Request for Proposal for a Cold Isostatic Press (CIP) Addendum 1

Closed Solicitation Posted

Solicitation number
RFP-A22-0879
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
333517 Machine Tool Manufacturing
PSC
3442 Hydraulic And Pneumatic Presses, Power Driven
Place of performance
Ames, Iowa 50011, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Ames Laboratory, under a prime contract with the U.S. Department of Energy (DOE), has a requirement for qualified vendors to provide a Cold Isostatic Press (CIP) as described in the attached Appendix B – CIP Specifications. The resultant subcontractor shall furnish all materials, personnel, facilities, support, and management necessary to meet these requirements.

This CIP will be used to consolidate metallic and ceramic powders into a highly dense green body prior to sintering. The powders in the CIP are to be protected and enclosed in a rubber or flexible plastic die. A high isostatic pressure (at least 45KSI) is required to achieve sufficient enough green density The CIP should have a vessel large enough to accommodate a mold having 3.5’’ equivalent diameter and 4.5” length.

See Attached Addendum 1 - Issued on 02/08/2021 - Includes questions submitted and answers as well as one add to the specifications and an attachment with quality assurance requirements.  

Update #1 ·

Ames Laboratory, under a prime contract with the U.S. Department of Energy (DOE), has a requirement for qualified vendors to provide a Cold Isostatic Press (CIP) as described in the attached Appendix B – CIP Specifications. The resultant subcontractor shall furnish all materials, personnel, facilities, support, and management necessary to meet these requirements.

This CIP will be used to consolidate metallic and ceramic powders into a highly dense green body prior to sintering. The powders in the CIP are to be protected and enclosed in a rubber or flexible plastic die. A high isostatic pressure (at least 45KSI) is required to achieve sufficient enough green density The CIP should have a vessel large enough to accommodate a mold having 3.5’’ equivalent diameter and 4.5” length.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors