- Contract number
- N69450-17-D-7215 N6945018F2684 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
The contractor shall remove all existing sinkhole washout and debris from the nearby storm
water culvert and the existing sinkhole area to successfully accomplish this repair work.
3. The Contractor shall remove existing broken 12†water main, and provide a Type B crossing
beneath the existing storm water pipe per the detail provided on page 3 of this Statement of
Work. A minimum of 12†of vertical clearance shall be provided between the bottom of the
existing storm water pipe and the crown of the water main. The new potable water pipe that is
installed for this utility transition is to match the existing ductile iron pipe material and
restrained mechanical joints shall be utilized in accordance with pages 3 and 4 of this statement
of work.
4.
The Contractor shall investigate the depth of the existing 24†water main running parallel to the
12†water main to confirm that a minimum of 12†is provided between the bottom of the storm
water pipe and the crown of the water main. The contractor shall dig no more than 24†below
the existing storm water pipe to confirm the minimum 12†clearance exists.
The Contractor shall restore the bedding material layer beneath the existing storm pipe. The
bedding material shall consist of clean sand (SP or SM). The thickness of the bedding material
layer shall be 12†minimum.
6. The Contractor shall wrap the storm pipe joints with geotextile fabric type Dâ€3 and install in
accordance with the FDOT design standards, index no.
280, sheet no. 1 attached to this SOW.
7. The Contractor shall neatly sawcut and remove the existing asphalt pavement at least 5 feet
from edge of failed pavement. The limits for removal of existing base course and underlying
material shall be established by offsetting the limits of existing asphalt removal inward (toward
the sinkhole) by 1 foot. This will leave 1 foot of existing base course around the perimeter of the
repair area on which the new asphalt layer can overlap.
8. The Contractor shall provide clean suitable backfill material. The backfill material shall be
compacted to 95% maximum density (ASTM D1557).
9. The Contractor shall construct 12†of stabilized subgrade (LBR 40), 10†base (Group 9), 1.5â€
asphalt structural course (SPâ€12.5), and 1.5†asphalt friction course (SPâ€12.5).
The surface
grades shall match the existing adjacent surface grades with no abrupt changes in grade
elevation at the interface. The typical section for this area is shown within the red box on Tâ€101,
and the design crossâ€section is shown on XSâ€102 with a red box identifying the station nearest
the work area.
10. The Contractor shall construct concrete curb and gutter (Type F) to match the existing adjacent
curb and gutter. The slope of the gutter shall match the existing adjacent curb and gutter to
ensure positive drainage.
11. The Contractor shall construct 4†thick concrete sidewalk to match the existing adjacent
concrete sidewalk.
12. The Contractor shall paint pavement markings on the new asphalt surface in the work area as
shown on SMâ€102.
13.
The contractor is responsible for providing all detour signage, barricades, and traffic cones for
rerouting of traffic for the duration of this sinkhole repair job.
14. The contractor shall flush and chlorinate the newly replaced sections of potable water line and
take two consecutive bacteriological samples upstream and downstream along those potable
water line sections showing that no total coliforms or E. Coli bacteria is present in accordance
with Florida DEP drinking water compliance standards. The contractor shall also ensure any
required boiled water notices and rescissions are distributed to the affected tenants. The
bacteriological results are to be sent to the water system utilities commodity manager.
15.
The Contractor shall install Bahia sod on all nonâ€paved disturbed areas. The sod shall be
adequately watered to promote establishment of the turf.
16. The Contractor shall comply with the applicable specification requirements from the Massey
Avenue Corridor Improvements project (Contract No. N69450â€10â€Dâ€0001). The specifications
from the referenced project shall provide detailed instruction concerning products, testing,
execution, etc. when needed to complete the work.