Replace Asbestos Containing Ceiling Panels in various Buildings, Camp Algier, USAG Bavaria, Grafenwoehr Military Community
Award Notice Posted
- Solicitation number
- W912PB-16-B-8101
- Agency
-
RCO Bavaria 409th CSB
Expeditionary Contracting Command, Department of Defense
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912PB-16-C-8102 Federal contract award
- NAICS code
- 238310 Drywall and Insulation Contractors
- PSC
- Not on record
- Place of performance
- Field Camp Algier, Usag Bavaria, Grafenwoehr Military Community - Tower Barracks Grafenwoehr, Non-U.S. 92655 Germany
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Perform an asbestos remediation in the troop barracks buildings # 2121, 2122, 2123, 2262, 2263
Update #1 ·
Perform an asbestos remediation in the troop barracks buildings # 2121, 2122, 2123, 2262 and 2263. The ceiling lining of the rooms consists of asbestos cement panels which have to be dismounted up to the wooden roof truss and disposed of by a certified expert firm.
Dismount the mineral-fiber insulation placed on the ceiling lining and dispose of, too.
Afterwards, install a new, thermally insulated dry-construction ceiling.
Dismount and dispose of the existing ceiling lighting, smoke detectors and distribution boxes. Thereafter, install new ceiling light fixtures, emergency lighting, smoke detectors and distribution panels.
Paint the new ceiling and all walls.
The four buildings are equally constructed. A longitudinal, centrally located partition wall divides each building into two sleeping rooms of the same size. Each room has individual accesses from the outside.
The sleeping rooms are furnished with bunk beds which must be temporarily stored in a different place and afterwards returned to their original position by the contractor.
Exterior dimensions of each Building: 25.50 m x 12.00 m
Eaves height: 3.00 m
Ridge height: 4.00 m
Dimensions of the individual asbestos cement ceiling panels: 1.25 m x 2.50 m.
Files
| File | Type | Posted |
|---|---|---|
| 04_-_Amendment_0001.pdf | ||
| 03_-_W912PB-16-B-8101.pdf | ||
| 01_-_IFB_Cover_Letter.pdf | ||
| Attachment_I_-_Specification_v_2_23_MAR_2016.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity