Rewire Power and Data- Small Arms Range

Closed Solicitation Posted

Solicitation number
W912DW25BA014
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Place of performance
Joint Base Lewis McChord, Washington 98433, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Seattle District is procuring construction services to repair and upgrade power and data systems for small arms firing ranges at Joint Base Lewis-McChord, Washington. The project involves rewiring existing power and communications cables to existing targets on Ranges 1 and 5 to accommodate the new Army Future Army System Integrated Targets (FASIT), including modifications to 112 target emplacements on each range with new data panels, load centers, and power outlets for future target and thermal blanket installations. Contractors must meet specific technical requirements for electrical installations, cable routing, underground conduits, telecommunications infrastructure, and comply with extensive environmental, safety, and operational security requirements including anti-terrorism training and base access protocols. The contract will be awarded as a firm fixed-price arrangement based solely on price and price-related factors to the most advantageous, responsive, and responsible bidder. Multiple amendments extended the original August 19, 2025 deadline, with bids ultimately due September 2, 2025, and bid results were published on September 3, 2025 showing six companies submitted proposals.

This solicitation is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses, with no incumbent contractors identified in the documentation. The contract's estimated magnitude ranges between $1.5 million and $4.5 million, including both base and optional contract line items, with a statutory equipment limitation of $291,900 per range. The bid results reveal significant pricing variation among the six respondents, ranging from Boomtown Services' lowest bid of $2,299,810 to IGE's highest bid of $6,148,000, with other bidders including Bear Wood Windows, Kaige Electric, Apex Electrical, and Veterans Northwest submitting bids between approximately $2.9-3.2 million. The contract structure includes a base item for Range 5 and an optional item for Range 1, with a 270-calendar day completion timeline from Notice to Proceed (potentially extending to 365 days if option items are awarded later) and liquidated damages of $1,557.47 per calendar day for delays. Work will be performed at Joint Base Lewis-McChord in Washington State, with contractors required to complete all installations by September 1, 2025.

Notice text

7 versions

Update #7 · Latest ·

9/3/2025 A spreadsheet showing results of participating vendor bids has been provided. See document "(SAM) BIDS W912DW25BA014 Rewire Power and Data Ranges"

8/22/2025 Amendment 0004- THIS AMENDMENT 1) REPLACES SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_14AUG2025 WITH SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_21AUG2025 AND 2) EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 26 AUG 2025 TO 2 SEPT 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 2 SEPT 2025. SEE SOLICITATION AMENDMENT - W912DW25BA0140004.

8/20/2025 Amendment 0003- THIS AMENDMENT REPLACES "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS" WITH "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS (20AUG2025)". CHANGES MADE TO "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS (20AUG2025)" ARE SHOWN IN TRACK CHANGES. THIS AMENDMENT ALSO OPENS PROJNET FOR VENDOR
QUESTIONS UNTIL 8 AM, FRIDAY 22 AUGUST 2025 (LOCAL TIME).

8/15/2025 Amendment 0002- THIS AMENDMENT 1) REPLACES ATTACHMENT "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1" DATED JULY 21, 2025 WITH "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_14AUG2025" DATED AUG 14 2025 AND 2) REPLACES "SECTION 00 73 00
SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 07_18_2025" WITH "SECTION 00 73 00 SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 08_15_2025". See attachments. 

8/11/2025 Amendment 0001- THIS AMENDMENT EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 19 AUG 2025 TO 26 AUG 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 26 AUG 2025. See attachment "Solicitation Amendment W912DW25BA0140001 SF 30".

8/1/2025: Organized Site Visit sign in rosters have been added: See attachments "Pre Bid Site Visit 31July25" and "Pre Bid Site Visit 1Aug25".

CONSTRUCTION PROJECT TO REPAIR EXISTING POWER AND COMMUNICATIONS CABLES TO EXISTING TARGETS ON RANGE TO ACCEPT THE NEW ARMY FUTURE ARMY SYSTEM INTEGRATED TARGETS (FASIT). THIS PROJECT WILL INCLUDE MODIFICATIONS OF EXISTING TARGET EMPLACEMENTS TO PROVIDE A NEW DATA PANEL, LOAD CENTER AND NEW POWER OUTLETS FOR THE FUTURE INSTALLATION OF TARGET AND THERMAL BLANKETS.

