Repair Starship B6007 Barracks at Fort Sill Oklahoma
Award Notice Posted
- Solicitation number
- W912BV18R0029
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Awarded
- to Harper Construction Company, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912BV18C0017 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- Fort Sill, OK Lawton, Oklahoma 73503, United States
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Awarded Vendors: HARPER CONSTRUCTION COMPANY. Contract Award Dollar Amount: $46,514,101.00. Contract Award Date: 2018-09-27.
Update #4 ·
SOLICITATION W912BV18R0029 ISSUED..
Update #3 ·
SOLICITATION W912BV18R0029 ISSUED.
Update #2 ·
REPAIR STARSHIP B6007, Training Barracks Upgrade Program (TBUP), FORT SILL, OKLAHOMA
This requirement will be solicited as a design-build, 2-phase unrestricted procurement and the cost magnitude of this construction project is $25 to $100 million dollars with an estimated performance period of 540 calendar days.
This project is to repair the failed and failing components of the existing Basic Training Starship Barracks Building Number 6007 at Fort Sill, OK.
Work includes but is not limited to repairs to the domestic water, sanitary sewer, gas distribution, HVAC, lighting and electrical systems as well as interior finishes and furnishings. Also included are repairs to administrative areas, sleeping areas, latrines, laundry rooms, and mechanical rooms. Project also includes demolition and conversion of existing internal dining facilities to classrooms. Any mold and lead based paint encountered will be removed.
.
Update #1 ·
REPAIR STARSHIP B6007, Training Barracks Upgrade Program (TBUP), FORT SILL, OKLAHOMA
This requirement will be solicited as a design-build, 2-phase unrestricted procurement and the cost magnitude of this construction project is $25 to $100 million dollars with an estimated performance period of 540 calendar days.
This project is to repair the failed and failing components of the existing Basic Training Starship Barracks Building Number 6007 at Fort Sill, OK.
Work includes but is not limited to repairs to the domestic water, sanitary sewer, gas distribution, HVAC, lighting and electrical systems as well as interior finishes and furnishings. Also included are repairs to administrative areas, sleeping areas, latrines, laundry rooms, and mechanical rooms. Project also includes demolition and conversion of existing internal dining facilities to classrooms. Any mold and lead based paint encountered will be removed.
Files
| File | Type | Posted |
|---|---|---|
| W912BV18C0017_B6007_TBUP_Fort_Sill.pdf | ||
| W912BV18R0029.pdf | ||
| DRAFT_(Phase_1)_Section_01_10_10_RFP_3-6-18.PDF |