Replace Domestic Water Pump and Generator
Awarded Limited / Sole Source Justification Posted
- Solicitation number
- 36C26225C0089
- Agency
-
Veterans Integrated Service Network 22
Veterans Health Administration, Department of Veterans Affairs
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- 36C26225C0089 Federal contract award
- Awardee
- SRD Architects Inc.
- NAICS code
- 541330 Engineering Services
- Place of performance
- Long Beach, California 90822, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 has issued a Limited / Sole Source Justification Notice for architecture and engineering services related to project 600-20-112, which involves replacing a domestic water pump and generator at the Tibor Rubin VA Long Beach Medical Center. SRD Architects was awarded contract 36C26225C0089 for $308,582.04 through a sole source justification, primarily because they were the original designer of record from a previous FY18 contract and needed to secure construction period services. The justification is based on the project not receiving construction funding during the original performance period, necessitating a follow-on contract to complete the work. The construction period is estimated to take 18-24 months, and the contract was awarded under the authority of "Only One Responsible Source" as per 41 USC 3304(a)(1). No market research was conducted, as SRD Architects was already established as the designer of record, and no future acquisitions of these services are anticipated.
Notice text
Justification and approval to award a sole source contract for architecture/engineering services for project 600-20-112 Replace Domestic Water Pump and Generator. This is a follow-on contract from a previous FY18 contract whose funds expired. SRD Architects is the designer of record and their previous contract included construction period services. Due to the project not being funded for construction during the original performance period, this contract will secure those services for the construction period of the design. Once awarded, construction is estimated to take 18-24 months. The estimated cost of these services is $308,582.04.
Awarded contract 36C26225C0089 to unknown vendor for unknown amount on 2025-02-04.
Files
| File | Type | Posted |
|---|---|---|
| PG_Part806.3_Atch1_FAR6_JA_OVER_SAT 36C26225C0089 CO Signed_BC.pdf |