Update #6 ·

8/22/2025 Amendment 0004- THIS AMENDMENT 1) REPLACES SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_14AUG2025 WITH SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_21AUG2025 AND 2) EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 26 AUG 2025 TO 2 SEPT 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 2 SEPT 2025. SEE SOLICITATION AMENDMENT - W912DW25BA0140004.

8/20/2025 Amendment 0003- THIS AMENDMENT REPLACES "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS" WITH "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS (20AUG2025)". CHANGES MADE TO "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS (20AUG2025)" ARE SHOWN IN TRACK CHANGES. THIS AMENDMENT ALSO OPENS PROJNET FOR VENDOR
QUESTIONS UNTIL 8 AM, FRIDAY 22 AUGUST 2025 (LOCAL TIME).

8/15/2025 Amendment 0002- THIS AMENDMENT 1) REPLACES ATTACHMENT "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1" DATED JULY 21, 2025 WITH "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_14AUG2025" DATED AUG 14 2025 AND 2) REPLACES "SECTION 00 73 00
SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 07_18_2025" WITH "SECTION 00 73 00 SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 08_15_2025". See attachments. 

8/11/2025 Amendment 0001- THIS AMENDMENT EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 19 AUG 2025 TO 26 AUG 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 26 AUG 2025. See attachment "Solicitation Amendment W912DW25BA0140001 SF 30".

8/1/2025: Organized Site Visit sign in rosters have been added: See attachments "Pre Bid Site Visit 31July25" and "Pre Bid Site Visit 1Aug25".

CONSTRUCTION PROJECT TO REPAIR EXISTING POWER AND COMMUNICATIONS CABLES TO EXISTING TARGETS ON RANGE TO ACCEPT THE NEW ARMY FUTURE ARMY SYSTEM INTEGRATED TARGETS (FASIT). THIS PROJECT WILL INCLUDE MODIFICATIONS OF EXISTING TARGET EMPLACEMENTS TO PROVIDE A NEW DATA PANEL, LOAD CENTER AND NEW POWER OUTLETS FOR THE FUTURE INSTALLATION OF TARGET AND THERMAL BLANKETS.

Update #5 ·

8/20/2025 Amendment 0003- THIS AMENDMENT REPLACES "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS" WITH "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS (20AUG2025)". CHANGES MADE TO "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS (20AUG2025)" ARE SHOWN IN TRACK CHANGES. THIS AMENDMENT ALSO OPENS PROJNET FOR VENDOR
QUESTIONS UNTIL 8 AM, FRIDAY 22 AUGUST 2025 (LOCAL TIME).

8/15/2025 Amendment 0002- THIS AMENDMENT 1) REPLACES ATTACHMENT "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1" DATED JULY 21, 2025 WITH "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_14AUG2025" DATED AUG 14 2025 AND 2) REPLACES "SECTION 00 73 00
SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 07_18_2025" WITH "SECTION 00 73 00 SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 08_15_2025". See attachments. 

8/11/2025 Amendment 0001- THIS AMENDMENT EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 19 AUG 2025 TO 26 AUG 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 26 AUG 2025. See attachment "Solicitation Amendment W912DW25BA0140001 SF 30".

8/1/2025: Organized Site Visit sign in rosters have been added: See attachments "Pre Bid Site Visit 31July25" and "Pre Bid Site Visit 1Aug25".

CONSTRUCTION PROJECT TO REPAIR EXISTING POWER AND COMMUNICATIONS CABLES TO EXISTING TARGETS ON RANGE TO ACCEPT THE NEW ARMY FUTURE ARMY SYSTEM INTEGRATED TARGETS (FASIT). THIS PROJECT WILL INCLUDE MODIFICATIONS OF EXISTING TARGET EMPLACEMENTS TO PROVIDE A NEW DATA PANEL, LOAD CENTER AND NEW POWER OUTLETS FOR THE FUTURE INSTALLATION OF TARGET AND THERMAL BLANKETS.

Update #4 ·

8/15/2025 Amendment 0002- THIS AMENDMENT 1) REPLACES ATTACHMENT "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1" DATED JULY 21, 2025 WITH "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_14AUG2025" DATED AUG 14 2025 AND 2) REPLACES "SECTION 00 73 00
SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 07_18_2025" WITH "SECTION 00 73 00 SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 08_15_2025". See attachments. 

8/11/2025 Amendment 0001- THIS AMENDMENT EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 19 AUG 2025 TO 26 AUG 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 26 AUG 2025. See attachment "Solicitation Amendment W912DW25BA0140001 SF 30".

8/1/2025: Organized Site Visit sign in rosters have been added: See attachments "Pre Bid Site Visit 31July25" and "Pre Bid Site Visit 1Aug25".

CONSTRUCTION PROJECT TO REPAIR EXISTING POWER AND COMMUNICATIONS CABLES TO EXISTING TARGETS ON RANGE TO ACCEPT THE NEW ARMY FUTURE ARMY SYSTEM INTEGRATED TARGETS (FASIT). THIS PROJECT WILL INCLUDE MODIFICATIONS OF EXISTING TARGET EMPLACEMENTS TO PROVIDE A NEW DATA PANEL, LOAD CENTER AND NEW POWER OUTLETS FOR THE FUTURE INSTALLATION OF TARGET AND THERMAL BLANKETS.

Update #3 ·

8/11/2025 Amendment 0001- THIS AMENDMENT EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 19 AUG 2025 TO 26 AUG 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 26 AUG 2025. See attachment "Solicitation Amendment W912DW25BA0140001 SF 30".

8/1/2025: Organized Site Visit sign in rosters have been added: See attachments "Pre Bid Site Visit 31July25" and "Pre Bid Site Visit 1Aug25".

CONSTRUCTION PROJECT TO REPAIR EXISTING POWER AND COMMUNICATIONS CABLES TO EXISTING TARGETS ON RANGE TO ACCEPT THE NEW ARMY FUTURE ARMY SYSTEM INTEGRATED TARGETS (FASIT). THIS PROJECT WILL INCLUDE MODIFICATIONS OF EXISTING TARGET EMPLACEMENTS TO PROVIDE A NEW DATA PANEL, LOAD CENTER AND NEW POWER OUTLETS FOR THE FUTURE INSTALLATION OF TARGET AND THERMAL BLANKETS.

Update #2 ·

8/1/2025: Organized Site Visit sign in rosters have been added: See attachments "Pre Bid Site Visit 31July25" and "Pre Bid Site Visit 1Aug25".

CONSTRUCTION PROJECT TO REPAIR EXISTING POWER AND COMMUNICATIONS CABLES TO EXISTING TARGETS ON RANGE TO ACCEPT THE NEW ARMY FUTURE ARMY SYSTEM INTEGRATED TARGETS (FASIT). THIS PROJECT WILL INCLUDE MODIFICATIONS OF EXISTING TARGET EMPLACEMENTS TO PROVIDE A NEW DATA PANEL, LOAD CENTER AND NEW POWER OUTLETS FOR THE FUTURE INSTALLATION OF TARGET AND THERMAL BLANKETS.

Update #1 ·

CONSTRUCTION PROJECT TO REPAIR EXISTING POWER AND COMMUNICATIONS CABLES TO EXISTING TARGETS ON RANGE TO ACCEPT THE NEW ARMY FUTURE ARMY SYSTEM INTEGRATED TARGETS (FASIT). THIS PROJECT WILL INCLUDE MODIFICATIONS OF EXISTING TARGET EMPLACEMENTS TO PROVIDE A NEW DATA PANEL, LOAD CENTER AND NEW POWER OUTLETS FOR THE FUTURE INSTALLATION OF TARGET AND THERMAL BLANKETS.

Files

Show all 19

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Rewire Power and Data- Small Arms Range Pre-Solicitation
Rewire Power and Data- Small Arms Range Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3223 and 3224 Joint Base Lewis McChord, Washington, United States · NAICS 236220 ENDIST Seattle Total Small Business
(MATOC) Joint Base Lewis-McChord (JBLM), Washington Joint Base Lewis McChord, Washington 98433, United States · NAICS 236220 Department of the Army Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity