About this opportunity

This pre-solicitation notice is for a small business set-aside contract to replace the fiber optic line at the Wyoming Air National Guard in Cheyenne. The Department of the Army National Guard will provide plans and specifications for a contractor to install a duct bank and maintain communications between buildings on site to support the replacement of the fiber optic and copper lines. The formal solicitation will be released on April 21, 2022 via SAM.gov as solicitation number W50S8W-22-R-0003, with proposals due 30 days thereafter. Evaluation criteria will include the ability to perform the work while maintaining critical communications on base.

The contract is set aside for total small businesses and has a NAICS code of 237130. The estimated value is between $250,000 and $500,000 to complete the replacement within the timeline of the project plans. This infrastructure installation will support the fiber optic and copper lines connecting Building 20, Building 31A, and Building 37 at the Wyoming Air National Guard base in Cheyenne. The place of performance will be on site, and interested parties should contact the contracting office for additional details.

Notice text

The work covered by this specification consists of furnishing all labor, equipment and material and performing all work to: install a duct bank to replace fiber optic line. This is a SRM project with plans and specifications provided for the project. The plans for this project were integrated into Replace Security Forces (DPEZ 029038). All work must be performed to maintain communications, install new utility, and reconstruct all damaged or excavated areas. Communication lines include, but not limited to connecting Building 20, Building 31A, Building 37 and any other communications associated with the project site, must be maintained throughout the project. This project does not install the fiber optic or copper lines but provides all infrastructure in order to facilitate the lines (see attached plans). Plans specifically related to the fiber optic line and Specifications 27 10 00, 27 13 23.00 40, and 27 21 10.00 40 are included as part of this project.

Files

File Type Posted
Pre-Solicitation Letter.docx DOCX document

Notice history

Notice Type Posted
Construct Fiber Optic Path, Underground Conduit Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Womble Work Center Fiber Optic Installation Mount Ida, Arkansas 71957, United States · NAICS 238210 Region 8 - Southern Region Total Small Business
PKA Relocatable Facility FE Warren AFB, Wyoming 82005, United States · NAICS 332311 Global Strike Command Total Small Business