Repair of Water Storage Tank

Award Notice Posted

Solicitation number
191BWC18R0009
Agency
Awarded
to TMI Coatings, LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
191BWC18C0007 Federal contract award
NAICS code
332420 Metal Tank (Heavy Gauge) Manufacturing
PSC
Not on record
Place of performance
Amistad Hydroelectric Power Plant Del Rio, Texas, United States

Notice details come from SAM.gov. Updated .

Notice text

7 versions

Update #7 · Latest ·

Awarded Vendors: TMI Coatings. Contract Award Dollar Amount: 208500. Contract Award Date: 2018-09-28.

Update #6 ·

The purpose of this amendment is to incorporate the following changes:
An organized site visit has been scheduled for August 1, 2018 at 10:00am PDT at 670 Texas Spur 349, Del Rio, TX 78840.
Those attending a site visit need a government issued ID such as a driver's license.
Date/times for another site visit may be arranged upon request (depending on availability of IBWC staff); but cannot be guaranteed..

Update #5 ·

The purpose of this amendment is to incorporate the following changes:

An organized site visit has been scheduled for August 1, 2018 at 10:00am PDT at 670 Texas Spur 349, Del Rio, TX 78840.

Those attending a site visit need a government issued ID such as a driver's license.

Date/times for another site visit may be arranged upon request (depending on availability of IBWC staff); but cannot be guaranteed.

Update #4 ·

THIS IS THE SOLICITATION NOTICE. THE USIBWC IS REQUESTING PROPOSALS AT THIS TIME. Please refer to the solicitation package.

The United States Section of the International Boundary and Water Commission (USIBWC) plans to issue a solicitation (negotiated) for the purpose of repairing the Water Storage Tank and leaking pipes at Amistad Hydroelectric Power Plant and surroundings located in Del Rio, Texas.


The major repair efforts include, but not limited to the following tasks:
1. Remove and Repair the Elevated Water Storage Tank
2. Remove and Repair the 6 inch steel pipe supplying water to the Water Storage Tank
3. Surface preparation and painting the exterior/interior of the Elevated Water Storage Tank and the Structural Steel Frame Support
4. Disinfection of the Elevated Water Storage Tank and the piping systems
5. Removed and replaced all valves, pressure gauges and fittings


The water volume capacity is 25,000 gallons and sits on a 100-ft. elevated steel frame structure. The objective is to Repair of the Water Storage Tank to meet the requirements of American Water Works Association (AWWA) standards, TCEQ and EPA.


The work is located in Amistad Hydroelectric Power Plant and surroundings located in Del Rio, Texas. A site visit date will be listed in the solicitation. The work will be performed under NAICS Code 332420. The contract will be firm-fixed price.
The solicitation, plans, and specifications are expected to be posted on or about June 18, 2018 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by June 18, 2018 that is because the solicitation is not available for posting). The solicitation will be available for a minimum of thirty (30) calendar days.


This is a Presolicitation Notice. The Solicitation will include information on how to obtain the plans and specifications. All responsible sources may submit a proposal to be considered by the Agency.

.

Update #3 ·

THIS IS THE SOLICITATION NOTICE. THE USIBWC IS REQUESTING PROPOSALS AT THIS TIME. Please refer to the solicitation package.

The United States Section of the International Boundary and Water Commission (USIBWC) plans to issue a solicitation (negotiated) for the purpose of repairing the Water Storage Tank and leaking pipes at Amistad Hydroelectric Power Plant and surroundings located in Del Rio, Texas.


The major repair efforts include, but not limited to the following tasks:
1. Remove and Repair the Elevated Water Storage Tank
2. Remove and Repair the 6 inch steel pipe supplying water to the Water Storage Tank
3. Surface preparation and painting the exterior/interior of the Elevated Water Storage Tank and the Structural Steel Frame Support
4. Disinfection of the Elevated Water Storage Tank and the piping systems
5. Removed and replaced all valves, pressure gauges and fittings


The water volume capacity is 25,000 gallons and sits on a 100-ft. elevated steel frame structure. The objective is to Repair of the Water Storage Tank to meet the requirements of American Water Works Association (AWWA) standards, TCEQ and EPA.


The work is located in Amistad Hydroelectric Power Plant and surroundings located in Del Rio, Texas. A site visit date will be listed in the solicitation. The work will be performed under NAICS Code 332420. The contract will be firm-fixed price.
The solicitation, plans, and specifications are expected to be posted on or about June 18, 2018 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by June 18, 2018 that is because the solicitation is not available for posting). The solicitation will be available for a minimum of thirty (30) calendar days.


This is a Presolicitation Notice. The Solicitation will include information on how to obtain the plans and specifications. All responsible sources may submit a proposal to be considered by the Agency.

Update #2 ·

This is Only a Presolicitation Notice. A forthcoming solicitation will include information on how to obtain all relevant documentation. All responsible sources may submit a proposal to be considered by the Agency when the solicitation is posted.
This is NOT a request for proposal. Please do not submit a proposal in response to this Presolicitation Notice.

The United States Section of the International Boundary and Water Commission (USIBWC) plans to issue a solicitation (negotiated) for the purpose of repairing the Water Storage Tank and leaking pipes at Amistad Hydroelectric Power Plant and surroundings located in Del Rio, Texas.


The major repair efforts include, but not limited to the following tasks:
1. Remove and Repair the Elevated Water Storage Tank
2. Remove and Repair the 6 inch steel pipe supplying water to the Water Storage Tank
3. Surface preparation and painting the exterior/interior of the Elevated Water Storage Tank and the Structural Steel Frame Support
4. Disinfection of the Elevated Water Storage Tank and the piping systems
5. Removed and replaced all valves, pressure gauges and fittings


The water volume capacity is 25,000 gallons and sits on a 100-ft. elevated steel frame structure. The objective is to Repair of the Water Storage Tank to meet the requirements of American Water Works Association (AWWA) standards, TCEQ and EPA.


The work is located in Amistad Hydroelectric Power Plant and surroundings located in Del Rio, Texas. A site visit date will be listed in the solicitation. The work will be performed under NAICS Code 332420. The contract will be firm-fixed price.
The solicitation, plans, and specifications are expected to be posted on or about June 18, 2018 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by June 18, 2018 that is because the solicitation is not available for posting). The solicitation will be available for a minimum of thirty (30) calendar days.


This is a Presolicitation Notice. The Solicitation will include information on how to obtain the plans and specifications. All responsible sources may submit a proposal to be considered by the Agency.

.

Update #1 ·

This is Only a Presolicitation Notice. A forthcoming solicitation will include information on how to obtain all relevant documentation. All responsible sources may submit a proposal to be considered by the Agency when the solicitation is posted.
This is NOT a request for proposal. Please do not submit a proposal in response to this Presolicitation Notice.

The United States Section of the International Boundary and Water Commission (USIBWC) plans to issue a solicitation (negotiated) for the purpose of repairing the Water Storage Tank and leaking pipes at Amistad Hydroelectric Power Plant and surroundings located in Del Rio, Texas.


The major repair efforts include, but not limited to the following tasks:
1. Remove and Repair the Elevated Water Storage Tank
2. Remove and Repair the 6 inch steel pipe supplying water to the Water Storage Tank
3. Surface preparation and painting the exterior/interior of the Elevated Water Storage Tank and the Structural Steel Frame Support
4. Disinfection of the Elevated Water Storage Tank and the piping systems
5. Removed and replaced all valves, pressure gauges and fittings


The water volume capacity is 25,000 gallons and sits on a 100-ft. elevated steel frame structure. The objective is to Repair of the Water Storage Tank to meet the requirements of American Water Works Association (AWWA) standards, TCEQ and EPA.


The work is located in Amistad Hydroelectric Power Plant and surroundings located in Del Rio, Texas. A site visit date will be listed in the solicitation. The work will be performed under NAICS Code 332420. The contract will be firm-fixed price.
The solicitation, plans, and specifications are expected to be posted on or about June 18, 2018 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by June 18, 2018 that is because the solicitation is not available for posting). The solicitation will be available for a minimum of thirty (30) calendar days.


This is a Presolicitation Notice. The Solicitation will include information on how to obtain the plans and specifications. All responsible sources may submit a proposal to be considered by the Agency.

Files

File Type Posted
Amendment_0001.pdf PDF
J.01_Annual_TCEQ_Tank_Inspection_2018-02-28.pdf PDF
J.02_SCA_Wage_Determination_2015-5303_Rev_No._9.pdf PDF
191BWC18R0009.pdf PDF
J.03_SOW.pdf PDF