Revised Construct Readiness Center - Sources Sought

Closed Special Notice Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W912JB-23-B-0001
Agency
Michigan National Guard Army National Guard, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Y1AZ Construction Of Other Administrative Facilities And Service Buildings
Place of performance
Grayling, Michigan 49738, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The federal contract opportunity involves the construction of a National Guard Readiness Center, designed to support the training, administrative, and logistical needs of the MI ARNG. The project, estimated to cost between $25,000,000 and $100,000,000, will include all utility services, information systems, fire detection and alarm systems, roads, walls, curbs, storm drainage, parking areas, and site improvements. The solicitation is anticipated for Summer/Fall 2023, with construction expected to start in 2024.

  1. Construction of a National Guard Readiness Center.
  2. Provision of all utility services.
  3. Installation of information systems, fire detection, and alarm systems.
  4. Construction of roads, walls, curbs, storm drainage, and parking areas.
  5. Site improvements as required by the project scope.

Notice text

2 versions

Update #2 · Latest ·

Anticipated Solicitation: Summer/Fall 2023
Anticipated Construction: 2024
This project will be specially designed National Guard Readiness Center of permanent construction that supports the training, administrative needs, and logistical requirements of the MI ARNG. Planning considerations for this building include backup power generation and vehicle parking for both organizational and privately owned vehicles. The proposed design will include all utility services, information systems, fire detection and alarm systems, roads, walls, curbs, storm drainage, parking areas, and site improvements required by the project scope. The new readiness center will be designed to meet Industry Standards as well as all local, State, and Federal building codes and as per Public Law 90-480.The new facility will be designed to a minimum life of 50 years in accordance with DoD's Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance as per ASA (IE&E) Sustainable Design and Development Policy updated 2017. Access for individuals with disabilities will be provided.Antiterrorism measures in accordance with the DoD Minimum Antiterrorism forbuildingstandards will be provided. This project will comply with the Army 1 SQFT for 1SQFT disposal
policy through disposal of 52,153 SQFT.This project includes the design of up to 46,831 SQFT of new National GuardReadiness Center that supports training, administrative, and logistical requirements for the MIARNG.
***** THIS IS NOT A SOLICATION***

Update #1 ·

Anticipated Solicitation: Summer/Fall 2023
Anticipated Construction: 2024
Magnitude of Construction: Between $25,000,000 and $100,000,000

This project will be specially designed National Guard Readiness Center of permanent construction that supports the training, administrative needs, and logistical requirements of the MI ARNG. Planning considerations for this building include backup power generation and vehicle parking for both organizational and privately owned vehicles. The proposed design will include all utility services, information systems, fire detection and alarm systems, roads, walls, curbs, storm drainage, parking areas, and site improvements required by the project scope. The new readiness center will be designed to meet Industry Standards as well as all local, State, and Federal building codes and as per Public Law 90-480.The new facility will be designed to a minimum life of 50 years in accordance with DoD's Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance as per ASA (IE&E) Sustainable Design and Development Policy updated 2017. Access for individuals with disabilities will be provided.Antiterrorism measures in accordance with the DoD Minimum Antiterrorism forbuildingstandards will be provided. This project will comply with the Army 1 SQFT for 1SQFT disposal
policy through disposal of 52,153 SQFT.This project includes the design of up to 46,831 SQFT of new National GuardReadiness Center that supports training, administrative, and logistical requirements for the MIARNG.
***** THIS IS NOT A SOLICATION***

Attachments

Files attached to this notice, newest first
File Type Posted
MILCON_SOURCES SOUGHT NOTICE.pdf PDF
MILCON_SOURCES SOUGHT NOTICE.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Construct Readiness Center Award Award Notice
Construct Readiness Center Latest solicitation Solicitation
Construct Readiness Center Pre-Solicitation
Revised Construct Readiness Center - Sources Sought This notice Special Notice
Construct Readiness Center Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity