AWARD NOTICE of Restroom Renovation for ZLC ARTCC located at 2150 West 700 North, Salt Lake City, UT
Closed Solicitation Posted
- Solicitation number
- 697DCK-20-R-00186
- Agency
-
Southwestern Region
Federal Aviation Administration, Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Salt Lake City, Utah 84116, United States
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
AWARD NOTICE of Restroom Renovation for ZLC ARTCC located at 2150 West 700 North, Salt Lake City UT
Awardee: Guardian Construction, Inc.
Awardee Address: 360 S Fort Lane, Bldg. 1, Suite A, Layton, UT 84041
Award No.: 697DCK-21-C-00249
Award Total: $191,499.00
________________________________________________________________________________________________________
Amendment 0003
The purpose of this amendment is to:
1. Incorporate revised mask standard effective 5-27-21. The revised mask standard is in addition to the Special Contract Requirement: COVID-19 (Construction Only) clause provided in Amendment 0002.
2. Incorporate the questions and answers for SIR 697DCK-20-R-00186
________________________________________________________________________________________________________
Amendment 0002
This amendment is to:
1. Incorporate AMS Clause 3.6.4-24 Covered Telecommunications Equipment or Services - Representation (JAN 2021)
2. Incorporate Special Contract Requirement: COVID-19 (Construction Only). Please note a COVID safety plan is required for submittal post-award.
3. Incorporate updated Wage Determination General Decision Number UT20210085 01/29/2021 for Salt Lake City County, UT
4. Update project milestones as follows:
Site visit attendee list, in writing, to Contracting Officer: Tuesday, 6/8/2021 @ 1200 CT
Site visit: Tuesday, 6/15/2021 @ 1000 CT (0900 MT)
Questions due from offerors: Tuesday, 6/22/2021 @ 1200 CT
Answers out to offerors: Tuesday, 6/29/2021
Proposals due: Tuesday, 7/6/2021 @ 1200 CT
5. Change AMS Clause 3.2.2.3-63 Site Visit (Construction) (JUL 2004) to the updated mandatory site visit date/time and site visit attendee list due date/time listed in #4 updated project milestones of Amendment 0002.
6. Change Clause SA19 Questions Regarding the Solicitation to the updated date/time listed in #4 updated project milestones of Amendment 0002.
_________________________________________________________________
Amendment 0001
This amendment is to postpone the mandatory site visit scheduled for Wednesday, 3/18/20 and any other due dates until further notice.
This project is to renovate the Salt Lake City ARTCC B-105 & B-107 restrooms per the solicitation specifications.
The work includes but is not limited to:
(1) Removal of floor and wall finishes; (2) Removal of water closets, shower stalls, vanities, urinals, toilets, door B-107, solid surfaces and various restroom accessories; (3) Removal of mechanical systems such as duct accessories, plumbing fixtures and associated piping; (4) Removal of electrical systems such as lighting fixtures, outlets and wiring; (5) Installation of new floor and wall finishes, partitions, solid surfaces, and new and relocated louvered door for B-107; (6) Installation of new mechanical components such as: duct accessories, sinks, toilets, urinals, shower stalls, and localized plumbing connectivity; (7) Installation of new electrical components such as: lighting, outlets, switches and wiring; and (8) Inspect and test existing floor drain in both restrooms, clear drains of any debris or resolve any deficiencies by repair of modifications to ensure proper drainage.
Update #4 ·
Amendment 0003
The purpose of this amendment is to:
1. Incorporate revised mask standard effective 5-27-21. The revised mask standard is in addition to the Special Contract Requirement: COVID-19 (Construction Only) clause provided in Amendment 0002.
2. Incorporate the questions and answers for SIR 697DCK-20-R-00186
________________________________________________________________________________________________________
Amendment 0002
This amendment is to:
1. Incorporate AMS Clause 3.6.4-24 Covered Telecommunications Equipment or Services - Representation (JAN 2021)
2. Incorporate Special Contract Requirement: COVID-19 (Construction Only). Please note a COVID safety plan is required for submittal post-award.
3. Incorporate updated Wage Determination General Decision Number UT20210085 01/29/2021 for Salt Lake City County, UT
4. Update project milestones as follows:
Site visit attendee list, in writing, to Contracting Officer: Tuesday, 6/8/2021 @ 1200 CT
Site visit: Tuesday, 6/15/2021 @ 1000 CT (0900 MT)
Questions due from offerors: Tuesday, 6/22/2021 @ 1200 CT
Answers out to offerors: Tuesday, 6/29/2021
Proposals due: Tuesday, 7/6/2021 @ 1200 CT
5. Change AMS Clause 3.2.2.3-63 Site Visit (Construction) (JUL 2004) to the updated mandatory site visit date/time and site visit attendee list due date/time listed in #4 updated project milestones of Amendment 0002.
6. Change Clause SA19 Questions Regarding the Solicitation to the updated date/time listed in #4 updated project milestones of Amendment 0002.
_________________________________________________________________
Amendment 0001
This amendment is to postpone the mandatory site visit scheduled for Wednesday, 3/18/20 and any other due dates until further notice.
This project is to renovate the Salt Lake City ARTCC B-105 & B-107 restrooms per the solicitation specifications.
The work includes but is not limited to:
(1) Removal of floor and wall finishes; (2) Removal of water closets, shower stalls, vanities, urinals, toilets, door B-107, solid surfaces and various restroom accessories; (3) Removal of mechanical systems such as duct accessories, plumbing fixtures and associated piping; (4) Removal of electrical systems such as lighting fixtures, outlets and wiring; (5) Installation of new floor and wall finishes, partitions, solid surfaces, and new and relocated louvered door for B-107; (6) Installation of new mechanical components such as: duct accessories, sinks, toilets, urinals, shower stalls, and localized plumbing connectivity; (7) Installation of new electrical components such as: lighting, outlets, switches and wiring; and (8) Inspect and test existing floor drain in both restrooms, clear drains of any debris or resolve any deficiencies by repair of modifications to ensure proper drainage.
Update #3 ·
Amendment 0002
This amendment is to:
1. Incorporate AMS Clause 3.6.4-24 Covered Telecommunications Equipment or Services - Representation (JAN 2021)
2. Incorporate Special Contract Requirement: COVID-19 (Construction Only). Please note a COVID safety plan is required for submittal post-award.
3. Incorporate updated Wage Determination General Decision Number UT20210085 01/29/2021 for Salt Lake City County, UT
4. Update project milestones as follows:
Site visit attendee list, in writing, to Contracting Officer: Tuesday, 6/8/2021 @ 1200 CT
Site visit: Tuesday, 6/15/2021 @ 1000 CT (0900 MT)
Questions due from offerors: Tuesday, 6/22/2021 @ 1200 CT
Answers out to offerors: Tuesday, 6/29/2021
Proposals due: Tuesday, 7/6/2021 @ 1200 CT
5. Change AMS Clause 3.2.2.3-63 Site Visit (Construction) (JUL 2004) to the updated mandatory site visit date/time and site visit attendee list due date/time listed in #4 updated project milestones of Amendment 0002.
6. Change Clause SA19 Questions Regarding the Solicitation to the updated date/time listed in #4 updated project milestones of Amendment 0002.
_________________________________________________________________
Amendment 0001
This amendment is to postpone the mandatory site visit scheduled for Wednesday, 3/18/20 and any other due dates until further notice.
This project is to renovate the Salt Lake City ARTCC B-105 & B-107 restrooms per the solicitation specifications.
The work includes but is not limited to:
(1) Removal of floor and wall finishes; (2) Removal of water closets, shower stalls, vanities, urinals, toilets, door B-107, solid surfaces and various restroom accessories; (3) Removal of mechanical systems such as duct accessories, plumbing fixtures and associated piping; (4) Removal of electrical systems such as lighting fixtures, outlets and wiring; (5) Installation of new floor and wall finishes, partitions, solid surfaces, and new and relocated louvered door for B-107; (6) Installation of new mechanical components such as: duct accessories, sinks, toilets, urinals, shower stalls, and localized plumbing connectivity; (7) Installation of new electrical components such as: lighting, outlets, switches and wiring; and (8) Inspect and test existing floor drain in both restrooms, clear drains of any debris or resolve any deficiencies by repair of modifications to ensure proper drainage.
Update #2 ·
Amendment 0001
This amendment is to postpone the mandatory site visit scheduled for Wednesday, 3/18/20 and any other due dates until further notice.
This project is to renovate the Salt Lake City ARTCC B-105 & B-107 restrooms per the solicitation specifications.
The work includes but is not limited to:
(1) Removal of floor and wall finishes; (2) Removal of water closets, shower stalls, vanities, urinals, toilets, door B-107, solid surfaces and various restroom accessories; (3) Removal of mechanical systems such as duct accessories, plumbing fixtures and associated piping; (4) Removal of electrical systems such as lighting fixtures, outlets and wiring; (5) Installation of new floor and wall finishes, partitions, solid surfaces, and new and relocated louvered door for B-107; (6) Installation of new mechanical components such as: duct accessories, sinks, toilets, urinals, shower stalls, and localized plumbing connectivity; (7) Installation of new electrical components such as: lighting, outlets, switches and wiring; and (8) Inspect and test existing floor drain in both restrooms, clear drains of any debris or resolve any deficiencies by repair of modifications to ensure proper drainage.
Update #1 ·
This project is to renovate the Salt Lake City ARTCC B-105 & B-107 restrooms per the solicitation specifications.
The work includes but is not limited to:
(1) Removal of floor and wall finishes; (2) Removal of water closets, shower stalls, vanities, urinals, toilets, door B-107, solid surfaces and various restroom accessories; (3) Removal of mechanical systems such as duct accessories, plumbing fixtures and associated piping; (4) Removal of electrical systems such as lighting fixtures, outlets and wiring; (5) Installation of new floor and wall finishes, partitions, solid surfaces, and new and relocated louvered door for B-107; (6) Installation of new mechanical components such as: duct accessories, sinks, toilets, urinals, shower stalls, and localized plumbing connectivity; (7) Installation of new electrical components such as: lighting, outlets, switches and wiring; and (8) Inspect and test existing floor drain in both restrooms, clear drains of any debris or resolve any deficiencies by repair of modifications to ensure proper drainage.
Files
| File | Type | Posted |
|---|---|---|
| 697DCK-20-R-00186_Amendment 0003.pdf | ||
| 697DCK-20-R-00186 Amendment 0002.pdf | ||
| 697DCK-20-R-00186 Amendment 0001.pdf | ||
| 697DCK-20-R-00186 Package.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity