 Naval Supply Systems Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors